This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 17, 2024
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: February 9, 2024
The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...Last updated: February 3, 2021
Main Roads WA is proposing to conduct works to upgrade approximately 1.5 kilometre (km) of High Street in the City of Fremantle, Western Australia. The upgrade from Stirling Highway to Carrington Street to a four lane dual carriageway is aimed at improving road safety. The works would require a total disturbance of approximately 20.1 hectares (ha), including 1.8 ha of the Fremantle Public Golf Course, Royal Fremantle Golf Club (Class A reserve) and 0.1 ha of the Fremantle Environmental Resource... Read more...Last updated: July 23, 2020
Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: December 6, 2016
The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...Last updated: February 4, 2016
The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. Read more...Last updated: December 14, 2015
The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: August 5, 2015
The proposal is to construct and operate an ammonia plant on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay-Hearson Cove Industrial Area and is approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. The site covers an area of about 72 hectares and the actual plant footprint and infrastructure (including a thermal desalination plant) will occupy an area of approximately 20 hectares. Read more...Last updated: June 26, 2013
Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: March 28, 2012
The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...Last updated: November 4, 2010
Identification of potential corridors and areas for future installation of water and waste water pipelines and associated infrastructure throughout the southern suburbs of Perth. Read more...