West Angelas Iron Ore Project Deposits C, D and G

Project
Proposal description

Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman.  

Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha.

Mine dewatering will be required to accommodate below water table mining, requiring an additional  abstraction of up to 8 GL/a of groundwater. Dewatering has the potential to impact the surrounding environmental values, particularly those in Karijini National Park (approximately 4 km west of the proposed deposits).

Assessment Number
2132
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
3. Assessment
Scoping
Approved
Environmental Review
Proponent response to submissions
Date published (Proponent response to submissions)
Change to proposal during assessment under s. 43A
Date of approval s. 43A
4. EPA Report on assessment
EPA Report Number
1636
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Ministerial Statement
Post-assessment changes
S46C changes to conditions

Attachment 1 to Statement 1113 - 1. Change to Condition 5-3(6) Condition 5-3 (6) is deleted, and replaced with: 5-3 (6) provide the format and timing for the reporting of monitoring results against trigger criteria and threshold criteria to demonstrate that condition 5-1 has been met over the reporting period in the Compliance Assessment Report required by condition 3-6.

2. Change to Condition 8-3(3) Condition 8-3 (3) is deleted, and replaced with: 8-3(3) $1,642 AUD (excluding GST) per hectare of riparian vegetation communities within Turee Creek East cleared within the development envelope (delineated in Figure 3 and defined by the geographic coordinates in Schedule 2) within the Hamersley IBRA subregion.

Changes approved under s46c on 16 April 2020.

Attachment 2 to Statement 1113 - Change to Condition 8-4 approved under s46c on 4 January 2021.

Date S46C
s. 45C amendments

Attachment 3 to Statement 1113 - Change to amend the Mine Development Envelope, approved under S45c on 16 April 2021.

Date of approval s. 45C