Ministerial Approval Statements

If the Minister for Environment determines that a proposal may be implemented, he/she issues a statement setting out the implementation decision and the conditions, if any, to which the implementation is subject. All Ministerial Approval Statements issued under s45(5) of the Environmental Protection Act 1986 are listed below with the most recent appearing first.

 Search all Ministerial Approval Statements

Go Search
  Displaying pages [ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21  ]
0732 - Floreat Lakes residential development north west sector, Herdsman Lake
Release Date: 4 December 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 350.04 KB)

0731 - Hamersley Iron dredging program for the Dampier Port upgrade
Release Date: 21 April 2008
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.42 MB)

0730 - Expansion of Jurien Gypsum Mining Operation ML70/1161, Shire of Dandaragan
Summary: The mining of a 53-hectare area and processing of approximately 1.3 million tonnes of gypsum recovered from Mining Lease 70/1161 using the facilities currently employed for operations in the adjacent Mining Lease 70/750. The proposal involves dredging and will form a permanent hypersaline water body of approximately four metres maximum depth. Dredging operations of approximately four metres maximum depth. Dredging operations are proposed to be undertaken every second year over a 2 to 4 week period to excavate approximately 100,000 tonnes of gypsum. The proposal is further documented in schedule 1 of this statement.

Attachment 1 to Statement 730 – Change to mining method, increase to quantity of material mined per year – change to proposal approved under s45C on 12 March 2012.
Status: Final
Release Date: 27 September 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 802.76 KB)

0729 - Wagerup Cogeneration Project
Summary: Ministerial Approval Statements
Release Date: 8 July 2008
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 807.73 KB)

0728 - Wagerup Alumina Refinery - Production to a maximum capacity of 4.7 million tonnes per annum and associated bauxite mining
Status: Final
Release Date: 19 September 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.21 MB)

0727 - Jack Hills Iron Ore Project, Shire of Meekatharra
Summary: Ministerial Environmental Conditions
Release Date: 2 May 2007
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.01 MB)

0726 - Tropical Timber Plantation Beagle Bay, Shire of Broome
Summary: Ministerial Environmental Conditions
Release Date: 12 September 2006
Appeals close
Click here for more information

0725 - Waroona Mineral Sands Project - Shire of Waroona
Summary: To construct and operate a mineral sands mine within mining tenements, M70/735, M70/797, and M70/1089, approximately 1km North of the Township of Waroona.
Release Date: 29 August 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.14 MB)

0724 - Bluewaters Power Station - Phase II Shire of Collie
Summary: The construction and operation of a sub-critical coal-fired base-load power generating facility with a nominal generating capacity of 200 megawatts adjacent to the Bluewaters I Power Station on a site located approximately four kilometres north-east of Collie, as documented in Schedule 1 of the Statement.

Attachment 1 to Statement 724 - Modification of the location footprint and clarification of "Maximum Facility Footprint", "Maximum Total Area", "Infrastructure", and "Construction Laydown Envelope" - s45C change to proposal approved on 9 October 2006.

Attachment 2 to Statement 724 - Increase in power generating capacity from 200 megawatts to 208 megawatts, increase in the size of the laydown area, changes to the air emissions profile, relocation of the wastewater treatment plant, and re-alignment of the coal conveyor - s45C change to proposal approved on 18 September 2007.

Attachment 3 to Statement 724 - Increase ancillary infrastructure area - s45C change to proposal approved on 12 August 2008.

Attachment 4 to Statement 724 - Addition of a second ash disposal site - s45C change to proposal approved on 7 November 2008.

Attachment 5 to Statement 724 - Increase greenhouse gas emissions to 1,562,000 tonnes per annum of carbon dioxide equivalent - s45C change to proposal approved on 2 September 2009.

Attachment 6 to Statement 724 - Increase power generating capacity from 208 megawatts to 212 megawatts - change to proposal approved under s45C on 23 March 2010.

Attachment 7 to Statement 724 – Removal of maximum sulphur oxides in emissions and plant thermal efficiency – change to proposal approved under section 45C on 7 January 2013.
Status: Final
Release Date: 24 May 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.04 MB)

0723 - Coburn Mineral Sand Project South-East of Denham, Shire of Shark Bay
Summary:

Development of the Coburn Mineral sand project including the excavation and processing of a low-grade heavy mineral sand deposit.

