West Erregulla Field Development Program

Project
Proposal description

Strike West Pty Ltd propose to extract gas from the West Erregulla gas field by constructing and operating a gathering system to connect its gas field and convey the extracted gas to an upstream separating facility. The proposal will supply gas to a third party operated gas processing facility, subject to separate approvals.  

The proposal is located within the Shires of Three Springs and Mingenew in the Midwest region of Western Australia, approximately 50 kilometres (km) south-east of Dongara and 234 km north of Perth. 

The proposal includes a flowline gathering network system to convey gas from four existing approved wells and two new conventional wells to an upstream facility, remote terminal unit, metering and corrosion inhibitor chemical injection system at each well site, and an upstream facility consisting of a slug catcher, pigging tie-in points, sump tanks and common manifold. The proposal terminates at the gas and liquids transfer point. 

The proposal will result in the clearing of up to 38.53 hectares (ha) of native vegetation within a 93.97 ha Development Envelope. 

The life of the proposal is for 20 years.

Assessment Number
2308
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
Date published
3. Assessment
Environmental Review
Date Published (Environmental Review documentation)
Date published (Proponent response to submissions)
Change to proposal during assessment under s. 43A
Date of approval s. 43A
4. EPA Report on assessment
EPA Report Number
1748
Key Environmental Factors
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info