Fortescue Metals Group Limited is proposing to increase the footprint and mining life of the Solomon Iron Ore Project. The proposal consists of expanding mining operations and rail infrastructure beyond the current footprint. Fortescue Metals Group Limited is also seeking approval for an external borefield to provide an additional water supply to support the expansion.

The extent of proposed ground disturbance is approximately:

  • 11,322 hectares for the mine expansion within a development envelope of 33,520 hectares;
  • 700 hectares for an additional external borefield within an development envelope of 33,712 hectares; and
  • 476 hectares for additional permanent rail infrastructure within the 29,257 hectare rail corridor envelope (which includes a spur).

The combined area of disturbance is approximately 12,498 hectares. This is in addition to the 6,297 hectares of disturbance area approved under Ministerial Statement No. 862 for the original proposal, and results in a total disturbance footprint of 18,795 hectares.

Assessment Number
2019
Region
Referred under EP Act
s38
Industry sector
Last updated
1. Referral
2. Decision on whether to assess this proposal
3. Assessment
4. EPA Report on assessment
EPA Report Number
1588
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments

Proposal to develop and operate the Solomon Iron Ore Mine, located approximately 60 kilometres north of Tom Price, including the Southern Borefield and Lower Fortescue Borefield, and operate the existing Hamersley Rail line.
The proposal is a revision of the Solomon Iron Ore Project, the subject of Statement No. 862 dated 20 April 2011.

Date of approval
Post-assessment changes
s. 45C amendments

Attachment 1 to Ministerial Statement 1062 - Expand the Mine Development Envelopment (MDE) from 36,602 ha to 37,061 ha (an increase of 459 ha) to cater for the creation of three separate groundwater supplementation areas (Collectively referred to as the Groundwater Supplementation Area (GSA)). Increase the authorised extent of clearing within the Railway Development Envelope (RDE) from 2,174 ha to a revised total of 2,324 ha (an increase of 150 ha). Allow water supply for the Lower Fortescue Borefield to be abstracted from within the RDE. Change to proposal approved under s. 45c on 7 June 2023.

Attachment 2 to Ministerial Statement 1062 - Change to the existing proposal description to account for the construction and operation of power generation facilities including a solar photovoltaic (PV) farm. Change in the indicative disturbance footprint within the authorised Development Envelope. Change to proposal approved under s. 45c on 04 March 2026.

Date of approval s. 45C