Earl Grey Lithium Project (Revised Proposal)

Project
Proposal description

Covalent Lithium Pty Ltd propose to make changes to their existing approved lithium mine. 

Changes include the construction and operation of a solar plant to provide renewable energy, changes to the tailings disposal method from a dry to a wet tailings, co-disposal of inert refinery waste generated from the Kwinana Lithium Refinery and modification of existing flora and vegetation and fauna exclusion areas. 

The revised proposal would include the additional disturbance of 56 hectares (ha). 

Assessment Number
2315
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
Referral documentation
2. Decision on whether to assess this proposal
Date published
3. Assessment
4. EPA Report on assessment
EPA Report Number
1730
Key Environmental Factors
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email