Port Mandurah Canal Estate Stage 2

Project
Proposal description

The main components of the proposal are:

  • a Conservation and Foreshore Reserve of approximately 23.9ha along the Mandurah Channel frontage of the development site;
  • approximately 500 single residential waterside lots (R 15 and R20) established along the margins of 33ha of canal waterways, which will be linked with the existing canal system within the Port Mandurah Stage 1 development and the Mandurah Channel;
  • two areas of communal (group) housing development (R 40) covering 2. 7ha and providing 110 residences;
  • a heritage precinct of 1.4ha comprising the Old Sutton farm buildings and associated helitage features;
  • 5.2ha of Public Open Space, to include a historical graveyard and two sites of Aboriginal cultural heritage; and
  • new bridges where the main canal system passes under Mary Road and Old Coast Road, along with other smaller bridges within the canal development.

The project would be developed in four phases over a period of five to eight years.

Assessment Number
731
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
Scoping
Approved
Environmental Review
4. EPA Report on assessment
EPA Report Number
790
Date published
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email