This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 27, 1989
Increased trade and associated shipping within the Port of Geraldton has created a demand for addional land adjacent to the harbour area. In response to this demand, the Port of Geraldton proposes to reclaim a 5 ha area in the existing fishing boat harbour, within the Inner Harbour. Associated with this reclamation activity would be the breaching of the outer breakwater and dredging of a channel to create a new entrance to the fishing boat harbour. The Port Authority also proposes to extend the... Read more...Last updated: December 27, 1989
AMC Mineral Sands Ltd, the mineral sands division of Renison Goldfields Consolidated Limited, proposes to expand its synthetic rutile plant on the Narngulu Industrial Estate located 11 km south-east of Geraldton. After expansion, the synthetic rutile plant will occupy some 47 hectares of the 465 hectare Estate. The expansion will increase synthetic rutile production from 112,500 to 260,000 tonnes per annum. This expansion arises from an increased demand for the synthetic rutile product. Read more...Last updated: October 11, 1989
The proposal is to extend AMC Mineral Sands' existing heavy mineral sand mining operation. The proposed extension is 5 km west of the existing operation at Eneabba, which lies 250 km north of Perth. Expansion of the mining operation will necessitate an expansion of the existing dry processing plant at Narngulu near Geraldton. lt is proposed to mine 200 million tonnes of ore over a 14 year period, resulting in a 40% increase in production at the Eneabba operations. Mining of the deposit... Read more...