This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 6, 2023
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: November 9, 2020
NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub. The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020. This referral is for ... Read more...Last updated: October 15, 2020
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: July 14, 1997
The proposal is to construct a pipeline fabrication site within the exrstmg Mardie Station Pastoral lease and existing Vacant Crown Land Reserve, approximately 45km south west of Dampier and 15km east of Cape Preston is detailed in the CER. Read more...