Last updated: August 9, 2013
Plan for the future urban development and conservation of Lots 37, 38 and Part Lot 39 Elizabeth Street, Lots 2, 3, and 286 Alison Parade, Lot 1000, 1001 and Part Lot 42 Lower King Road, Part Lot 1 Yatana Road, Location 476 Sibbald Road and Lot 0 Bayonet Head, within the Bayonet Head Outline Development Plan Area (as defined in City of Albany Town Planning Scheme No. 3). Read more...Last updated: June 26, 2013
Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...Last updated: June 12, 2013
Inquiry under s46 - request to to amend Ministerial Statement 830 to contemporise and rationalise existing conditions. Read more...Last updated: June 4, 2013
This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by the Shire of Manjimup to construct, operate and maintain a 6.5 kilometre (km) long all-weather, year-round access track from Windy Harbour Road to Nelson Location 7965, located entirely within the Doggerup Road reserve. Read more...Last updated: April 29, 2013
The development and operation of a quarry. Inquiry under s46 to delete conditions 11, 12 and 17 of Ministerial Statement 706 and condition 6 of Ministerial Statement 872 . Read more...Last updated: March 27, 2013
Proposal by Robe River Mining Company Pty Ltd to mine iron ore at Mesa A/Warramboo. This report has been prepared in response to a request from the Minister under section 43(1) of the, Environmental Protection Act 1986, (EP Act) that the EPA re-assess the proposal in the light of additional information provided by the proponent. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 25, 2013
The implementation of a three year, pilot scale Mulloway (, Argyrosomus hololepidotus, ) and Yellowtail Kingfish (, Seriola lalandi, ) seacage aquaculture trial in the Zeewijk Channel, Abrolhos Islands (approximately 75 kilometres west of Geraldton), as documented in schedule 1 of Ministerial Statement 649 . Inquiry into request under section 46 for extension of time limit. Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: January 11, 2013
Brockman Iron Pty Ltd is proposing to construct a railway line and associated infrastructure in the Hamersley Iron province in the Pilbara region of Western Australia, approximately 100 kilometres (km) north west of Newman. The railway line would be approximately 79 km in length. The proposal will connect the previously approved Brockman Marillana Iron Ore Project ( Ministerial Statement 855 ) to the existing Fortescue Metals Group (FMG) railway line. Read more...Last updated: January 11, 2013
The proposal is to develop and operate an iron ore mine on the Blacksmith tenement located approximately 70 km north-west of Tom Price in the Pilbara region of Western Australia. Read more...Last updated: December 20, 2012
The proposal is for seven borrow pits in the Millstream Chichester National Park (MCNP) where up to 118 hectares (ha) will be disturbed, of which 90 ha is within the national park and the remainder in the excised rail corridor. All borrow pits within the MCNP are within existing Rio Tinto Iron Ore licence areas granted under the, Mining Act 1978, (Robe River Mining Company is a subsidiary of Rio Tinto) and all borrow material will only be used for projects or portions of projects that are... Read more...Last updated: December 4, 2012
The proposal is for mining of iron ore below the watertable from the Orebody 23 deposit on the Ophthalmia Range, including de-watering operations, approximately 13 kilometres north-east of Newman, Shire of East Pilbara. Read more...Last updated: October 22, 2012
To develop an open-cut vanadium mine and process plant at Barrambie, 75 kilometres north-west of the Sandstone townsite and 116 kilometres south-east of Meekatharra Read more...Last updated: August 1, 2012
The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...Last updated: July 6, 2012
The proposal is to mine iron ore from the Stage 1 project area on the southern slopes of the Chichester Range and develop associated mining infrastructure. Inquiry under s46 into request to change condition 9 of Ministerial Statement 824 - Short-Range Endemic Invertebrates. Read more...Last updated: June 19, 2012
The proposal is to construct and operate approximately 70 km of duplicate rail line and supporting infrastructure from the Cape Lambert Port facilities to Emu Siding. Read more...Last updated: March 28, 2012
The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...Last updated: March 28, 2012
The proposal is to construct and operate a second port (Port B) at Cape Lambert to process and export up to 130 million tonnes of ore per annum. Read more...Last updated: March 12, 2012
The proposal is for the mining of a 53-hectare area and processing of approximately 1.3 million tonnes of gypsum recovered from Mining Lease 70/1161 using the facilities currently employed for operations in the adjacent Mining Lease 70/750. The proposal involves dredging and will form a permanent hypersaline water body of approximately four metres maximum depth. Dredging operations are proposed to be undertaken every second year over a 2 to 4 week period to excavate approximately 100,000 tonnes... Read more...