Scarborough Project Nearshore Component

Project
Proposal description: 

The Proposal would include the following activities:

• shore crossing site preparation including installation of temporary facilities along the

shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower

depths

• preparation works associated with the installation of the trunkline including dredging and

associated spoil disposal at existing spoil grounds

• trunkline installation (about 32.7 kilometres long within State waters)

• shore crossing site reinstatement

• rock supply and dumping/sand supply and backfilling of the trench with sand and/or rock to

protect the trunkline

• pre-commissioning testing

• commissioning and operation

• decommissioning.

Assessment Number: 
2194
Region: 
Referred under EP Act: 
s38
Industry sector: 
Last updated: 
August 12, 2019
Current Status: 
Environmental Review document open for public submissions