Attachment 1 to Statement 723 – Change to the mining method and the location of the mine infrastructure – change to proposal approved under s45C on 16 March 2007.

Attachment 2 to Statement 723 – Change to project life and location of disturbance footprint – change to proposal approved under s45C on 21 September 2011.

Attachment 3 to Statement 723  – Removal of time restrictions for increasing rate of mining and processing as well as the estimated volume of tailings – change to proposal approved under section 45C on 10 April 2014.


Status: Final
Release Date: 20 March 2007
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 3.35 MB)

0722 - Alkimos-Eglinton Metropolitan Region Scheme Amendment 1029/33
Summary: To amend reservations and zonings in the Metropolitan Region Scheme consistent with the Alkimos-Eglinton Structure Plan
Release Date: 9 May 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.26 MB)

0721 - Pilbara Iron Ore and infrastructure project: Cloud Break No Beneficiation
Summary: The proposal encompasses an open pit iron ore mine at Cloud Break, approximately 100 kilometres north-north-west of Newman, and an accomodation village, as documented in schedule 1 of this statement.

Attachment 1 to Statement 721 - Increase of dewatering to up to 25 GL/a, and reinjection to up to 18 GL/a - s45C change to proposal (as shown in Figure 4), approved on 25 September 2009.

Attachment 2 to Statement 721 - Amend the layout of the Cloud Break mine-site footprint (as shown in figure 5) and increase reinjection from 18 gigalitres to 20 gigalitres per annum - change to proposal approved under s45C on 12 July 2010.

Attachment 3 to Statement 721 – Increasing mine dewatering from 25 gigalitres per annum to 30 gigalitres and water injection from 20 gigalitres to 25 gigalitres and amend the annual rate of production – change to proposal approved under s45C on 10 June 2011.
Status: Final
Release Date: 13 July 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.66 MB)

0720 - Cataby Mineral Sands Project, Cataby , Shire of Dandaragan
Summary: To construct a mineral sands mine at Cataby approximately 150 km north of Perth.
Release Date: 26 April 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.29 MB)

0719 - Worsley Alumina - Production to Maximum Capacity of 4.4 Mtpa Alumina and Associated Mining
Summary: Upgrade the Worsley alumina refinery and associated mining in order to increase production to 4.4 million tonnes per annum.

Attachment 1 to Statement 719 - Change the power plant from a single coal fired boiler to two circulating fluidized bed co-generation boilers - change to proposal approved on 26 October 2007.

Attachment 2 to Statement 719 - Increase the maximum production capacity to 4.7 million tonnes per annum - change to proposal approved on 26 February 2008.

Attachment 3 to Statement 719 - Clear 29 hectares of State forest for a lay down area for expansion-related plant and equipment and further stockpiling of overburden material for construction of bauxite residue disposal areas - change to proposal approved on 17 April 2008.

Attachment 4 to Statement 719 - Clear 16.5 hectares of State forest to expand freshwater lake at the bauxite refinery - change to proposal approved on 25 July 2008.

Attachment 5 to Statement 719 - Install an additional secondary crushing plant adjacent to the existing crushing facilities at Saddleback - change to proposal approved on 23 January 2009.

Attachment 6 to Statement 719 - Change to conveyor operations - change to proposal approved under s45C on 27 June 2011.

Attachment 7 to Statement 719 – Change to Sulphur Dioxide and Carbon Monoxide emissions – change to proposal approved under s45C on 30 April 2012.
Status: Final
Release Date: 13 April 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.36 MB)

0718 - Gwindinup Mineral Sands Mine, Shire of Capel
Summary: The construction and operation of a mineral sands mine at Gwindinup, located within the Shire of Capel, approximately 25 kilometers sou-south-east of Bunbury and between two and ten kilometers south of the town of Boyanup.

Attachment 1 to Statement 718 - Clear an additional 4.3 hectares of native vegetation, increase the mine footprint, increase the amount of ore mined and change the mining period - change to proposal approved under s45C on 8 April 2009.

