This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 2, 2024
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...Last updated: November 27, 2023
Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...Last updated: December 19, 2022
Wasterock Pty Ltd and Hazelland Pty Ltd propose to remediate a historical inert landfill located at Lot 20 Adelaide Street Hazelmere for future commercial use. The proposal would involve recontouring the existing site and capping it with clean fill. Read more...Last updated: March 14, 2022
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: May 18, 2020
Changes to condition 2 (Proponent Commitments), condition 4 (Compliance Audit and Performance Review), condition 5 (Decommissioning Plan), condition 6, (Review of Options for the Transport of Solid Sodium Cyanide), condition 7 (Transport of Solid Sodium Cyanide), condition 8 (Transport of Liquid Sodium Cyanide), condition 9 (Noise Management), condition 10 (Emissions Verification) and condition 11 (Cyanide Monitoring). Read more...Last updated: December 14, 2015
The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...Last updated: November 18, 2002
The proposal is to construct and operate a commercial scale HIsmelt Process Plant at Kwinana in Western Australia. The plant will be located at the site currently occupied by the existing HIsmelt Research and Development Facility (HRDF) within the northern portion of the Kwinana Industrial Area (KIA), 40km south of Perth. The Stage 1 plant will initially produce around 820,000 tonnes per annum of pig iron. If the Stage 1 plant is found to be technically and commercially viable, the proponent... Read more...Last updated: October 13, 1997
The proposal is to to increase the production of Kingstream Resources' recently assessed Mid West Iron & Steel Project Geraldton Steel Plant (GSP), at the Narngulu Industrial Estate south-east of Geraldton, from 1.0 Mt/a to 2.4 Mt/a. Changes are also proposed to the product, specifically that slab steel be produced rather than rolled coil, with resulting changes in the requirement for major plant. Read more...Last updated: July 2, 1996
The proposal is to expand alumina production from 2.0 million tonnes per annum to 3.5 million tonnes per annum at the Worsley Alumina Refinery, Collie, and undertake associated bauxite mining activities at Boddington. Read more...Last updated: November 1, 1991
Proposal to establish a cereal straw and waste paper pulp and paper mill near Moora in the Central Midlands district of Western Australia. Read more...Last updated: September 12, 1991
Deras (Australia) Pty Ltd (Deras) proposes to establish and operate a 'wet-blue' tannery within the Shire of West Arthur, approximately 14 km north-east of Darkan. The facility would tan up to 220,000 cattle hides per annum using conventional tanning procedures. Hides would be mainly purchased from abattoirs in the south-west. The site would include a receival yard, a parking area, process building (including storage and office areas), a water reservoir and a wastewater treatment and... Read more...