Leslie Salt project, expansion of ponds, Port Hedland

Project
Proponent
Proposal description

The proposal is to expand an existing salt mining operation by constructing a new primary concentration pond (which would lie outside the existing mining leases) and additional brine, bitterns and crystallization ponds within the existing leases.

The current operation is located on coastal flats near Port Hedland with the primary concentration ponds 30 km to the east and the brine ponds 10 km to the east connected by an aqueduct. Once the brine is fully saturated it is pumped to crystallisation ponds at the main plant, which is on the outskirts of Port Hedland, for harvesting and trucking to the port for shipment.

The current mining operation is regulated by the Leslie Solar Salt Industry Agreement Act which was declared in July 1966, and, under that Act, is regulated by the Mining Act. The present lease expires in 1997, after which two renewals of 21 and 11 years can be negotiated.

Assessment Number
376
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
Scoping
Approved
Environmental Review
4. EPA Report on assessment
EPA Report Number
506
Date published
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 147 - Increase in salt production to 3.2 million tonnes per annum. Section 45C change to proposal approved on 27 October 2004.

Attachment 2 to Statement 147 - Increase in salt production from 3.2 million tonnes per annum to approximately 4.5 million tonnes per annum for approximately 2 years from the start of mining. Section 45C change to proposal approved on 13 July 2005.

Attachment 3 to Statement 147 - Changes to Table 1, Schedule 1 - Key Characteristics Table. Section 45C change to proposal approved on 10 December 2013.

Attachment 4 to Statement 147 - Change to Bitterns Discharge Volume. Section 45C change to proposal approved on 23 April 2018.

Attachment 5 to Statement 147 - Removal of the 3.2 million tonnes per annum solar salt production limit from Attachment 4 of MS 147. Amendment to correct typographic error.. Section 45C change to proposal approved on 22 December 2022.

Date of approval s. 45C