Attachment 2 to Statement 718 – Increase the mine footprint, increase the amount of ore mined and change the mining period – change to proposal approved under s45C on 24 November 2011.
Status: Final
Release Date: 5 April 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 8.06 MB)

0717 - Brockman Syncline 4 Iron Ore Project
Summary: Three Open pits, dry processing plant, associated iron ore mine infrastructure and an extension to the Brockman 2 rail spur in the Central Pilbara area. 60 Km West-North-West of Tom Price Shire of Ashburton.

Attachment 1 to Statement 717 – Redesign of approved mine site layout – plant, administration office, workshops, stacker reclaimer stockpiles, village, camp, waste dumps and stockpiles. Redesign of the rail spur. An increase in throughput from 20 to 22 megatonnes per year. An increase in water usage. The bitumen sealing of White Quartz Road. Removal of the conveyor and airstrip – change to proposal approved under section 45C on 19 September 2007.

Attachment 2 to Statement 717 – To change the route of the power line at its southern end to diverge from the rail infrastructure corridor and follow the Boolgeeda Valley and to change the power line capacity to 25 MW, operating at 33kV – change to proposal approved on 22 September 2008.

Attachment 3 to Statement 717 – An increase in throughput from 22 to 42 megatonnes per year. Increase in waste dump height and additional locations. Plant, crusher, stockpiles, camp and village. An increase in water usage. Mine access road. Product transport route.
Status: Final
Release Date: 24 March 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 3.61 MB)

0716 - Philips River Gold Project Shire of Ravensthorpe
Summary: The developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site, as documented in schedule 1 of this statement.
Release Date: 29 March 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.14 MB)

0715 - Koolan Island Iron Ore Mine and Port Facility Shire of Derby - West Kimberley
Summary: Re-opening of an iron ore mine, construction of associated infrastructure and a port facility on Koolan Island, and subsequent rehabilitation and decommissioning of the site.

Attachment 1 to Statement 715 - Increase in the accomodation capacity from 200 to 320 people approved under s45C on 2 April 2008.

Attachment 2 to Statement 715 - Increase to the disturbance area from 540 hectares to 590 hectares - change to proposal approved under s45C on 4 Mar 2009.

Attachment 3 to Statement 715 – Increase in groundwater abstraction from 75 kilolitres per day to 120 kilolitres per day of fresh water from existing bores, for potable use – change to proposal approved under s45C on 11 January 2012.

Attachment 4 to Statement 715 – Increase to Disturbance Footprint from 590 ha to 650 ha – change to proposal approved under section 45C on 21 June 2012.
Status: Final
Release Date: 22 February 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.05 MB)

0714 - Abernethy Road - Tonkin Highway on-ramp
Summary: Construction of an on-ramp from Abernethy Road to Tonkin Highway in Kewdale, City of Belmont
Release Date: 10 December 2007
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 581.1 KB)

0713 - Hard Rock Quarry - ML47/26, 255, 306, 309, 331, 333 353, Burrup Peninsula
Summary: 713 - Ministerial Approval Statements
Release Date: 31 January 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.54 MB)

0712 - Orebody 25 Extension Project, 8 kms northeast of Newman, Shire of East Pilbara
Summary: The proposal is to expand the existing mining operations at the Orebody 25 mine, located eight kilometres north-east of Newman, in the Pilbara Region. The project involves mining the remaining ore from Pits 1 and 3, and mining Pit 3 to below the water table, therefore increasing the ore production rate to eight million tonnes per annum, as documented in Schedule 1 of Statement 712.

Attachment 1 to Statement 712 - Mining below the watertable within Orebody Pit 1 to a depth below the watertable of approximately 30 metres. The pit will be backfilled to 5 metres above the watertable with waste material at the cessation of mining activities - s45C change to proposal approved on 11 June 2008.

Attachment 2 to Statement 712 - Change OB25 mine operation life until 2018 to mine additional ore from Pit 3 and portion of Pit 1 (i.e. Pit 1 East) - s45C change to proposal approved on 2 October 2009.

Attachment 3 to Statement 712 - Increase in disturbance area and development envelope – change to proposal approved under section 45C on 19 September 2012.
Status: Final
Release Date: 28 October 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.38 MB)

0711 - Argyle Diamond Mine, Underground Project, 11km South of Kununurra, Shire of Wyndham-East Kimberly
Summary:

To extend the current Argyle Diamond Mine Operations at Argyle Diamond Mine to develop an underground diamond mine and associated infrastructure, as documented in schedule 1 of this statement.

