| Media Statements |
 |
|
| September |
EPA Report 1339 - Port Rockingham Marina
Summary: The Environmental Protection Authority has released advice and recommendations to the Minister for Environment on the proposal by Rosewood Grove Pty Ltd to construct and operate a new marina located at Rockingham, within Cockburn Sound. Release Date: 29 September 2009 Click here to view the report. (file type: HTML) |
| August |
Environmental Protection Bulletin 7: Risk-based Approach to Environmental Impact Assessment - update
Summary: The Environmental Protection Authority is continuing with its reforms of the Environmental Impact Assessment Process in Western Australia having approved the risk-based environmental scoping document for Chevron's Wheatstone project. Scoping documents identify the key environmental factors associated with the project and the investigations to be carried out by the proponent. Release Date: 17 August 2009 Click here to view the report. (file type: HTML) |
| June |
EPA Report 1330 - Fremantle Port Inner Harbour and Channel Deepening, Reclamation at Rous Head and Offshore Placement of Dredged Material
Summary: The Environmental Protection Authority has released advice and recommendations to the Minister for Environment on Fremantle Ports' proposal to deepen the Fremantle Inner Harbour, Entrance Channel and the Deep Water Channel, with further reclamation at Rous Head. Release Date: 16 June 2009 Click here to view the report. (file type: HTML) |
EPA Report 1328 - Koolanooka-Blue Hills Direct Shipping Ore Mining Project in the Midwest
Summary: The Environmental Protection Authority has released advice and recommendations to the Minister for Environment on a proposal by Sinosteel Midwest Corporation Limited to mine hematite ore at Koolanooka Hills and at two locations at Mungada (part of the Blue Hills Range), to reinstate the Mungada Haul Road to its original width and construct an accommodation camp at Old Karara Homestead. Release Date: 2 June 2009 Click here to view the report. (file type: HTML) |
| May |
EPA Report 1326 City of Geraldton-Greenough Town Planning Scheme No. 1A Amendment 4 - Brand Highway, Cape Burney
Summary: The Environmental Protection Authority has released advice and recommendations to the Minister for Environment on the City of Geraldton - Greenough's proposed Amendment 4 to Town Planning Scheme Number 1A.
Release Date: 25 May 2009 Click here to view the report. (file type: HTML) |
EPA Report 1327 Perth Metropolitan Desalination Proposal - Water Quality Management, Change to Implementation Conditions
Summary: The Environmental Protection Authority has released advice and recommendations to the Minister for Environment on a review of the Water Quality Management Implementation Conditions for the Water Corporation's Perth Metropolitan Desalination Proposal. Release Date: 25 May 2009 Click here to view the report. (file type: HTML) |
EPA Report 1324 - Gnangara Mound Environmental Conditions
Summary: The Environmental Protection Authority has released advice and recommendations to the Minister for Environment on the Department of Water's proposal to remove some monitoring sites from the current environmental approval for the use of the Gnangara Mound Groundwater Resource and to rationalise other conditions and commitments of the approval. Release Date: 4 May 2009 Click here to view the report. (file type: HTML) |
| April |
EPA Report 1323 - Gorgon revised proposal
Summary: The Environmental Protection Authority has released advice and recommendations to the Minister for Environment on the proposal to revise and expand the Gorgon liquefied natural gas development, on the Barrow Island nature reserve, by Chevron Australia and its joint venture partners Shell Development Australia and Mobil Resources Company. Release Date: 30 April 2009 Click here to view the report. (file type: HTML) |
EPA Reports 1321 & 1322 - Karara & Mungada Mines in the Midwest
Summary: The Environmental Protection Authority has released advice and recommendations to the Minister for Environment on proposals by Karara Mining Ltd (KML) to mine iron ore in the Blue Hills Range. KML have two mining proposals, the Karara Iron Ore Project (KIOP) and the Mungada Iron Ore Project (MIOP).
Release Date: 28 April 2009 Click here to view the report. (file type: HTML) |
EPA Report 1318 - Smiths Beach Development Guide Plan
Summary: The Environmental Protection Authority has released advice and recommendations to the Minister for Environment on a strategic proposal by Canal Rocks Pty Ltd, setting out the future development of Sussex Location 413, Yallingup commonly known as Smiths Beach. Release Date: 20 April 2009 Click here to view the report. (file type: HTML) |
| January |
EPA Report 1311 - EPA advice on Utah Point Berth Project (Stage B). EPA Bulletin 2 - Dust and Noise in Port Hedland
Summary: The Environmental Protection Authority (EPA) has released its advice to the Minister for Environment on a proposal by the Port Hedland Port Authority to construct and operate a new shipping berth and ore stockpile facility located at Utah Point on Finucane Island at Port Hedland. Also released and arising from the EPA's assessment of the Utah Point proposal is EPA Bulletin 2 on Dust and Noise in Port Hedland. Release Date: 12 January 2009 Click here to view the report. (file type: HTML) |
| December |
EPA Report 1306 - EPA advice on the proposed Kimberley LNG Precinct
Summary: The Environmental Protection Authority has released early environmental advice on the Western Australian Government's site evaluation process for a multi-user liquefied natural gas processing precinct to process gas resources from the Browse Basin on the Kimberley coast.
Release Date: 19 December 2008 Click here to view the report. (file type: HTML) |
| October |
EPA Report 1302 - EPA recommends acceptability of Southern Seawater Desalination Project
Summary: The Environmental Protection Authority has recommended environmental approval for a proposal by the Water Corporation of Western Australia to construct and operate a reverse osmosis seawater desalination plant at Binningup, and released its recommendations, to Environment Minister Donna Faragher. Release Date: 6 October 2008 Click here to view the report. (file type: HTML) |
| September |
EPA Report 1301 - EPA recommends acceptability of Albany Protected Harbour Development, Princess Royal Harbour, Albany
Summary: The Environmental Protection Authority has set an Environmental Protection Statement (EPS) level of assessment and released its recommendations to the Environment Minister on a proposal by LandCorp to develop the Albany Protected Harbour through the expansion of the existing Albany Town Jetty with a breakwater that will shelter a 6.6 hectare area of water. Release Date: 8 September 2008 Click here to view the report. (file type: HTML) |
| March |
EPA Bulletin 1282 - Preston Industrial Park Bunbury
Summary: The Environmental Protection Authority has released its strategic (section 16) advice to the Minister for the Environment, David Templeman on the project by the Western Australian Planning Commission to develop a structure plan for the Preston Industrial Park within the Shire of Dardanup and the City of Bunbury. Release Date: 25 March 2008 Click here to view the report. (file type: HTML) |
EPA Bulletin 1281 - Keralup (formerly Amarillo) Masterplan, Karnup
Summary: The Environmental Protection Authority has released its strategic (section 16) advice to the Minister for the Environment, David Templeman on the project by the Department of Housing and Works to develop a new town site at Amarillo, a farming property in Karnup. Amarillo has subsequently been renamed Keralup. Release Date: 4 March 2008 Click here to view the report. (file type: HTML) |
| January |
Manjimup Biomass Power Generation Plant Proposal
Summary: Environmental Protection Authority Chairman Paul Vogel has expressed concern about reported misconceptions and factual errors to do with the environmental impact assessment (EIA) process for the biomass power generation proposal at Diamond Mill, near Manjimup. Release Date: 31 January 2008 Click here to view the report. (file type: HTML) |
| December |
EPA Bulletin 1277 - EPA recommends acceptability of Freshwater Point 1 Drilling Proposal within Beekeepers Nature Reserve
Summary: The Environmental Protection Authority has set an Environmental Protection Statement (EPS) level of assessment and released its recommendations to Environment Minister David Templeman on a proposal by Origin Energy Resources Limited to conduct drilling of the Freshwater Point 1 petroleum exploration well within Beekeepers Nature Reserve, 40km south of Dongara. Release Date: 10 December 2007 Click here to view the report. (file type: HTML) |
EPA Bulletin 1275 - Shire of Harvey District Planning Scheme No. 1 Amendment No. 13
