Eliwana Railway Project

Project
Proposal description

Fortescue Metals Group Limited proposes to build a 120 km railway linking their existing Solomon Mine with their proposed Eliwana Iron Ore Mine, located 90 km west-northwest of Tom Price (Shire of Ashburton).

The eastern section of the proposed Eliwana Railway Project development envelope is adjacent to Karijini National Park.

Proposed Infrastructure within the Rail Development Envelope includes: Railway and associated embankment; Rail loop; Crossing/passing loops; Railway overpass; Train loadout; Rail maintenance track; Banker siding; Signalling infrastructure; Access roads; Bridges & Culverts; Borrow areas & Ballast quarry; Gas and water pipelines; Power transmission lines; Construction and potable water supply borefield, infrastructure and water storage facilities; Communication infrastructure (including towers and fibre optic cables); Fuel storage; Wastewater treatment plants; and Construction camps.

The proposal includes disturbance to 3,690 ha of native vegetation and fauna habitat within the 57,000 ha development envelope. Water abstraction of 2 gigalitres per year during construction (approximately 1-2 years) and 100,000 kilolitres during operational phase, from local water supply borefields

Assessment Number
2129
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
Chair's Determination
Extract of determination
Date published
3. Assessment
Scoping
Approved
Environmental Review
Date published (Proponent response to submissions)
Minor or preliminary work under s. 41A(3)
Change to proposal during assessment under s. 43A
4. EPA Report on assessment
EPA Report Number
1633
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email