Attachment 1 to Statement 711 – Deletion of the “Key Characteristics” from Table 1 of Schedule 1 of Statement 711 which are not relevant to the environment; Amendment to daily “Dewatering Requirements” limits; Removal of reference to “Alternative Power Supply”; and update all Figures in Schedule 1 – change to proposal approved under section 45C on 17 April 2014.


Status: Final
Release Date: 11 January 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.56 MB)

0710 - Dampier to Bunbury Natural Gas Pipeline, Northern Looping Project, Loops 1 to 9, Karratha to Bullsbrook
Summary: Ministerial Approval Statements
Release Date: 5 July 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.02 MB)

0709 - Expansion of the Monkey Mia Dolphin Resort, Monkey Mia, Shark Bay
Summary: Ministerial Approval Statements
Release Date: 10 January 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 577.61 KB)

0708 - Dampier to Bunbury Natural Gas Pipeline, Southern Looping Project, Loop 10, South of Kwinana
Summary: Ministerial Approval Statements
Release Date: 10 January 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 557.17 KB)

0707 - Pilbara Iron Ore Infrastructure Project: East-West Railway Mine Sites Stage B
Summary: Proposal: The proposal encompasses open pit iron ore mines at Christmas Creek and Mindy Mindy, a beneficiation plant at Christmas Creek, a borefield and an east-west railway to link the Stage A north-south railway to Port Hedland with the Christmas Creek minesite, as documented in schedule 1 of statement 707.

Attachment 1 to Statement 707 - Increase to Christmas Creek clearance area (by 12.5ha) - section 45C change to proposal approved on 21 October 2006.

Attachment 2 to Statement 707 - Alterations to rail corridor alignment and length - section 45C change to proposal approved on 3 October 2008.

Attachment 3 to Statement 707 - To haul iron ore from Christmas Creek to Cloud Break via truck along existing roads, in addition to the approved transportation by train - section 45C change to proposal approved on 23 June 2009.

Attachment 4 to Statement 707 - Additional impact area for rail duplication works (by 102ha) - section 45C change to proposal approved on 21 December 2009.

Attachment 5 to Statement 707 - to realign approximately 6 kilometres of the western portion of the access road used to haul ore from the Christmas Creek to Cloud Break mine sites - change to proposal approved under s45C on 15 March 2010.

Attachment 6 to Statement 707 - Extension of pipeline from the Hillside East reinjection borefield into the Christmas Creek mine site - change to proposal approved under s45C on 6 April 2010..

Attachment 7 to Statement 707 -
  • Construction of additional rail infrastructure;
  • Construction of an access/transport route between the Christmas Creek mine site and Marble Bar Road, as shown in Figure 8 (this replaces the section of road between the Christmas Creek mine site and Marble Bar Road depicted in Figure 3 of Attachment 1); and
  • Removal of production rate from Key Characteristics Table - change to proposal approved under s45C on 28 March 2012.

Status: Final
Release Date: 8 April 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 3.13 MB)

0706 - Voyager Quarry, Lots 11 14, Horton Road, The Lakes, Avon Location 1881, Shire of Northam
Summary: Ministerial Approval Statements
Status: Final
Release Date: 29 April 2008
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 3.07 MB)

0705 - Relocation of Herne Hill Quarry Operation
Summary: Ministerial Approval Statements
Release Date: 10 January 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 225.72 KB)

0704 - Dampier to Bunbury Natural Gas Pipeline, Kemerton Lateral Gas Pipeline, Kemerton, Shire of Harvey
Release Date: 3 January 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 550.7 KB)

0703 - Kemerton Silica Sand Mining Proposal - Additional mining areas transfer of land for conservation
Release Date: 3 January 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.52 MB)

0702 - Hamersly Iron Dampier Port upgrade to a throughput capacity of 120 million tons per annum
Release Date: 3 January 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.44 MB)

0701 - Industrial Development, Tonkin Industrial Park, Bassendean Stages 1 2 Tonkin Industrial Park Containment Cell Dimensions, Bassendean
Summary: Ministerial Approval Statements
Release Date: 10 January 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 815.06 KB)

0700 - Sodium Cyanide Plants Liquid and Solid at Kwinana and Transport of Sodium Cyanide by Road and Rail from Kwinana
Summary: The operation of liquid and solid sodium cyanide production plants at Kwinana, and the transport of sodium cyanide by road and rail from Kwinana, as documented in schedule 1 of this statement.

