This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 17, 2024
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: December 15, 2023
The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...Last updated: May 27, 2020
Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...Last updated: August 21, 2019
Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...Last updated: January 25, 2017
The proponent proposes to extend its existing Yilgarn mining operations to include the Koolyanobbing Range F Deposit (the proposal), located on the southern Koolyanobbing Range, approximately 50 kilometres (km) north-east of the town of Southern Cross. Read more...Last updated: December 5, 2016
The proponent, Mount Gibson Mining Limited, proposes to mine hematite ore from the Iron Hill and Iron Hill South Deposits. The Iron Hill Deposits are part of the Mt Gibson Range, which is located approximately 270 kilometres (km) east-south-east of Geraldton. The proposal is located within a 112 hectare (ha) development envelope. The proposal is for the development of two mine pits (20 ha), a waste rock landform (30 ha) and support infrastructure (37 ha), which includes topsoil stockpiles and... Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: May 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: August 4, 2015
The proposal is for an exploration drilling program which involves disturbance and clearing for access tracks and drill pads, and fencing, on banded iron formation ranges of the Perenjori Hills. Read more...Last updated: March 4, 2015
The extraction of silica sands from two new areas and the transfer of the ownership of land which contains the Muchea Limestone Communities Threatened Ecological Community to the conservation estate. Inquiry under s46 in regard to amending Ministerial Statements 703 and 920 . Read more...Last updated: March 27, 2013
Proposal by Robe River Mining Company Pty Ltd to mine iron ore at Mesa A/Warramboo. This report has been prepared in response to a request from the Minister under section 43(1) of the, Environmental Protection Act 1986, (EP Act) that the EPA re-assess the proposal in the light of additional information provided by the proponent. Read more...Last updated: January 9, 2012
The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...Last updated: December 15, 2009
The Red October Gold Project is located on the western shore of Lake Carey, 80km south of Laverton. The proposal is to mine approximately 16 million tonnes of ore and associated waste material over a two year period involves development of an open cut gold mine and waste rock dumps on the lake bed and construction of mine infrastructure and borrow pits on Anglefish Island adjacent to the mining pit. Read more...Last updated: February 12, 2009
The proposal is to develop an iron ore (haematite) mine at Jack Hills approximately 100 km west of Meekatharra. The project will have a lifespan of approximately seven years (five years of mining, two years of closure activities) and will be a contract mining operation. The project will consist of an open cut mine with one pit up to 140 metres deep (approximately 41.2 MT of ore and waste rock). The floor of the pit will be above the watertable and the pit will not be backfilled. Product will be... Read more...Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: May 25, 2006
The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...Last updated: December 20, 2002
Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: September 14, 2001
The proposal is for a large-scale nickel and cobalt mining and processing operation which will involve the mining and processing of up to 15 million dry tonnes per annum (Mtpa) of lateritic ore to produce approximately 60,000 tonnes per annum (tpa) of nickel and up to 8,000 tpa of cobalt. The ore will be mined at Marshall Pool, 55 km south-south-east of Leinster, and Lawlers, 10 km south of Leinster. Read more...