Baldivis Tailings Pond Rehabilitation Project and Effluent Management System Upgrade (s46)

Project
Proposal description

Inquiry under s46 regarding changing the implementation conditions of Ministerial Statement 144.

It is proposed that the refinery effluent, tailings pond liquor and recovered groundwater will be blended in the lined staging pond at Baldivis prior to feeding to the CMF plant. The filtrate from the CMF plant will be returned to the refinery site and treated in the existing reverse osmosis circuit. In addition to the CMF plant, WMC is reviewing current remedial plans, as well as short and long term options, which may be implemented to ensure that adverse effects which may result from the delay to the remedial programmed, arc minimized. WMC believes the review of the project is most appropriate in order to meet its commitments regarding:

  • protection of Lake Cooloongup and fringing vegetation;
  • tackling the source of the groundwater contamination (ie the tailings pond); and
  • recovering the groundwater contaminants.
Assessment Number
903
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Date published
4. EPA Report on assessment
EPA Report Number
767
Date published
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval