If the Minister for Environment determines that a proposal may be implemented, he/she issues a statement setting out the implementation decision and the conditions, if any, to which the implementation is subject. All Ministerial Approval Statements issued under s45(5) of the Environmental Protection Act 1986 are listed below with the most recent appearing first.

 Search all Ministerial Approval Statements

Go Search
  Displaying pages [ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21  ]
0838 – Coolimba Power Station Project - Shire of Carnamah and Shire of Coorow
Summary: The proposal is for the construction and operation of a power station comprising of a nominal 450 MW coal-fired base-load generation plant and a nominal 358 MW natural gas-fired peaking-load generation plant on a site located approximately 15 km south-south-west of Eneabba. The proposal also involves the establishment of an approximately 20 km long and 100 m wide infrastructure corridor that will accommodate the construction and operation of a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline or the Parmelia Gas Pipeline, and a 330 kV electricity transmission line to connect the power station to the external electricity network at the proposed Eneabba Substation.
Status: Final
Release Date: 17 September 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 365.32 KB)

0837 – Bluewaters Power Station Expansion - Phase III and Phase IV Shire of Collie, Shire of Dardanup, Shire of Harvey
Summary:

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same alignment as the existing Collie A Power Station wastewater pipeline with a route deviation through the coastal foredune system, and an ocean outfall consisting of an approximately 650 metre long pipe including a 110 metre long diffuser located north of the Leschenault Inlet at Buffalo Road.

Note: Condition 6-1 of this Ministerial Statement has been deleted. See Statement 851.

Attachment 1 to Statement 837 – Figure 5 of Statement 837 is replaced and superseded by Figure 6 – change to proposal approved under s45C on 18 Apr 2012.


Status: Final
Release Date: 17 September 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 3.47 MB)

0836 – Shire of Harvey Local Planning Scheme No. 1 Amendment No. 63 - Lots 195, 304 and Part Lot 9003 Lakes Parade, Binningup - Rezoning from Residential, General Farming and Recreation to Residential Development and Recreation
Summary: Amendment No. 63 to the Shire of Harvey Local Planning Scheme No.1 to rezone Lots 195, 304 and Part Lot 9003 Lakes Parade, Binningup from Residential, General Farming and Recreation to Residential Development and Recreation.
Status: Final
Release Date: 17 September 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 87.5 KB)

0835 - Development and Conservation Proposal - Lot 4 Underwood Avenue, Shenton Park
Summary: The proposal area is approximately 33.4 hectares of Lot 4 Underwood Ave in Shenton Park. Within this area the University intends to establish a conservation area (13.9 hectares), Public Open Space (2 hectares) and a development area (17.5 hectares). The development area includes approximately 13 hectares to be developed for residential purposes with the remainder of the area for �University purposes - future use and development�, as it is affected by odour from the Subiaco Wastewater Treatment Plant. This area will remain vegetated pending the clarification of the development and land use potentials of this land with relevant planning authorities in accordance with Local Planning Scheme requirements.
Release Date: 14 July 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 273.62 KB)

0834 - Orebody 24/25 Upgrade Project
Summary: BHP Billiton Iron Ore is proposing to develop the Orebody 24 (OB24) deposit located north of Orebody 25 (OB25) Mine, and approximately 10 km north-east of the town of Newman in the Pilbara Region. New and existing OB25 infrastructure would be utilised.

Attachment 1 to Statement 834 – The disturbance area and ore processing rate are changed to enable a rail spur, train load-out facility, and on-site ore handling plant (approved in the original proposal) to be constructed and used at the Orebody 24 Mine. – change to proposal approved under s45C on 16 November 2011.
Status: Final
Release Date: 8 July 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 515.51 KB)

0833 - Marandoo Mine Phase 2, Shire of Ashburton
Summary:

The expansion of existing mining operations at Marandoo by mining below the water table, including expansion of the existing mine pit and development of new waste dumps.

Attachment 1 to Statement 833 – Amendments to conditions 4-6, 8-2, 8-3, 8-8, 8-9 and 8-10  – change to proposal approved under section 46C on 9 May 2013.

Attachment 2 to Statement 833 – Amendment to condition 8-1 – change to proposal approved under section 46C on 4 June 2014.


