1192 - Turkey Point Access Road and Bridge
Information:
Attachment 1 to Statement 1192 - Amendments to introduction, condition 1, figure and schedule 1. Change to statement approved under s. 45C on 5 September 2024.
Attachment 2 to Statement 1192 - The proposed amendments to proposal and implementation conditions include
• an increase to the development envelope by 0.015 ha (from 6.91ha to 6.925 ha)
• a change to condition 1 to amend Figure 1 that defines the development envelope location and maximum extent of the proposal
• a change to condition 3-4 to amend the timeframe by 30 days for which the temporary construction causeway must be removed from the river, from 1 May to 31 May. Change to statement approved under s. 45C on 17 March 2025.
Ministerial Statement File:
Date of approval:
July 7, 2022
Go to the full case view of this Proposal: