State Government web site
Contacts Help Submissions Contacts Help
State of the Environment (SoE) Home
Profile
News
Policies
Environmental Impact Assessment (EIA)
EPA Advice to Government on Review (s16)
EIA Review of Processes
State of the Environment (SOE)
Natural Resource Management (NRM)
Peel-Harvey Water Quality Improvement Plan

 
 
Approved changes to proposals after assessment - s45C

Statement 699 - Clay Excavation Lots 7, 19, 60, 63, 64 & 20 Hallett & Copley Roads (formerly Port Lot 1 & Lots 222, 27, 26, 25, 28 & 7 Hallett & Copley Roads), & Lots 19, 45 & 46 St Alban's Road, & Lot 100 Great Northern Highway Upper Swan - Att. 1
Summary: Inclusion of an additional lot (Lot 18 St Alban's Road, Upper Swan) into the Upper Swan clay extraction area - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 2 November 2009
Download this document (file type: Acrobat PDF file size: 3.1 Mb)
Statement 685 - Bluewaters Power Station, Shire of Collie - Attachment 6
Summary: Increase the power generating capacity from 208 megawatts to 217 megawatts – change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 23 October 2009
Download this document (file type: Acrobat PDF file size: 21.2 Kb)
Statement 712 - Orebody 25 Extension Project, 8 kms northeast of Newman, Shire of East Pilbara - Attachment 2
Summary: Change OB25 mine operation life until 2018 to mine additional ore from Pit 3 and portion of Pit 1 (i.e. Pit 1 East) - change to proposal approved under s45C on 2 October 2009.
Click here for the complete statement.
Status: Final
Release Date: 2 October 2009
Download this document (file type: Acrobat PDF file size: 1.2 Mb)
Statement 721 - Pilbara Iron Ore and infrastructure project: Cloud Break (No Beneficiation) - Attachment 1
Summary: Increase of dewatering to up to 25 GL/a, and reinjection to up to 18 GL/a (as shown in figure 4) - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 25 September 2009
Download this document (file type: Acrobat PDF file size: 790.1 Kb)
Statement 469 - Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley - Attachment 2
Summary: Confirmed port location as the northern option, with an offshore design capable of berthing two Cape Class (180,000 DWT) vessels - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 2 September 2009
Download this document (file type: Acrobat PDF file size: 389 Kb)
Statement 775 - Pardoo iron ore mine and direct shipping from Port Hedland, Shire of East Pilbara and Town of Port Hedland - Attachment 1
Summary: Multiple project design and operational changes to the mine site - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 25 August 2009
Download this document (file type: Acrobat PDF file size: 513.1 Kb)
Statement 131 - Brockman No 2 Detrital Iron-Ore Mine - Attachment 5
Summary: Phase IIa Development: to further develop parts of the existing Pit 4, Pit 4 Extension, Valley Pit and Pit 6 to a depth of relative level 580 metres and increasing the dewatering rate from 700 megalitres per year to 950 megalitres per year so to maintain groundwater level in orebody aquifer at relative level 570 metres - change to proposal approved under s45C..
Click here for the complete statement.
Status: Final
Release Date: 25 August 2009
Download this document (file type: Acrobat PDF file size: 677.7 Kb)
Statement 514 - West Angelas Iron Ore Project Shires of East Pilbara, Ashburton and Roebourne - Attachment 3
Summary: Increase throughput to 40 million tonnes per annum, update of mine figure (Figure 10) and amendments to Key Characteristics Table - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 20 August 2009
Download this document (file type: Acrobat PDF file size: 534.8 Kb)
Statement 757 - Pluto Liquified Natural Gas Development (Site B Option), Burrup Peninsula, Shire of Roebourne - Attachment 2
Summary: To include the construction of an Emergency Escape Route (walkpath) from Site B to Haul Road in the currently approved disturbance footprint of the proposal (as shown on Figure 5) - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 20 August 2009
Download this document (file type: Acrobat PDF file size: 389.8 Kb)
Statement 790 - Cooljarloo Mine - Falcon extension approximately 10 kilometres north-west of Cataby, Shire of Dandaragan - Attachment 1
Summary: Minor changes to the clearing footprint; change typographical error of ore extracted from 3.1 million tonnes to 7.4 million tonnes - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 5 August 2009
Download this document (file type: Acrobat PDF file size: 373.9 Kb)
Statement 523 - Yandicoogina Iron Ore Mine & Railway 90 Kilometres north-west of Newman Hamersley Range - Attachment 1
Summary: Increase of dewatering cap (shared with Statement 695) to 35 GL/a - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 16 July 2009
Download this document (file type: Acrobat PDF file size: 229.7 Kb)
Statement 695 - Yandicoogina Iron Ore Mine & Railway 90 Kilometres north-west of Newman Hamersley Range - Attachment 2
Summary: Increase of dewatering cap (shared with Statement 523) to 35 GL/a - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 16 July 2009
Download this document (file type: Acrobat PDF file size: 203 Kb)
Statement 584 - Hope Downs Iron Ore Mine, 75 km north-west of Newman, Pilbara Region - Attachment 1
Summary: Increase in project clearance disturbance area from 1,600 hectares to 1,850 hectares (as shown on Figure 4), and updating of Key Characteristics Table – change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 14 July 2009
Download this document (file type: Acrobat PDF file size: 2.1 Mb)
Statement 635 - Iron Ore Mine, Downstream Processing (Direct-Reduced & Hot-Briquetted Iron) and Port Construction, Cape Preston, Pilbara - Attachment 4
Summary: Increases in the "footprint" of the mine pit, waste dumps, and tailings storage facility, as defined by attached delineation coordinates; and increases in mining and processing rates - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 3 July 2009
Download this document (file type: Acrobat PDF file size: 2.4 Mb)
Statement 707 - Pilbara iron ore & infrastructure project: east-west railway & mine sites (stage B) Attachment 3