Status: Final
Release Date: 8 July 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 385.68 KB)

0832 - Perth Metropolitan Desalination Proposal - Water Quality Management, Change to Implementation Conditions Section 46
Summary: The construction and operation of a seawater desalination plant at a site in the Kwinana / East Rockingham area, and associated seawater intake, concentrated seawater discharge pipelines, and product pipeline to Tamworth Hill or Thomson�s Reservoir.Upgrading of the capacity of the plant to 45 Gigalitres per year at the Kwinana site will include increasing the production of potable water, use of seawater, and discharge of concentrated seawater and further options for combining intake seawater with cooling water discharged from Western Power�s Kwinana Power Station, as documented in schedule 1 of this statement.
Release Date: 28 June 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 16.45 KB)

0831 - Smiths Beach Development, Sussex Loc 413, Yallingup
Summary: The strategic proposal is to:
a)extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413, and
b) develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan.
Release Date: 15 June 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.11 MB)

0830 - Ord River Irrigation Area Stage 2 M2 Supply Channel, Kununurra
Summary: The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains, as documented in schedule 1 of this statement.
Release Date: 7 May 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.09 MB)

0829 - Roy Hill 1 Iron Ore Mining Project Stage 2, 110 kilometres north of Newman, Shire of East Pilbara
Summary: The proposal is to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline.

Attachment 1 to Statement 829 – Change to mining schedule, location of key infrastructure, groundwater drawdown figure and coordinates (this attachment replaces Figure 2, Figure 3 and Figure 5 of Schedule 1) – change to proposal approved under section 45C on 3 February 2012.
Status: Final
Release Date: 31 March 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1005.45 KB)

0828 - Austral Bricks Previously Prestige Brick Brickworks at Midland
Summary: The construction and operation of a brick making facility on Lot 1 on Plan 16497 Military Road, Bellevue, as documented in schedule 1 of the statement.
Status: Final
Release Date: 23 March 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 720.32 KB)

0827 - Balmoral South Iron Ore Project, Cape Preston, Shire of Roebourne
Summary: Amendment of conditions applying to the construction and operation of 80 million tonne per annum iron ore mine, power station, desalination plant, processing plant, pellet plants and accommodation in the Southern Block orebody of the Cape Preston area.
Release Date: 23 March 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 12.75 KB)

0826 - Port Rockingham Marina
Summary: The proposal is to construct and operate a new marina facility located at the intersection of Wanliss Street and Rockingham Beach Road, Rockingham, within Cockburn Sound.
Release Date: 18 February 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.4 MB)

0825 - Busselton Regional Aerodrome
Summary: Amendment of Ministerial conditions to operate the Busselton Regional Aerodrome at the Four Mile Hill site.
Release Date: 11 February 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 7.85 KB)

0824 - Roy Hill 1 Iron Ore Mining Project Stage 1, 110 Kilometres North of Newman, Shire of East Pilbara
Summary: The proposal is to mine iron ore from the Stage 1 project area on the southern slopes of the Chichester Range and develop associated mining infrastructure.

Attachment 1 to Statement 824 – Revision of the approved realignment of Marble Bar Road – change to proposal approved under s45C on 15 December 2010.

Attachment 2 to Statement 824 – Change to mining schedule, location of key infrastructure, groundwater drawdown figure and coordinates (this attachment replaces Figure 2, Figure 3, Figure 4 and Figure 5 of Schedule 1, and the table of GIS coordinates in Schedule 2) – change to proposal approved under section 45C on 3 February 2012.
Status: Final
Release Date: 23 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.02 MB)

0823 - Balmoral South Iron Ore Project, Cape Preston, Shire of Roebourne
Summary: The construction and operation of 80 million tonne per annum iron ore mine, power station, desalination plant, processing plant, pellet plants and accommodation in the Southern Block orebody of the Cape Preston area.
Release Date: 23 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 810 KB)

0822 - Iron Ore Mine, Downstream Processing Direct - Reduced Hot Briquetted Iron and Port Construction, Cape Preston, Pilbara
Summary: The construction and operation of a 44.8 million tonnes per annum iron ore mine, power station, desalination plant, processing plant and accommodation and port facilities in the Cape Preston area as documented in Schedule 1 of Statement 635. The processing plant will produce pelletised, direct-reduced iron and hot-briquetted iron.
Release Date: 23 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 15.87 KB)

0820 - Shire of Waroona Town Planning Scheme No. 7 Amendment No. 4 - Rural 6 "Rural Residential" Zone, Lot 3 Southern Estuary Road, Lake Clifton
Summary: (a) rezoning Lot 3 Pt. Wellington Location 2942 Southern Estuary Road, Lake Clifton from "Rural 1 General Farming" to "Rural 6 - Rural-Residential", and (b) incorporating into Schedule 2 of the Scheme Text Policies and provisions relating to development on Lot 3 Location 2942, Southern Estuary Road.
Status: Final
Release Date: 23 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.74 MB)

