Project Proponent State Energy Commission of Western Australia Proposal description In 1991, the State Energy Commission of Western Australia presented the Environmental Protection Authority with a number of alternatives for supplying power to the proposed Beenup mineral sands mine. These alternatives included on-site generation by the mining company, alternative technologies such as solar and wind power and a number of transmission line options. Assessment Number 813 Region South West Referred under EP Act s38 Industry sector Infrastructure Last updated March 23, 1994 Current Status Ministerial Statement published 2. Decision on whether to assess this proposal Chair's Determination Consultative Environmental Review Preliminary Environmental Factors Flora and Vegetation Terrestrial Environmental Quality Date published Saturday, June 19, 1993 - 12:00 3. Assessment Environmental Review Environmental Review documentation CER - Proposed 132kv transmission line, Manjimup to Beenup Mineral Sands Mine (PDF, 23.91 MB) 4. EPA Report on assessment EPA Report Number 707 EPA Report EPA Report 707 (PDF, 1.57 MB) Key Environmental Factors Flora and Vegetation Terrestrial Environmental Quality Date published Thursday, October 14, 1993 - 12:00