This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 14, 2022
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: February 2, 2022
Change to Condition 9 (Rehabilitation) to remove reference to northern portion of Lot 2 Read more...Last updated: October 15, 2018
Alcoa proposes to expand the Wagerup Refinery through construction of a third production unit. The proposed production increase to approximately 4.7 Mtpa alumina is to be achieved by a combination of new equipment and upgrade of existing equipment in order to achieve an increase in both capacity and efficiency. As the Wagerup Refinery has been subject to previous assessments, this represents a revised proposal pursuant to s 45B of the EP Act. The current maximum production permitted under the... Read more...Last updated: December 6, 2016
The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...Last updated: March 4, 2015
The extraction of silica sands from two new areas and the transfer of the ownership of land which contains the Muchea Limestone Communities Threatened Ecological Community to the conservation estate. Inquiry under s46 in regard to amending Ministerial Statements 703 and 920 . Read more...Last updated: August 28, 2014
The proposal is to rehabilitate the Beenup Titanium Minerals Project Area located 17km north-east of Augusta in the Shire of Augusta-Margaret River. The Beenup Rehabilitation Project is located on retained portions of Mining Leases 70/574 and 70/575. Inquiry under s46 to amend Ministerial Statement 140 . Read more...Last updated: June 12, 2014
Southern Extension of Sandpit, Lot 2 Calinup Road, Gelorup, Shire of Capel. Inquiry under s46 - review of condition 9 - Ministerial Statement 767. Read more...Last updated: June 4, 2013
This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by the Shire of Manjimup to construct, operate and maintain a 6.5 kilometre (km) long all-weather, year-round access track from Windy Harbour Road to Nelson Location 7965, located entirely within the Doggerup Road reserve. Read more...Last updated: January 4, 2013
Kemerton Silica Sand Mining Proposal, additional mining areas and transfer of land for conservation - section 46 request for change to implementation conditions of Ministerial Statement 703 . Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: June 15, 2010
The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...Last updated: August 13, 2009
The proposal is to mine the Tutunup South Mineral Sands Project located approximately 15 kilometres southeast of Busselton on Lots 2, 1827 and 1828 and part of Lots 441, 442, 1268, 1813, 1829 and part of Crown Reserve 22455, Hithergreen and part of State Forest 33 Yoganup. Mining is to extend approximately 15 metres below ground level and will require dewatering. Read more...Last updated: September 24, 2007
The proposed Peel Deviation project involves the construction of 52.1 km of dual carriageway freeway-standard highway from the future freeway link north of Mandurah to the existing Perth-Bunbury Highway (Old Coast Road) at Lake Clifton. Read more...Last updated: August 9, 2007
The installation of a wet compression system and associated infrastructure within the existing Kemerton Power Station, and the construction of evaporation ponds and a water pipeline to deliver water from an existing offtake located about 4 kilometres to the east. The wet compression system will enable the power station to generate additional power at ambient temperatures above International Standards Organisation conditions by eliminating the sensitivity of the installed gas turbines to ambient... Read more...Last updated: November 29, 2005
Kemerton silica sand mining revised proposal - additional mining areas and transfer of land for conservation Read more...Last updated: November 29, 2005
The proposal is to construct and operate a pipeline to supply gas to the Kemerton Power Station (located approximately 22km north east of Bunbury nearby the Kemerton Industrial Estate) and to construct a meter station at the power station site. The proposed pipeline would be 5km long and would connect to the DBNGP at MLV 154/155 and then run parallel to the existing DBNGP until it deviates west to supply the Kemerton Power Station. The proposed pipeline would be installed in the existing 16-... Read more...Last updated: December 4, 2003
The Conservation Commission of Western Australia has prepared through the agency of the Department of Conservation and Land Management, a Proposed Forest Management Plan to apply to the Swan, South West and Warren Regions of the Department of Conservation and Land Management during 2004-2013. This is the EPA's assessment of the environmental factors relating to the proposed plan and the Authority's advice and recommendations to the Minister for Environment. Read more...Last updated: March 29, 1999
The proposal is for the expansion of the existing titanium dioxide plant, to increase the plant production capacity from 79,000 tpa of finished titanium dioxide pigment, at the Kemerton Industrial Park, within the shire of Harvey, 140 kilometres south of Perth, 17 kilometres north east of Bunbury and 4 kilometres east of Leschenault Estuary. Read more...Last updated: July 2, 1996
The proposal is to expand alumina production from 2.0 million tonnes per annum to 3.5 million tonnes per annum at the Worsley Alumina Refinery, Collie, and undertake associated bauxite mining activities at Boddington. Read more...