0819 - Gnangara Mound Groundwater Resources including groundwater resource allocation, East Gnangara, City of Swan
Summary: The management and abstraction of groundwater for public and private water supply from the Gnangara Mound, with provision for environmental water requirements, as documented in this statement.
Release Date: 4 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 87.79 KB)

0818 - Chichester Rail Deviation, Shire of Ashburton
Summary: BHP Billiton Iron Ore is proposing to construct 23 kilometres of dual track railway and associated rail infrastructure within the Chichester ranges, approximately 220 kilometres south of Port Hedland. The proposal includes clearing of 400 hectares of vegetation. The required water supply would be approximately 1000 kL/day to be sourced from two existing bores. The proposal also involves the construction of communications cabling, a communications tower, level crossings, signalling, access tracks, and borrow pits.

Attachment 1 to Statement 818 � Increased groundwater requirements and revised culvert numbers and locations � change to proposal approved under s45C on 13 April 2010.
Release Date: 13 April 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 259.23 KB)

0817 - Industrial Subdivision of lots 300-303 and 9001 Beringarra Avenue, Malaga, City of Swan
Summary: The proposal involves the subdivision of Lots 300-303 and 9001 Beringarra Avenue into 67 industrial lots.
Release Date: 25 November 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 295.5 KB)

0816 - Albany Iron Ore Project - Southdown Magnetite Proposal mine, ore slurry and water pipelines, and port loading facilities 90 kilometres east-north-east of Albany
Summary: The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany.

Attachment 1 to Statement 816 – Increase in production rate and pit depth, relocation of infrastructure, and changes to pipeline alignment – change to proposal approved under s45C on 27 June 2011.

Attachment 2 to Statement 816 – Section 45C change to waste dump footprint – change to proposal approved under s45C on 22 November 2011.
Status: Final
Release Date: 7 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.6 MB)

0815 - Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley
Summary: The construction of a deepwater port at either the "north", "central", or "south" location, as allowed in Statement No. 469.

Attachment 1 to Statement 815 – Deletion of introductory clause and insertion of correct standard introductory clause – change to proposal approved under section 46C on 12 August 2011.
Status: Final
Release Date: 25 November 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 33.78 KB)

0814 - Cundaline and Callawa Mining Operations
Summary: BHP Billiton Iron Ore is proposing to develop the Cundaline and Callawa Iron Ore deposits located near the existing Goldsworthy operations, 200km east of Port Hedland in the Pilbara Region. New and existing Goldsworthy infrastructure would be utilised.

Attachment 1 to Statement 814 – Increase in maximum disturbance and land disturbance boundaries – change to proposal approved under section 45C on 11 February 2013.
Status: Final
Release Date: 25 November 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.58 MB)

0813 - Silicon Project, Kemerton and Mine at Moora
Summary: The mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. The revised proposal is for the increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the associated increase in production. The proposal is documented in schedule 1 of this statement.
Status: Final
Release Date: 16 November 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.23 MB)

0812 - Dredging at Nelson Point, BHP Billiton RGP6 Project, Port Hedland
Summary: The proposal involves the dredging of not more than 6 million cubic metres (Mm3) of material for two new berth pockets and extensions to the existing departure channel and swing basin at Nelson Point to accommodate vessels of approximately 250,000 dead weight tonnes (DWT), disposal of dredged material at both offshore in Commonwealth waters site and to a land based dredged material management area (DMMA), as documented in schedule 1 of this statement.
Release Date: 4 November 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 400.7 KB)

0811 - Koolanooka/Blue Hills direct shipping ore mining project, Shires of Morawa and Perenjori
Summary:

The proposal is to mine hematite ore at Koolanooka Hills and at Mungada West and Mungada East (part of the Blue Hills Range), to reinstate the Mungada Haul Road to its original width and construct an accommodation camp at Old Karara. The proposal is further documented in schedule 1 of this statement.

Attachment 1 to Statement 811 - Mine detritals, expand Koolanooka South fold Cutback, increase the size of overburden stockpiles, and in-pit backfilling - change to proposal approved under s45C on 17 March 2010.

Attachment 2 to Statement 811 – Additional ore stockpile areas for Koolanooka Mine – change to proposal approved under s45C on 17 May 2011.

