Optimised Mardie Project

Project
Proposal description

Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. 

The Proposal includes the expansion of the approved Mardie Project (Ministerial Statement [MS] 1175) including expanded concentrator and crystalliser ponds, an increased salt and SoP production rate, new secondary seawater intake option, a port facility laydown area, a quarry, and minor changes to the dredge channel. 

The Proposal is a significant amendment to the Original Proposal approved under MS 1175, specifically to: 

  • Increase the Terrestrial Development Envelope by 3,978 ha. 

  • Increase in disturbance within the Terrestrial Development Envelope by 2,334 ha. 

  • Increase in project throughput, which includes: 

  • Increase in seawater intake to 180 GL/a. 

  • Increase in brine discharge to 5.5 GL/a. 

  • Increase in export volumes to 5.35 Mtpa of salt and 140 ktpa of SoP. 

  • Inclusion of another secondary seawater intake option within Mardie Creek. 

  • Minor alteration of the dredge footprint and methodology within the Dredge Channel Development Envelope (10-ha increase in dredge disturbance footprint but no change to dredge volume). 

  • Increase the Dredge Channel Development Envelope by 3.5 ha. 

  • A quarry adjacent to Mardie Road. 

Assessment Number
2336
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
Referral documentation
2. Decision on whether to assess this proposal
3. Assessment
Environmental Review
Environmental Review documentation
Date Published (Environmental Review documentation)
Date published (Proponent response to submissions)
4. EPA Report on assessment
EPA Report Number
1740
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email