Mandurah Quay, Peel Inlet, Mandurah

Project
Proponent
Proposal description

The proposal consists of a boat haven with mooring facilities for up to 175 boats, a public boat landing, a launching ramp, refuelling and sullage pump-out facilities, a village centre, and tourist and residential accommodation. lt is located on 35 ha of privately owned land situated adjacent to the Sticks Channel, Peel Inlet, in the town of Mandurah. The land is zoned Tourist under the Mandurah Town Planning Scheme 1A, Amendment No 45.

Following publication of the EPA's report and recommendations, the proposal was withdrawn. A new proposal was subsequently referred for assessment (Assessment No. 617).

Assessment Number
366
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Proposal withdrawn
2. Decision on whether to assess this proposal
Chair's Determination
Date published
4. EPA Report on assessment
EPA Report Number
488
Date published
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email