Attachment 1 to Statement 700 – Increase in the liquid sodium cyanide production capacity from 70,000 to 85,000 tonnes per annum (tpa). Minor changes to the solid sodium cyanide plant facilities to accurately reflect the requirements for achieving the currently approved production capacity of 45,000 tpa – change to proposal approved under section 45C on 4 February 2013.


Status: Final
Release Date: 22 November 2005
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.63 MB)

0699 - Clay Excavation Lots 7, 19, 60, 63, 64 20 Hallett Copley Roads formerly Port Lot 1 Lots 222, 27, 26, 25, 28 7 Hallett Copley Roads, Lots 19, 45 46 St Alban�s Road, Lot 100 Great Northern Highway Upper Swan
Summary: The operation of a clay excavation facility in Upper Swan, as documented in Schedule 1 of Statement 699.

Attachment 1 to Statement 699 - Inclusion of an additional lot (Lot 18 St Alban�s Road, Upper Swan) into the Upper Swan clay extraction area - s45C change to proposal approved on 2 November 2009.
Release Date: 6 November 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 4.41 MB)

0698 - Kwinana Gas-Fired Power Station Water-Cooled Condenser Leath Barter Roads, Kwinana
Summary: Ministerial Approval Statements
Release Date: 11 September 2007
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.3 MB)

0697 - Greater Bunbury Region Scheme
Summary: Ministerial Approval Statements
Release Date: 15 November 2005
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 402.24 KB)

0696 - Gas pipeline to Nifty Copper Operations, Great Sandy Desert
Summary: Ministerial Approval Statements
Release Date: 18 November 2005
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 79.89 KB)

0695 - Yandicoogina Junction South East Mine, Mining Lease 274SA, Shire of East Pilbara
Summary: To mine iron ore within Mining Lease 274SA at a rate of approximately 16 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site.

Attachment 1 to Statement 695 - Remove the detailed breakdown of the disturbance area - change to proposal approved under s45C on 4 March 2009.

Attachment 2 to Statement 695 - Increase of dewatering cap (shared with Statement 523) to 35 GL/a - change to proposal approved under s45C on 16 Jul 2009.

Attachment 3 to Statement 695 - Increase in mine impact area to up to 980 hectares, and increase in mining rate to 22 million tonnes per annum – change to proposal approved under s45C on 26 October 2010.

Attachment 4 to Statement 695 – To clear an additional 212 ha of vegetation for waste dumps, topsoil stockpiles and haul road diversions and to increase the mining rate by 2 million tonnes per annum – change to proposal approved under s45C on 12 October 2011.
Status: Final
Release Date: 17 July 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.82 MB)

0694 - Gas-Fired Co-Generation Facility Worsley, Shire of Collie
Summary: Ministerial Approval Statements
Release Date: 15 November 2005
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 929.71 KB)

0693 - Kwinana Gas-Fired Power Station, Leath Barter Roads, Kwinana
Summary: Ministerial Approval Statements
Release Date: 20 October 2005
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.55 MB)

0692 - East Clontarf Residential Development, Waterford, City of South Perth
Summary: Ministerial Approval Statements
Release Date: 19 June 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.28 MB)

0691 – Final Remediation Works for the Former Cresco Site, Bayswater
Summary: Summary: Remediation of the former Cresco site, which is the land bounded by Tonkin Highway and Railway Parade in the City of Bayswater, involving treatment of soil and groundwater and removal of infrastructure, so that it is suitable for future commercial/industrial use.
Status: Final
Release Date: 5 October 2005
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 275.97 KB)

0690 - Pilbara Iron Ore and Infrastructure Project: Port North-South Railway Stage A
Summary: Proposal: Construction of a port at Anderson Point in Port Hedland, which includes shipping facilities, reclaimed areas for iron ore handling infrastructure, stockpiles and ancillary facilities, and a connecting north-south railway over a distance of approximately 345 kilometres to resources in the east Pilbara at Mindy Mindy, as documented in schedule 1 of Statement 690.

Attachment 1 to Statement 690 - Increase of dredging area and clearance area for Port � 45C change to proposal approved on 6 April 2006.

