Project Proponent State Energy Commission of Western Australia Proposal description The proposal is to construct a power transmission line, with an associated corridor, between the existing Northern Terminal substation and a gas turbine power station at Pinjar which is presently under construction. Assessment Number 214 Region Perth Referred under EP Act s38 Industry sector Infrastructure Last updated April 30, 1990 Current Status Ministerial Statement published 2. Decision on whether to assess this proposal Chair's Determination Assess - Public Environmental Review Date published Friday, February 3, 1989 - 12:00 3. Assessment Scoping Approved Sunday, February 5, 1989 - 12:00 Environmental Review Environmental Review documentation PER document (PDF, 1.73 MB) Appendices to the PER (PDF, 15.96 MB) 4. EPA Report on assessment EPA Report Number 420 EPA Report Proposed Transmission Line Corridor Northern Terminal Substation to Pinjar Gas Turbine Power Station (PDF, 1.21 MB) Date published Monday, December 18, 1989 - 12:00 5. Decision on proposal and implementation of proposal Ministerial Statement Date of approval Monday, April 30, 1990 - 12:00 Ministerial Statement Ministerial Statement 98 (PDF, 163.05 KB)