Northern Terminal to Neerabup Terminal 330kV Transmission Line

Project
Proposal description

The Northern Terminal to Neerabup Terminal 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between Northern Terminal in Malaga and Neerabup Terminal in Pinjar, a length of

approximately 29 km. Additionally, the Proposal includes the expansion of the two existing Western Power substations, Northern Terminal and Neerabup Terminal.

The purpose of the Proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation, provide additional capacity to connect large-scale renewable energy generation and meet future demand. The proposed transmission line will be in parallel to the existing 330kV transmission line between Northern Terminal and Neerabup Terminal.

Assessment Number
2410
Region
Referred under EP Act
s38
Industry sector
Last updated
1. Referral
2. Decision on whether to assess this proposal
3. Assessment
Request for further information
Environmental Review
Environmental Review documentation
Date Published (Environmental Review documentation)
Proponent response to submissions
Date published (Proponent response to submissions)
Change to proposal during assessment under s. 43A
Date of approval s. 43A
4. EPA Report on assessment
EPA Report Number
1804
Date published
Appeals close