This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 14, 2022
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: May 17, 2021
Doral Mineral Sands Pty Ltd is proposing to develop and operate a mineral sands deposit approximately 11 kilometres southeast of Busselton. The proposal includes the development of mine pits and associated infrastructure, wet concentration processing plant, solar evaporation ponds, groundwater abstraction and water management infrastructure and process water pond. The proposal would include a total disturbance of 453.34 hectares within a development envelope of 924.8 hectares. The majority of... Read more...Last updated: October 1, 2019
The proposal is for the works and operation of a wastewater treatment plant (WWTP) and woodlot reuse scheme for the first three years. This will enable monitoring and evaluation to be undertaken to determine a longer term strategy for development and operation of the scheme. The proposed works and operation for the first three years form part of planned Stage 1 of the scheme, which will extend to the year 2010. A further two stages (extending to 2040) are planned for the future. Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...Last updated: December 6, 2016
The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...Last updated: March 4, 2015
The extraction of silica sands from two new areas and the transfer of the ownership of land which contains the Muchea Limestone Communities Threatened Ecological Community to the conservation estate. Inquiry under s46 in regard to amending Ministerial Statements 703 and 920 . Read more...Last updated: October 2, 2014
The proposal involves the construction and operation of a 40 Megawatt power plant fueled by up to 380,000 tonnes (+/-10%) per annum of, Eucalyptus globulus, (Bluegum) and pine plantation wastes, a pipeline for water supply, and a power line connecting the power plant to the sub-station. Inquiry under s46 in response to a request for extension of timeframe for substantial commencement, condition 3 of Ministerial Statement 791. Read more...Last updated: August 28, 2014
The proposal is to rehabilitate the Beenup Titanium Minerals Project Area located 17km north-east of Augusta in the Shire of Augusta-Margaret River. The Beenup Rehabilitation Project is located on retained portions of Mining Leases 70/574 and 70/575. Inquiry under s46 to amend Ministerial Statement 140 . Read more...Last updated: February 7, 2014
The Water Corporation of Western Australia proposes to construct, commission, operate and maintain a new wastewater treatment plant (WWTP) on a portion of the C class Crown reserve No. 29778 (Forestry Purposes) on Chugg Street, north-east of the Walpole townsite. That portion of the reserve is predominantly cleared and used as a depot for the Department of Conservation and Land Management. Read more...Last updated: February 7, 2014
The proposal is to construct, commission, operate and maintain a 1,000 equivalent persons capacity wastewater treatment plant to serve the Walpole town site and its environs. Inquiry under s46 into a request to remove conditions - Ministerial Statement 493 . Read more...Last updated: June 4, 2013
This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by the Shire of Manjimup to construct, operate and maintain a 6.5 kilometre (km) long all-weather, year-round access track from Windy Harbour Road to Nelson Location 7965, located entirely within the Doggerup Road reserve. Read more...Last updated: January 4, 2013
Kemerton Silica Sand Mining Proposal, additional mining areas and transfer of land for conservation - section 46 request for change to implementation conditions of Ministerial Statement 703 . Read more...Last updated: October 4, 2012
Request to change implementation conditions of Ministerial Statement 126 . Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: July 8, 2011
The proposal is to extend the existing Dardanup Mine to allow mining of the Burekup Mineral Sands Deposit located approximately 20 kilometres east of Bunbury, Western Australia. Mining is to depths up to 14 metres below ground level and will require dewatering. Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...Last updated: June 15, 2010
The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...Last updated: January 21, 2008
Proposal by West Australian Landfill Services Pty Ltd (WALS) to modify the footprint of the South Cardup landfill. Read more...Last updated: September 24, 2007
The proposed Peel Deviation project involves the construction of 52.1 km of dual carriageway freeway-standard highway from the future freeway link north of Mandurah to the existing Perth-Bunbury Highway (Old Coast Road) at Lake Clifton. Read more...