Project Proponent Mineral Deposits Limited Proposal description The proposal is to mine about 50ha of farmland per year, by dredging, to produce 500,000 tonnes of heavy minerals annually, for at least 20 years. The dredge would float on the natural watertable surface and reach to the bottom of the deposit without the need to raise or lower the water table. Minerals would be separated from the ore in a wet concentrator floating behind the dredge and by dry concentration at a dry mill at the north of the site. Sand and fine tailings would be returned to the dredge pond and subsequently rehabilitated to reestablish both pasture and belts of native vegetation. Assessment Number 312 Region South West Referred under EP Act s38 Industry sector Mineral sands Last updated May 24, 1991 Current Status Ministerial Statement published 2. Decision on whether to assess this proposal Chair's Determination Environmental Review and Management Programme (ERMP) Date published Thursday, September 28, 1989 - 12:00 4. EPA Report on assessment EPA Report Number 483 EPA Report Heavy minerals mine - Beenup (PDF, 5.54 MB) Date published Friday, December 7, 1990 - 12:00 5. Decision on proposal and implementation of proposal Ministerial Statement Date of approval Friday, May 24, 1991 - 12:00 Ministerial Statement Ministerial Statement 140 (PDF, 569.27 KB)