Home > Printer-friendly > Printer-friendly > Worsley Alumina - Efficiency and Growth Increase of Existing Operations to 4.4Mtpa Alumina Production

Worsley Alumina - Efficiency and Growth Increase of Existing Operations to 4.4Mtpa Alumina Production

Project
Proponent: 
Worsley Alumina Pty Ltd
Proposal description: 

Worsley Alumina Pty Ltd (Worsley) proposes to upgrade the Worsley refinery in order to increase production to 4.4 million tonnes per annum (Mtpa). Worsley has approval under Part IV of the Environmental Protection Act, 1986 for production of 3.7Mtpa, and the refinery currently operates at 3.25Mtpa. 

Assessment Number: 
1526
Region: 
South West
Referred under EP Act: 
s38
Industry sector: 
Land use
Last updated: 
May 16, 2023
2. Decision on whether to assess this proposal
Chair's Determination: 
Environmental Review and Management Programme (ERMP)
Preliminary Environmental Factors: 
Flora and Vegetation
Landforms
Terrestrial Environmental Quality
Terrestrial Fauna
Hydrological Processes
Date published: 
Monday, 21 June, 2004
3. Assessment
Environmental Review
Public submissions: 
Monday, 23 May, 2005 to Monday, 1 August, 2005
Environmental Review documentation: 
PDF icon Worsley Alumina ERMP Exec Summary
Proponent response to submissions: 
PDF icon RTS- Proponent Response.pdf
4. EPA Report on assessment
EPA Report Number: 
1209
EPA Report: 
PDF icon EPA Report 1209 - Worsely Alumina
Key Environmental Factors: 
Flora and Vegetation
Landforms
Terrestrial Fauna
Hydrological Processes
Date published: 
Monday, 28 November, 2005
Appeals close: 
Monday, 12 December, 2005
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Thursday, 13 April, 2006
Ministerial Statement: 
PDF icon Statement 719.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Statement 719 - Change the power plant from a single coal fired boiler to two circulating fluidized bed co-generation boilers - change to proposal approved on 26 October 2007.

Attachment 2 to Statement 719 - Increase the maximum production capacity to 4.7 million tonnes per annum - change to proposal approved on 26 February 2008.

Attachment 3 to Statement 719 - Clear 29 hectares of State forest for a lay down area for expansion-related plant and equipment and further stockpiling of overburden material for construction of bauxite residue disposal areas - change to proposal approved on 17 April 2008.

Attachment 4 to Statement 719 - Clear 16.5 hectares of State forest to expand freshwater lake at the bauxite refinery - change to proposal approved on 25 July 2008.

Attachment 5 to Statement 719 - Install an additional secondary crushing plant adjacent to the existing crushing facilities at Saddleback - change to proposal approved on 23 January 2009.

Attachment 6 to Statement 719 - Change to conveyor operations - change to proposal approved under s45C on 27 June 2011.

Attachment 7 to Statement 719 – Change to Sulphur Dioxide and Carbon Monoxide emissions – change to proposal approved under s45C on 30 April 2012.

Attachment 8 to Statement 719 - Increase in clearing within the Refinery Lease Area from 45.5 to 66.6 ha - change to proposal approved under s45C on 15 April 2016.

Attachment 9 to Statement 719 - Construction of a temporary water supply pipeline and associated pumping infrastructure from Wellington Dam to the Worsley Refinery which requires clearing of up to 2 ha of undisturbed native vegetation and up to 6 ha previously native vegetation within Wellington National Park - change to proposal approved under s45C on 30 November 2016.

Attachment 10 to Statement 719 - Conversion of the existing coal fired boilers to a natural gas fired facility (boilers) within the existing power and steam raising facilities at the Worsley Alumina Refinery. - change to proposal approved under s45C on 16 May 2023.

Attachments: 
PDF icon Notice and Summary of Reasons.pdf
Date of approval s. 45C: 
Friday, 26 October, 2007
Tuesday, 26 February, 2008
Thursday, 17 April, 2008
Friday, 25 July, 2008
Friday, 23 January, 2009
Monday, 27 June, 2011
Monday, 30 April, 2012
Friday, 15 April, 2016
Wednesday, 30 November, 2016
Tuesday, 16 May, 2023

Source URL:https://www.epa.wa.gov.au/proposals/worsley-alumina-efficiency-and-growth-increase-existing-operations-44mtpa-alumina