Utah Point Berth Project (Stage B)

Project
Proposal description

The Utah Point Berth Project consists of two separate stages:

  1. Stage A: Dredging and Reclamation; and
  2. Stage B: Construction and Operation.

Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed.

The EPA determined that Stage B, the construction and ongoing operation of stockyard and ship-loading facilities required formal environmental impact assessment. This assessment report relates only to Stage B.

Assessment Number
1662
Region
Referred under EP Act
s38
Industry sector
Last updated
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
4. EPA Report on assessment
EPA Report Number
1311
Key Environmental Factors
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Withdrawal of Ministerial Statement
Notice of withdrawal of Ministerial Statement
Date withdrawn
Ministerial Statement
Comments

Attachment 1 - Removal of the references to Dust and Noise Suppression, and Stormwater Management from the Key Characteristics Table - change approved under s45C on 14 December 2015.

Date of approval
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 788 - Removal of the references to Dust and Noise Suppression, and Stormwater Management from the Key Characteristics Table - change approved under s45C on 14 December 2015.

Date of approval s. 45C