Attachment 3 to Statement 811 – Amendments to the Blue Hills component of the Koolanooka/Blue Hills DSO Mining Project to include expansion of the Mungada West and East pits, relocation of the processing facilities, relocation and expansion of waste stockpiles and ore stockpiles, relocate the access tracks and haul roads and reduction of clearing of the Mungada haul road between Koolanooka and Blue Hills – change to proposal approved under section 45C on 3 May 2013.


Status: Final
Release Date: 24 March 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 4.75 MB)

0810 - Keysbrook Mineral Sands Mine Shire of Serpentine-Jarrahdale and Shire of Murray
Summary:

To develop a mineral sands mine near the Keysbrook township. The proposal involves the excavation and processing of a low-grade heavy mineral sands deposit. The proposal is described further in schedule 1 of this document.

Attachment 1 to Statement 810 – Amendment to Condition 15 – change to proposal approved under s46C on 19 June 2011.

Attachment 2 to Statement 810 – Increase in proposal area to accommodate wet processing plant adjacent to the mining area, and change to area of vegetation to be protected – change to proposal approved under section 45C on 4 February 2013.


Status: Final
Release Date: 19 October 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.62 MB)

0809 - Wheelarra Hill Mine Modification Shire of East Pilbara
Summary: The proposal is for an increase in the mining rate from approximately 12 Mtpa to 45 Mtpa. The Wheelarra Hill Mine located approximately 40 km from Newman. The proposal includes clearing of an additional 580 ha of vegetation. The required water supply would increase from 3,750 kL per day to 11,800 kL per day. The proposal also involves the construction of a new rail spur and loop and Train Load-out facilities as well as the upgrading of existing 66 kV power line and installation of a second line.
Release Date: 7 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 349.96 KB)

0808 - Spotted Quoll open pit nickel mine, Shire of Kondinin
Summary: The proposal is to develop and operate an open pit nickel mine and associated infrastructure on Mining Lease 77/00583 and haulage road on Mining Lease 77/00545 within the Shire of Kondinin.
Status: Final
Release Date: 17 September 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 606.61 KB)

0807 - Western Turner Syncline, Section 10 Iron Ore Project, Shire of Ashburton
Summary:

To open-cut mine iron ore and link the mining operation to the existing Tom Price Mine process facilities with an infrastructure corridor. This corridor would contain an ore conveyor system, access roads, power, water and communications lines.

Attachment 1 to Statement 807 – Removal of Water Supply and Production Limits – change to proposal approved under section 45C on 10 December 2013.


Status: Final
Release Date: 17 September 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 966.67 KB)

0806 - Mungada Iron Ore Project, 220 kilometres east-southeast of Geraldton and 320 kms north-northeast of Perth, Shire of Perenjori.
Summary: The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia.

Attachment 1 to Statement 806 – Amendments to project disturbance footprint for additional haul roads and the realignment and widening of existing haul roads – change to proposal approved under s45C on 11 Mar 2011.
Status: Final
Release Date: 9 September 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 4.66 MB)

0805 - Karara Iron Ore Project 215 kilometres east-southeast of Geraldton and 320 kms north-northeast of Perth, Shire of Perenjori
Summary: The proposal is to construct and operate a magnetite iron ore mine, processing plant and associated infrastructure, Linear Infrastructure Corridor accommodating the raw water pipeline to the borefield near Mingenew and access road to Morawa, in the Midwest region of Western Australia.

Attachment 1 to Statement 805 - Relocation of the accommodation village, relocation of the airstrip, consolidation of mine infrastructure and removal of internal roads, a borrow pit and a water pipeline - change to proposal approved under s45C on 15 March 2010.

Attachment 2 to Statement 805 – Increase in disturbance area to allow for increased waste dump area, rail loop and airstrip clearing – change to proposal approved under section 45C on 21 June 2012.

