Yogi Magnetite Project

Project
Proposal description

FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo.

The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network.

Mining of the magnetite will occur below groundwater and will include a simple open cut operation with clearing and topsoil stockpiling, overburden drilling and blasting followed by conventional removal with truck.

The proposal includes the following key components:

  • Mine pit (clearing of no more than 200 ha);
  • Mining overburden and waste facilities (clearing of no more than 400 ha);
  • Processing waste containment facilities (clearing of no more than 500 ha);
  • Mine and processing support infrastructure (clearing of no more than 2000ha); and
  • Magnetite slurry pipeline, water pipeline and gas pipeline (clearing of no more than 1500 ha).
Assessment Number
2154
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
3. Assessment
Scoping
Environmental scoping document
Approved
Environmental Review
Environmental Review documentation
Date Published (Environmental Review documentation)
Proponent response to submissions
Date published (Proponent response to submissions)
Change to proposal during assessment under s. 43A
4. EPA Report on assessment
EPA Report Number
1761
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes