Last updated: February 26, 2020
Change to Condition 3. Extension to Time Limit for Proposal Implementation. Read more...Last updated: January 20, 2020
Changes to conditions 3-1 and 3-2 in order to extend the Time Limit for Proposal Implementation. Read more...Last updated: January 20, 2020
The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions in Ministerial Statement 945 relating to Forge Resources Swan Pty Ltd’s Balla Balla Export Facilities proposal. Read more...Last updated: January 15, 2020
The proposal is to revise the Mining Area C operation (located approximately 90km WNW of Newman) to include a new satellite ore body which is located approximately 8 km to the south of the existing approved Mining Area C operations. The revised proposal would require the additional clearing of approximately 19,850 hectares of vegetation and mining below the water table. Read more...Last updated: January 13, 2020
The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of permanent surface water diversion structures. Read more...Last updated: January 13, 2020
Atlas Iron Pty. Ltd (the proponent) propose to develop the Corunna Downs Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 23.3 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of 6 years. Associated infrastructure will include waste rock dumps, a mine operation centre, borefield and... Read more...Last updated: January 6, 2020
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: January 6, 2020
The Jimblebar Optimisation Project is a revision of the existing Jimblebar Iron Ore Mine approved under Ministerial Statements 683, 809 and 857. The Revised Proposal is for mining operations at Jimblebar, located approximately 40 km east of the town of Newman. Mining of iron ore deposits will be undertaken above and below the water table. Mining operations will include open pits, overburden storage areas and the construction and operation of associated mine, processing and rail infrastructure.... Read more...Last updated: December 23, 2019
The Warrawoona Gold Project, located approximately 20km south of Marble Bar, will abstract ore from an open pit and underground mine at the Klondyke deposit as well as a cutback of the existing Copenhagen pit. Ore will be processes at around 2Mtpa at Klondyke. The project will produce gold bar and gold concentrate and is expected to operate for approximately six years. The proposal would include a total disturbance of 398 hectares. Read more...Last updated: December 18, 2019
Ongoing operation of the North West Shelf Project to enable the long-term processing of third party gas and fluids and North West Shelf Joint Venture field resources through the North West Shelf Project facilities until around 2070. Read more...Last updated: December 2, 2019
The Proponent, FMG Iron Bridge Ltd, proposes to construct and operate the North Star Magnetite Iron Ore Mine, located approximately 110km south of Port Hedland, WA. The Project also includes a borefield in the Canning Basin and a slurry pipeline to transport the ore product to Port Hedland for export. Read more...Last updated: November 28, 2019
Venturex Resources Limited propose to develop the Sulphur Springs Zinc-Copper Project located approximately 144 kilometres (km) south-east of Port Hedland and 57 km west of Marble Bar. The project includes an open pit mine to extract the upper portion of the orebody and an underground mine to extract the lower portion of the orebody. The project has a disturbance footprint of 313.6 hectares (ha) within an 889.2 ha development envelope and consists of the following physical and operational... Read more...Last updated: November 27, 2019
Reward Minerals propose to develop the Lake Disappointment Potash Project (located approximately 320 km east of Newman). The proposal is to abstract brine from sediments and use solar evaporation ponds on the surface of the lake to create the potash product. The proposal would disturb 7,250 ha of land which includes 437 ha of vegetation, with the remainder of disturbance to the surface of Lake Disappointment. Read more...Last updated: November 26, 2019
The Proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. The Approved Project (authorised by Ministerial Statement 933 , 1 February 2013) is an above the water table open cut mine and associated infrastructure, located on mining tenement M470/1439. This proposal is to mine below the water table. Read more...Last updated: November 26, 2019
The Conservation Council of WA (CCWA) has referred the Greater Enfield Tieback Project – Exmouth Gulf Shipping Operations on behalf of Woodside Energy Ltd (the proponent) for environmental impact assessment under section 38 of the Environmental Protection Act 1986. CCWA are concerned about the likely environmental impacts as a result of these operations in the Gulf. Public comment on the referral are welcome and will be considered by the EPA. , Referral , The Greater Enfield Tieback Project... Read more...Last updated: November 21, 2019
The Proposal is to construct and operate the Pluto to Northwest Shelf Interconnector, a 3.3 km long, steel buried natural gas pipeline, connecting the Pluto Interconnector Compressor Station to the Karratha Gas Plant which is operated by Woodside on behalf of the North West Shelf Project participants, located on the Burrup Peninsula in the North of Western Australia. The proposal will require the clearing of an estimated 10.69 ha.3.26 ha within the Karratha Gas Plant Lease and Buffer Zone Lease... Read more...Last updated: November 18, 2019
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: November 8, 2019
Hamersley Iron Pty Limited have submitted a revised proposal for Brockman IV. This proposal provides for the expansion of the existing mine including additional clearing and the release of excess water, as well as some other minor changes. Read more...