Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: January 9, 2012
The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: October 24, 2011
The proposal is to develop and operate an open pit nickel mine and associated infrastructure on Mining Lease 77/00583 and haulage road on Mining Lease 77/00545 within the Shire of Kondinin. Read more...Last updated: August 5, 2011
The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...Last updated: April 21, 2011
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...Last updated: November 4, 2010
Identification of potential corridors and areas for future installation of water and waste water pipelines and associated infrastructure throughout the southern suburbs of Perth. Read more...Last updated: October 28, 2010
The proposal is to develop an iron ore mine at the Koolyanobbing Iron Ore Project-Mt Jackson J1 Deposit (Mt Jackson J1 Deposit), located approximately 110 kilometres (km) north-north-east of Southern Cross in the Shire of Yilgarn. The proposal includes two mine pits to extract approximately 33 million tonnes of iron ore and associated mining infrastructure. The proposed mine required disturbance of approximately 605 hectares (ha) of native vegetation for pits, associated mine infrastructure,... Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: July 8, 2010
BHP Billiton Iron Ore is proposing to develop the Orebody 24 (OB24) deposit located north of Orebody 25 (OB25) Mine, and approximately 10 km north-east of the town of Newman in the Pilbara Region. New and existing OB25 infrastructure would be utilised. Read more...Last updated: June 30, 2010
The proposal is to construct and operate a minimum 50 GL/annum and up to 100 GL/annum desalination plant on Lots 32 and 33, and Part Lot 8 Taranto Road, Binningup; marine inlet/outlet pipes; and a water supply pipeline to transport potable water to the Integrated Water Supply Scheme via a storage facility near Harvey. Read more...Last updated: June 15, 2010
The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...Last updated: December 23, 2009
Proposal to develop and operate an open-cut iron ore mine with infrastructure and utilities located in the Cape Preston region, 80 km south-west of Karratha by Mineralogy Pty Ltd. Read more...Last updated: December 15, 2009
The Red October Gold Project is located on the western shore of Lake Carey, 80km south of Laverton. The proposal is to mine approximately 16 million tonnes of ore and associated waste material over a two year period involves development of an open cut gold mine and waste rock dumps on the lake bed and construction of mine infrastructure and borrow pits on Anglefish Island adjacent to the mining pit. Read more...Last updated: December 1, 2009
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...Last updated: November 2, 2009
Midland Brick Company Pty Ltd (Midland Brick) referred a proposal to the Environmental Protection Authority (EPA) on 3 May 2002 to indefinitely extend the time limit of its environmental approval for its clay excavation operation at Hallet and Copley Roads, Upper Swan and to expand the environmental approval to include Lot 19 Copley Road, Lots 19, 45 and 46 St Albans Road and Lot 100 Great Northern Highway, Upper Swan for further clay excavation operations. The new areas to be included in the... Read more...