This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: April 9, 1996
The proponent, Tiwest Joint Venture (Tiwest), seeks an amendment to the environmental conditions of Ministerial Statement 59 under Section 46 of the, Environmental Protection Act 1986, , to allow the synthetic rutile plant at Chandala an increase in nameplate production from 130,000 to 200,000 tonnes per annum (tpa) of synthetic rutile. The plant was originally assessed by the Environmental Protection Authority (EPA) in December 1988 and was approved by the Minister for the Environment to build... Read more...Last updated: November 1, 1991
Proposal to establish a cereal straw and waste paper pulp and paper mill near Moora in the Central Midlands district of Western Australia. Read more...