Attachment 2 to Statement 690 - Additional clearance for temporary access road - 45C change to proposal approved on 17 August 2006.

Attachment 3 to Statement 690 - Additional infrastructure listed as part of Rail Loop and Railway Alignment - 45C change to proposal approved on 12 September 2006.

Attachment 4 to Statement 690 - Increase of dredging area and clearance area for Port - 45C change to proposal approved on 27 April 2007.

Attachment 5 to Statement 690 - Description of conveyors as uncovered - 45C change to proposal approved on 4 April 2008.

Attachment 6 to Statement 690 - Extension of construction period and addition of two car dumpers - 45C change to proposal approved on 7 August 2008.

Attachment 7 to Statement 690 - Additional rail infrastructure and associated clearance of an additional 606 hectares - 45C change to proposal approved on 17 December 2009.

Attachment 8 to Statement 690 - Increase in railway corridor disturbance (371 hectares) due to construction of additional infrastructure, increase in port operating area (3 hectares) due to widening of causeway – section 45C change to proposal approved on 21 August 2011.

Attachment 9 to Statement 690 – Remove and amend the port elements of Schedule 1 to include wharf AP5, and removal of references to export tonnage in Schedule 1 – change to proposal approved under section 45C on 6 February 2014.

Status: Final
Release Date: 29 January 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 3.29 MB)

0689 - Ammonium Nitrate Production Facility Expansion, Kwinana
Summary: Ministerial Approval Statements
Release Date: 6 October 2005
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 846.04 KB)

0688 - Jandakot Mound Groundwater Resources including Jandakot Groundwater Scheme, Stage 2
Summary: Ministerial Approval Statements
Release Date: 27 September 2005
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 431.88 KB)

0687 - Gnangara Mound Groundwater Resources including Groundwater Resource Allocation, East Gnangara, City of Swan
Summary: Ministerial Approval Statements
Release Date: 27 September 2005
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 493.48 KB)

0686 - Campbell Road Estate Super-Lot Subdivision, City of Gosnells
Summary: Ministerial Approval Statements
Release Date: 9 September 2005
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 503.43 KB)

0685 - Bluewaters Power Station, Shire of Collie
Summary: The construction and operation of a sub-critical coal-fired base-load power generating facility with a nominal generating capacity of 200 megawatts adjacent to the Bluewaters I Power Station on a site located approximately four kilometres north-east of Collie, as documented in Schedule 1 of the Statement.

Attachment 1 to Statement 685 - Modification of the location footprint and clarification of "Maximum Facility Footprint", "Maximum Total Area", "Infrastructure", and "Construction Laydown Envelope" - s45C change to proposal approved on 9 October 2006.

Attachment 2 to Statement 685 - Increase in power generating capacity from 200 megawatts to 208 megawatts, increase in the size of the laydown area, changes to the air emissions profile, relocation of the wastewater treatment plant, and re-alignment of the coal conveyor - s45C change to proposal approved on 18 September 2007.

Attachment 3 to Statement 685 - Increase ancillary infrastructure area - s45C change to proposal approved on 12 August 2008.

Attachment 4 to Statement 685 - Addition of a second ash disposal site - s45C change to proposal approved on 7 November 2008.
Attachment 5 to Statement 685 - Increase greenhouse gas emissions to 1,562,000 tonnes per annum of carbon dioxide equivalent - s45C change to proposal approved on 2 September 2009.

Attachment 6 to Statement 685 - Increase the power generating capacity from 208 megawatts to 217 megawatts - s45C change to proposal approved on 23 October 2009.

Attachment 7 to Statement 685 – Removal of maximum sulphur oxides in emissions and plant thermal efficiency – change to proposal approved under section 45C on 7 January 2013.
Status: Final
Release Date: 24 August 2005
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.42 MB)

0684 - Ellendale 4 Diamond Project, West Kimberly, Shire of Derby-West Kimberly
Summary: Ministerial Approval Statements
Release Date: 12 June 2008
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 917.9 KB)

0683 - Wheelarra Hill Iron Ore Mine Extension, Life-of-Mine Proposal, Mining Lease 266SA, 40 km East of Newman, Shire of East Pilbara
Summary: Ministerial Approval Statements
Release Date: 21 November 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.28 MB)