Summary: In advice to the Minister for the Environment the Environmental Protection Authority has concluded that the Shire of Harvey's proposal to amend District Planning Scheme No. 1 can be implemented to meet the EPA's objectives provided the conditions recommended in EPA Bulletin 1275 are imposed, complied with and enforced. Release Date: 10 December 2007 Click here to view the report. (file type: HTML) |
EPA Bulletin 1276 - Magellan Lead Carbonate Project, Wiluna - To Facilitate the Export of Containerised Lead from the Port of Fremantle
Summary: In advice to the Minister for the Environment, on a proposal by Magellan Metals Pty Ltd to export containerised lead concentrate through the Port of Fremantle, the Environmental Protection Authority has concluded that it is unlikely that the EPA's objectives would be compromised, provided there is satisfactory implementation by the proponent of the recommended conditions and commitments. Release Date: 10 December 2007 Click here to view the report. (file type: HTML) |
EPA Bulletin 1278 - Jansz Feed Gas Pipeline - Barrow Island Nature Reserve
Summary: The Environmental Protection Authority has set an Assessment on Referral Information (ARI) level of assessment and released its recommendations to Environment Minister David Templeman on a proposal by Mobil Australia Resources Company Pty Ltd to construct a feed gas pipeline to carry natural gas from the Io/Jansz offshore gas field, through State waters and across Barrow Island nature reserve to the Gorgon gas processing plant. Release Date: 10 December 2007 Click here to view the report. (file type: HTML) |
EPA Bulletins 1273 & 1274 - EPA reiterates its recommendation of acceptability for the Fimiston Gold Mine Operations Extension (Stage 3).
Summary: The Minister for the Environment directed the EPA to re-assess the EPA's advice and recommendations on KCGM's Fimiston Gold Mine Operations Extension proposal contained in Bulletins 1270 and 1271, as the Minister was concerned that there may have been a perception of bias and/or a conflict of interest because the former Chairman, Barry Carbon, had received payment from KCGM for some consultancy work carried out nine years previously. Release Date: 3 December 2007 Click here to view the report. (file type: HTML) |
| October |
EPA Bulletin 1268 - EPA recommends acceptability of a 330MW Gas-Fired Power Station at Neerabup
Summary: The Environmental Protection Authority has recommended environmental approval for NewGen Neerabup Pty Ltd gas fired power plant. Release Date: 29 October 2007 Click here to view the report. (file type: HTML) |
EPA Bulletin 1270 - EPA recommends acceptability of Fimiston Gold Mine Operations Extension (Stage 3)
Summary: The Environmental Protection Authority has recommended environmental approval for Kalgoorlie Consolidated Gold Mines Pty Ltd's Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning and released its recommendations to Environment Minister David Templeman. Release Date: 29 October 2007 Click here to view the report. (file type: HTML) |
EPA Bulletin 1269 - EPA recommends conditions for Keysbrook mineral sands
Summary: The EPA has recommended strict noise, dust and vegetation controls on a mineral sands mining proposal north of Keysbrook. Release Date: 29 October 2007 Click here to view the report. (file type: HTML) |
EPA Bulletin 1272 - EPA recommends that Underwood Avenue housing is acceptable
Summary: The Environmental Protection Authority has recommended the University of Western Australia proposal for housing development in Underwood Avenue Shenton Park be found environmentally acceptable. This is the third time that this proposal in various forms has been assessed by the EPA, and a report submitted to the Minister for the Environment. Release Date: 29 October 2007 Click here to view the report. (file type: HTML) |
EPA Bulletin 1267 - Tilley Siding Morawa
Summary: In their recommendations to Environment Minister David Templeman the Environmental Protection Authority has given Midwest Corporation Limited's proposal, to build Tilley Siding on the rail line two kilometres north of Morawa to load iron ore for export through Geraldton Port, an environmental tick. An Assessment on Referral Information (ARI) level of assessment has also been set. Release Date: 22 October 2007 Click here to view the report. (file type: HTML) |
| September |
The EPA Process at Work - Mesa A Iron Ore Mining. Bulletin 1264
Summary: The Environmental Protection Authority has given an environmental tick to the Mesa A iron ore mining proposal. Release Date: 17 September 2007 Click here to view the report. (file type: HTML) |
EPA Bulletins 1262 & 1263 - EPA recommends against land clearing proposals