Attachment 3 to Statement 805 – Additional clearing for construction of processing plant to facilitate the phased KIOP Expansion Project – change to proposal approved under section 45C on 20 February 2013.
Status: Final
Release Date: 8 September 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 7.52 MB)

0804 - Bluewaters Power Station - Phase II, Shire of Collie
Summary: The construction and operation of a sub-critical coal-fired base-load power generating facility with a nominal generating capacity of 200 megawatts adjacent to the Bluewaters I Power Station on a site located approximately four kilometres north-east of Collie, as documented in schedule 1 of Ministerial Statement 724.
Release Date: 27 August 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 10.4 KB)

0803 - Bluewaters Power Station, Shire of Collie
Summary: The construction and operation of a sub-critical coal-fired base-load power generating facility with a nominal generating capacity of 200 megawatts on a site located approximately four kilometres north-east of Collie, as documented in schedule 1 of Ministerial Statement 685.
Release Date: 27 August 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 10.34 KB)

0802 - Koolyanobbing Iron Ore Project, Windarling W2 Pit mining below the groundwater table, Windarling Range, Shire of Yilgarn
Summary: The proposal is for open-cut mining of iron ore (haematite) below the groundwater table at the currently mined W2 pit at Windarling, approximately 90 kilometres north-north-east of Koolyanobbing. The open-cut mine will require a depth increase of approximately 114 metres from nominally 402 metres Australian Height Datum (AHD) to 288 metres AHD. This will enable mining of an estimated six million tonnes of ore.

Attachment 1 to Statement 802 – Amendments to conditions 7-2, 7-5-2 and 7-5-3 – change to proposal approved under section 46C on 30 May 2012.
Status: Final
Release Date: 18 August 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 297.12 KB)

0801 - Fremantle Ports Inner Harbour and Channel deepening, reclamation at Rous Head and offshore placement of dredged material
Summary:

The proposal is to deepen the Fremantle Inner Harbour, Entrance Channel and the Deep Water Channel by dredging approximately 3.1 million cubic metres to provide for further reclamation at Rous Head of approximately 27 hectares and for offshore disposal.

Attachment 1 to Statement 801 – A change to the location of offshore placement of dredged material from Fremantle Ports Inner Harbour and Channel Deepening, and related works – change to proposal approved under s45C on 6 August 2010.

Attachment 2 to Statement 801 – Extension of dredging duration and removal of dredging timeframe indication – change to proposal approved under s45C on 24 March 2011.


Status: Final
Release Date: 18 August 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.18 MB)

0800 - Gorgon Gas development revised and expanded proposal: Barrow Island Nature Reserve
Summary:

The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island, as more generally described in the Draft Environmental Impact Statement / Environmental Review and Management Programme for the Proposed Gorgon Development, the Final Environmental Impact Statement/ Response to Submissions on the Environmental Review and Management Programme, as amended under Section 45C, and as expanded and revised in the Public Environmental Review for the Gorgon Gas Development Revised and Expanded Proposal and the Response to Submissions: Gorgon Gas Development Revised and Expanded Proposal, Public Environmental Review.

Attachment 1 to Statement 800 - Change to clarify that discharge of waste from marine vessels will be in accordance with MARPOL 73/78. Change to proposal approved under s45C on 23 February 2010.

Attachment 2 to Statement 800 - Change to development and usage of boil off gas flares and increase of seawater volume intake during the construction period. Change to proposal approved under s45C on 26 February 2010.

Attachment 3 to Statement 800 - Use of seawater for construction earthworks on the LNG treatment plant site. Change to proposal approved under s45C on 23 March 2010.

Attachment 4 to Statement 800 - Increase in construction duration and construction workforce – change to proposal approved under s45C on 29 April 2011.

Attachment 5 to Statement 800 – To modify the carbon dioxide (CO2) pipeline from an above ground installation to a buried installation - change to proposal approved under s45C on 2 June 2011.

Attachment 6 to Statement 800 – Amendment to Condition 17 - change to proposal approved under s46C on 31 May 2011.

Attachment 7 to Statement 800 – Amendment to condition 23A.3 ix – change to proposal approved under section 46C on 25 June 2013.

Attachment 8 to Statement 800 - Deletion of construction duration and construction workforce detailed in Attachment 4 and correction of clerical error in Attachment 5 – change to proposal approved under section 45C on 26 June 2013.


Status: Final
Release Date: 10 August 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 543.49 KB)

0799 - Tutunup South Mineral Sands Project
Summary:

The proposal is to mine the Tutunup South Mineral Sands Project located approximately 15 kilometres southeast of Busselton on Lots 2, 1827 and 1828 and part of Lots 441, 442, 1268, 1813, 1829 and part of Crown Reserve 22455, Hithergreen and part of State Forest 33 Yoganup. Mining is to extend approximately 15 metres below ground level and will require dewatering.

