The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie.

The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same alignment as the existing Collie A Power Station wastewater pipeline with a route deviation through the coastal foredune system, and an ocean outfall consisting of an approximately 650 metre long pipe including a 110 metre long diffuser located north of the Leschenault Inlet at Buffalo Road.

Assessment Number
1733
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
3. Assessment
4. EPA Report on assessment
EPA Report Number
1349
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments

Ministerial Statement 837 published on 17 Sep 2010 - under appeal on Conditions. Subsequently, Ministerial Statement 851 was published on 20 Jan 2011 to amend 837.

Date of approval