Summary: The Environmental Protection Authority has recommended against the clearing of two lots of native vegetation in the south west. The applicant in each case was Mr Brian Burns who proposed to clear the land for agriculture. One of the applications for clearing was for 1000 hectares in Jerramungup, and one for 779 hectares in Lake Grace. Release Date: 10 September 2007 Click here to view the report. (file type: HTML) |
| August |
Environmental Protection Authority to assess lead export through Fremantle
Summary: Magellan Metal, the company that mines lead carbonate from near Wiluna, has applied to export through Fremantle Port. This would replace the previous export through Esperance Port. Release Date: 13 August 2007 Click here to view the report. (file type: HTML) |
| July |
EPA reveals Western Australia's environment report card
Summary: Today the Environmental Protection Authority, the States independent environmental authority, released the State of the Environment (SoE) Report: Western Australia 2007. Release Date: 2 July 2007 Click here to view the report. (file type: HTML) |
| April |
EPA Bulletin 1252 - Environmental Management of Groundwater Abstraction from the Gnangara Mound July 2004 - June 2005 - Annual Compliance Report
Summary: The Environmental Protection Authority has released an audit report to the Minister for the Environment on compliance by the Water and Rivers Commission (WRC) with the environmental conditions applying to groundwater abstraction from the Gnangara Mound. Release Date: 2 April 2007 Click here to view the report. (file type: HTML) |
| March |
EPA Bulletin 1251 - Mesa A / Warramboo Iron Ore Project
Summary: In advice and recommendations to the Minister for the Environment the Environmental Protection Authority has recommended against a proposal by the Robe River Mining Company Pty Ltd to develop an iron ore mine 43 kilometres west of Pannawonica adjacent to the North West Coastal Highway in the Shire of Ashburton. Release Date: 28 March 2007 Click here to view the report. (file type: HTML) |
| February |
EPA Bulletin 1248 - Kwinana Ethanol Bio-Refinery
Summary: The Environmental Protection Authority has set an Environmental Protection Statement level of assessment and released its recommendations to the Minister for the Environment on a proposal by Primary Energy Pty Limited to construct and operate an ethanol refinery in the East Rockingham Industrial Park to produce ethanol, aqueous ammonia, fertiliser and up to 23 MW of electricity per year. Release Date: 12 February 2007 Click here to view the report. (file type: HTML) |
EPA Statement of Reasons for Level of Assessment - Proposal Unlikely to be Environmentally Acceptable. Hay Park Athletics and Cycle Track, Bunbury.
Summary: The Environmental Protection Authority (EPA) has released a Statement of Reasons for setting a Proposal Unlikely to be Environmentally Acceptable (PUEA) Level of Assessment on The City of Bunbury's proposal to develop a sports facility adjacent to the existing South West Sports Centre within Hay Park in Bunbury. Release Date: 5 February 2007 Click here to view the report. (file type: HTML) |
| January |
EPA Bulletin 1247 - Dust Management Program for Finucane Island and Nelson Point Operations, Change to Environmental Conditions
Summary: The Environmental Protection Authority (EPA) has provided advice and recommendations to the Minister for the Environment on BHP Billiton's requested change to its existing environmental conditions for dust management at its iron ore operations at Finucane Island and Nelson Point, Port Hedland. The purpose of the proposed change is to further reduce dust emissions. Release Date: 29 January 2007 Click here to view the report. (file type: HTML) |
EPA Bulletin 1246 - Cape Lambert Port upgrade - increase in throughput to 85 Mtpa
Summary: The Environmental Protection Authority has set an Environmental Protection Statement level of assessment and released its recommendations to the Minister for the Environment a proposal by Robe River Iron Associates (Robe) to increase the throughput of ore from 55 million tonnes per annum (Mtpa) to 85 Mtpa at its Cape Lambert Port operations. Release Date: 8 January 2007 Click here to view the report. (file type: HTML) |
| November |
EPA Bulletins 1238 - Alkimos Wastewater Treatment Plant - Wastewater Disposal Strategy and Proposed Ocean Outlet (Site A), Alkimos and 1239 - Alkimos Wastewater Treatment Plant - Wastewater Disposal Strategy and Proposed Ocean Outlet (Site B), Alkimos
Summary: The Environmental Protection Authority has provided advice and recommendations to the Minister for the Environment on a proposal by the Water Corporation to construct, operate and maintain a new Wastewater Treatment Plant (WWTP) and ocean outfall at Alkimos. There are two proposed sites for the WWTP, Site A and Site B situated on the coast between Yanchep and Quinns, approximately 40km north of Perth, Western Australia. Release Date: 13 November 2006 Click here to view the report. (file type: HTML) |
