This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 2, 2024
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...Last updated: June 26, 2023
Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...Last updated: June 26, 2023
Inquire into implementation Condition 9 (Quarantine Expert Panel) and Condition 15 (Marine Turtle Expert Panel) to ensure that they are effective and act as an independent advisory group for the Minister for Environment and the proponent on matters relating to terrestrial and marine quarantine and marine turtle monitoring and management. It is noted that a second Section 46 inquiry into Ministerial 800 (dated 11-04-2023) has also been requested by the Minister for Environment in relation to... Read more...Last updated: June 7, 2023
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The proposal is located within a 14,181 ha Development Envelope with an indicative disturbance footprint of 7,406 ha. The proposal is for the mining and processing of iron ore to produce 3 Million tonnes per annum (Mtpa) of magnetite concentrate for export under Stage 1, with an increase to 16.5 Mtpa under Stage 2. The proposal includes a single pit (below water table), run-of-mine pad, concentrate... Read more...Last updated: May 29, 2023
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: May 16, 2022
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: March 21, 2022
The Proposal is located in the Pilbara region of Western Australia. CITIC Pacific Mining Pty Ltd on behalf of Sino Iron Pty Ltd and Korean Steel Pty Ltd is proposing to increase the rate of groundwater abstraction from the mine pits and discharge to the lower Fortescue River and estuary from 12 to 21 GLpa, which is an increase of 9 GLpa. The proposal is located within an area of existing pastoral, mining, and recreational use. The maximum rate of discharge will remain the same (667L/sec). The... Read more...Last updated: November 9, 2020
NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub. The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020. This referral is for ... Read more...Last updated: November 25, 2019
The Western Australian Water Corporation is proposing to construct the Perth Seawater Desalination Plant 2 (PSDP 2) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The PSDP2 Proposal will be located within the Kwinana Industrial Area, approximately 38 km south of the Perth Metropolitan Area, on Lot 1864, Riseley Road in Naval Base. PSDP2 will be developed in two stages (each with a... Read more...Last updated: May 14, 2018
Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...