This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: February 26, 2015
The Minister for Environment has requested that the EPA inquire into and report on the matter of changing the implementation conditions relating to Ministerial Statement 905 in order to: extend the time limit on shipments of lead carbonate through Fremantle Port (condition 3A); and reduce the amount of the financial assurance required and allow the release and reinstatement of the financial assurance in the event operations are suspended (condition 18). Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: February 23, 2011
The proposal is to develop an open-cut lead carbonate mine and processing facilities approximately 30 kilometres west of the Wiluna townsite to produce a lead concentrate. The lead concentrates will be refined at the Wiluna minesite to produce lead metal, or alternatively will be transported by road to the Geraldton Port and exported. Post-assessment changes to the proposal stipulate that the lead carbonate concentrate produced at the mine-site is transported in sealed bags within locked... Read more...Last updated: December 1, 2009
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...