Attachment 1 to Statement 799 – Amendment to disturbance boundary to remove the deviation of Vasse Highway and correct errors with wetland mapping. Reduction in disturbance area by 1.4 ha and removal of various elements not considered environmentally relevant or managed under other legislation – change to proposal approved under section 45C on 27 May 2014.


Status: Final
Release Date: 7 August 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 4.84 MB)

0798 - Variation to existing Aquaculture Licence 1465 to increase production to 1000 tonnes per year production of barramundi in Cone Bay, Shire of Derby-West Kimberley
Summary: To produce 1,000 tonnes per annum of Barramundi in Cone Bay, 215 kilometres north-northeast of Broome, Shire of Derby-West Kimberley, with the use of eight nursery and 20 grow out sea cages.
Release Date: 10 August 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 321.55 KB)

0797 - Pardoo Iron Ore Mine and direct shipping from Port Hedland, Shire of East Pilbara and Town of Port Hedland
Summary: The proposal is to develop and operate a direct shipping iron ore project in the Pilbara, as allowed in Statement No. 775. The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes.
Release Date: 20 July 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 11.37 KB)

0796 - Class II landfill, Lot 7778 Diagram 209805, 1189 Wannamal Road South, Cullula, Shire of Gingin
Summary: To construct and operate a landfill accepting Class II-type waste. Six cells will be constructed with a total operational lifetime of not more than 30 years. A landfill gas collection system and utilisation plant facility will also be constructed.
Release Date: 11 June 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.25 MB)

0795 - Devil Creek Development Project, Gnoorea Point, Shire of Roebourne
Summary: The construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing.

Attachment 1 to Statement 795 � Discrete drilling and low level blasting of hard rock outcrops in a small portion of the onshore pipeline trench at various locations � change to proposal approved under s45C on 7 April 2010.
Release Date: 9 April 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.02 MB)

0794 - Balla Balla magnetite mining project, 10 kilometres north-west of Whim Creek, Shire of Roebourne
Release Date: 28 April 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 986.37 KB)

0793 - Extractive industry - Lot 242 Corio Road, Pinjarra
Release Date: 28 April 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 340.89 KB)

0792 - Southern Seawater Desalination Project, Lots 32 and 33, and part Lot 8 Taranto Road, Binningup, Shire of Harvey
Summary: The proposal is to construct and operate a minimum 50 GL/annum and up to100 GL/annum desalination plant on Lots 32 and 33, and Part Lot 8 Taranto Road, Binningup, marine inlet/outlet pipes, and a water supply pipeline to transport potable water to the Integrated Water Supply Scheme via a storage facility near Harvey.

Attachment 1 to Statement 792 � section 46C change to implementation conditions (to amend conditions 4 and 6-9) approved on 22 April 2009.

Attachment 2 to Statement 792 � section 46C change to implementation conditions (to amend condition 6-9) approved on 30 June 2010.
Release Date: 15 July 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.92 MB)

0791 - 40 Megawatt Biomass Power Plant - Forest Lease Manjimup
Release Date: 13 March 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 335.55 KB)

0790 - Cooljarloo Mine - Falcon extension approximately 10 kilometres north-west of Cataby, Shire of Dandaragan
Summary: The extension of open pit mining of mineral sands by dredging and dry mining adjacent to existing operations. Existing dry mining and processing practices, plant and equipment will be used. Approximately 3.1 million tonnes of ore will be extracted, slurried and processed by the dry mine concentrator to extract heavy mineral concentrate for transporting to the Chandala facilities.

Attachment 1 to Statement 790: Minor changes to the clearing footprint, change typographical error of ore extracted from 3.1 million tonnes to 7.4 million tonnes - s45C change to proposal approved on 5 August 2009.
Status: Final
Release Date: 7 August 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 10.03 MB)

0789 - Western extension to the Dardanup Mineral Sands Project to include the Burekup Mineral Sands Deposit
Summary: The proposal is to mine the Burekup Mineral Sands Deposit (as the Western Extension to the Dardanup Mine) located approximately 20 kilometres east of Bunbury. Mining is to extend below the water table to approximately 14 metres below ground level and will require dewatering.

Attachment 1 to Statement 789 - Change to the Burekup West mine disturbance footprint area - section 45C change to proposal approved on 7 July 2010.

Attachment 2 to Statement 789 - Change to the Burekup West Mine disturbance footprint area – change to proposal approved under s45C on 8 July 2011.
Status: Final
Release Date: 9 July 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.12 MB)

0788 - Utah Point Berth Project - Port Hedland
Release Date: 4 March 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 572.24 KB)