Summary: Transport iron ore by truck from Christmas Creek mine site to Cloud Break mine site along the existing rail access road and the existing Christmas Creek access road in addition to the approved east-west railway to Port Hedland for export - change to proposal approved under s45C. .
Click here for the complete statement.
Status: Final
Release Date: 23 June 2009
Download this document (file type: Acrobat PDF file size: 1.2 Mb)
Statement 753 - Mt Gibson Iron Ore Mine and Infrastructure Project, Shire of Yalgoo - Attachment 3
Summary: Increase the mine pit, waste dump and processing plant area, and change the location of the accommodation village and airstrip - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 2 June 2009
Download this document (file type: Acrobat PDF file size: 323.1 Kb)
Statement 391 - Port Geographe - Stage 1 - Attachment 2
Summary: To harvest wrack for a two-year trial period between Guerin Street groyne and the western breakwater of the Port Geographe development - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 15 May 2009
Download this document (file type: Acrobat PDF file size: 45.1 Kb)
Statement 491 - Multiple Iron Ore Mine Development, Mining Area C- Northern Flank, 100km North-West of Newman - Attachment 3
Summary: Installation of a diesel power generation facility; and increase disturbance area for the extension of existing Packsaddle accommodation village and wastewater treatment facilities - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 24 April 2009
Download this document (file type: Acrobat PDF file size: 55 Kb)
Statement 535 - Upgrade of Marine Services Facility, King Bay, Dampier - Attachment 3
Summary: Expansion of barge berth by 15 metres and minor changes to land-based facilities - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 24 April 2009
Download this document (file type: Acrobat PDF file size: 298.4 Kb)
Statement 718 - Gwindinup Mineral Sands Mine, Shire of Capel - Attachment 1
Summary: Clear an additional 4.3 hectares of native vegetation, increase the mine footprint, increase the amount of ore mined and change the mining period - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 8 April 2009
Download this document (file type: Acrobat PDF file size: 377.2 Kb)
Statement 781 - Dredging at Finucane Island, BHP Billiton RGP5 Project, Port Hedland - Attachment 1
Summary: Alternative access to remove mangroves - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 30 March 2009
Download this document (file type: Acrobat PDF file size: 365 Kb)
Statement 635 - Iron Ore Mine Downstream Processing (Direct-Reduced and Hot-Briquetted Iron) and Port Construction, Cape Preston, Pilbara - Attachment 3
Summary: Relocation of proposed pellet plant from its original location near the project minesite to the project port on Cape Preston - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 18 March 2009
Download this document (file type: Acrobat PDF file size: 250.5 Kb)
Statement 490 - Industrial Infrastructure and Harbour Development, Jervoise Bay - Attachment 1
Summary: Construction of wharf infrastructure and associated dredging - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 16 March 2009
Download this document (file type: Acrobat PDF file size: 45.6 Kb)
Statement 599 - Long-Term Shellsand Dredging, Owen Anchorage - Attachment 1
Summary: Clarification of operational tolerances of approved dredging - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 11 March 2009
Download this document (file type: Acrobat PDF file size: 31.7 Kb)
Statement 494 - Medium-term shellsand dredging, Success Bank, Owen Anchorage - Attachment 3
Summary: Change of approved dredge - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 11 March 2009
Download this document (file type: Acrobat PDF file size: 45.8 Kb)
Statement 715 - Koolan Island Iron Ore Mine and Port Facility, Shire of Derby - West Kimberley - Attachment 2
Summary: Increase to the disturbance area from 540 hectares to 590 hectares - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 4 March 2009
Download this document (file type: Acrobat PDF file size: 449.7 Kb)
Statement 695 - Yandicoogina Junction South-East Mine, Mining Lease 274SA, Shire of East Pilbara - Attachment 1
Summary: Remove the detailed breakdown of the disturbance area - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 4 March 2009
Download this document (file type: Acrobat PDF file size: 35.3 Kb)
Statement 773 - Windimurra Vanadium Project: Land clearing and mining below the base of weathering, Shire of Mount Magnet - Attachment 1
Summary: Revised land clearing requirements - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 24 February 2009
Download this document (file type: Acrobat PDF file size: 379.9 Kb)
Statement 514 - West Angelas Iron Ore Project - Attachment 2
Summary: Change to the rail alignment along Hamersley Flats - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 13 February 2009
Download this document (file type: Acrobat PDF file size: 346.3 Kb)
Statement 635 - Iron Ore Mine Downstream Processing (Direct-Reduced & Hot-Briquetted Iron) and Port Construction Cape Preston Pilbara - Attachment 2
Summary: Changes in project layout and certain increases in infrastructure "footprint", including relocation of the accommodation village and construction camps, desalination plant, services corridor route, gas pipeline route, waste dumps, tailings dam, port stockpiles, and expansion of the services corridor and use of a buried slurry pipeline in place of conveyor - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 13 February 2009
Download this document (file type: Acrobat PDF file size: 582.4 Kb)
Statement 559 - Magellan Lead Carbonate Project, Wiluna - Attachment 1
Summary: Change to transport arrangements - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 27 January 2009
Download this document (file type: Acrobat PDF file size: 30.7 Kb)
Statement 719 - Worsley Alumina - Production to Maximum Capacity of 4.4 Mtpa Alumina and Associated Mining - Attachment 5
Summary: Install an additional secondary crushing plant adjacent to the existing crushing facilities at Saddleback - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 23 January 2009
Download this document (file type: Acrobat PDF file size: 31.6 Kb)