EPA Bulletin 1233 - Cloverdale Mineral Sands
Summary: The Environmental Protection Authority has made its recommendations to the Minister for the Environment and set an Assessment on Referral Information level of assessment on a proposal by Iluka Resources Limited to develop a mineral sands mine at the Cloverdale Deposit, approximately 190km south of Perth in the Shires of Busselton and Capel. Release Date: 13 November 2006 Click here to view the report. (file type: HTML) |
| September |
EPA Bulletin 1230 section 16 advice - Fremantle Ports Outer Harbour Project
Summary: The Environmental Protection Authority has released its section 16 advice to the Minister for the Environment on the proposal by Fremantle Ports and the Department for Planning and Infrastructure to develop a new port facility and related transport infrastructure for container trade and general cargo in Cockburn Sound. Release Date: 25 September 2006 Click here to view the report. (file type: HTML) |
EPA Bulletin 1228 - Development of Industrial Land on the Burrup Peninsula for Future Gas Development
Summary: The Environmental Protection Authority has provided advice and recommendations to the Minister for the Environment; Racing and Gaming on Woodside Energy Ltd's proposal to develop Industrial Land on the Burrup Peninsula. Release Date: 4 September 2006 Click here to view the report. (file type: HTML) |
| August |
EPA Report: Bulletin 1225 Dredging Program Dampier Port Upgrade
Summary: The Environmental Protection Authority has made its recommendations to the Minister for the Environment and set an Assessment on Referral Information level of assessment on a proposal by Hamersley Iron Pty Ltd to undertake dredging within the Port of Dampier in the vicinity of the Company's Parker Point and East Intercourse Island iron ore export loading facilities. Release Date: 7 August 2006 Click here to view the report. (file type: HTML) |
| July |
EPA Bulletin 1224 - Riverslea Subdivision
Summary: The Environmental Protection Authority has provided advice and recommendations to the Minister for the Environment; Racing and Gaming on Greendene Development Corporation Pty Ltd's proposal to subdivide an area of land within the developing Riverslea residential area, one kilometre east of the Margaret River townsite. Release Date: 10 July 2006 Click here to view the report. (file type: HTML) |
| June |
State of the Environment Report: how is the Goldfields tracking?
Summary: A report card on the State of the Environment has identified a range of key environmental issues for the Goldfields. Release Date: 9 June 2006 Click here to view the report. (file type: HTML) |
State of the Environment Report: how is the South West tracking?
Summary: A report card on the Environment has identified a range of key environmental issues for the South West. Release Date: 9 June 2006 Click here to view the report. (file type: HTML) |
State of the Environment Report: how is the Mid West tracking?
Summary: A report card on the State of the Environment has identified a range of key environmental issues for the Mid West. Release Date: 9 June 2006 Click here to view the report. (file type: HTML) |
EPA Bulletin 1221 - Gorgon Proposal on Barrow Island Nature Reserve
Summary: The Environmental Protection Authority has provided advice and recommendations to the Minister for the Environment; Racing and Gaming on Chevron Australia Pty Ltd's proposal, as operator for the Gorgon Joint Venturers, to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas using facilities offshore and on Barrow Island, Western Australia. Release Date: 6 June 2006 Click here to view the report. (file type: HTML) |
State of Environment Report highlights need to address climate change
Summary: Climate change continues to be one of the most significant environmental challenges facing Western Australia, according to the latest report into the State's Environment. Release Date: 1 June 2006 Click here to view the report. (file type: HTML) |
Report identifies population and consumption as an environmental priority
Summary: The ecological footprint of the average West Australian is about seven times higher than what is available for each person on earth, according to the latest report on the State of the Environment. Release Date: 1 June 2006 Click here to view the report. (file type: HTML) |
State of the Environment Report open for public comment
Summary: The Environmental Protection Authority has released the draft Western Australian State of Environment Report for public comment. Release Date: 1 June 2006 Click here to view the report. (file type: HTML) |
|