Ministerial Approval Statements

If the Minister for Environment determines that a proposal may be implemented, he/she issues a statement setting out the implementation decision and the conditions, if any, to which the implementation is subject. All Ministerial Approval Statements issued under s45(5) of the Environmental Protection Act 1986 are listed below with the most recent appearing first.

 Search all Ministerial Approval Statements

Go Search
  Displaying pages [ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20  ]
0865 - Gorgon Gas Development Revised and Expanded Proposal Barrow Island Nature Reserve
Summary: Amendments to Conditions of Statement 0800 - Gorgon Gas Development Revised and Expanded Proposal Barrow Island Nature Reserve
Status: Final
Release Date: 8 June 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 34.18 KB)

0864 – Roy Hill Infrastructure Railway, Shire of Ashburton, Shire of East Pilbara, Town of Port Hedland
Summary: Alteration of Conditions of Statement 847 – Roy Hill Infrastructure Railway, Shire of Ashburton, Shire of East Pilbara, Town of Port Hedland
Status: Final
Release Date: 2 June 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 8.38 KB)

0863 – Rockingham Industrial Zone Strategic Environmental Assessment (Formerly IP14)
Summary: The strategic proposal is to identify a development footprint for future industrial development over a 339 hectare area of the Rockingham Industrial Zone, while retaining an area as a conservation reserve.

Attachment 1 to Statement 863 – Add 4.36 hectares to the Rockingham Industrial Zone Strategic Proposal area – change to proposal approved under section 45C on 4 October 2013.
Status: Final
Release Date: 26 May 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 4.22 MB)

0862 - Solomon Iron Ore Project
Summary:

The proposal is to develop and operate two new mines at a greenfield site approximately 60 kilometres north of Tom Price, and to construct and operate a railway up to 130 kilometres in length from the mine site to the existing FMG railway.

Attachment 1 to Statement 862 – Change to Schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 13 December 2011.

Attachment 2 to Statement 862 – Up to 5 hectares of disturbance of the Priority Ecological Community 'Brockman Iron Crackling Clay Communities of the Hamersley Range'; Increase in peak dewatering rate to 25 gigalitres per annum; Changes to Schedule 1 to remove elements not environmentally relevant and to contemporise this Statement. – change to proposal approved under section 45C on 21 November 2013.


Status: Final
Release Date: 21 November 2013
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.98 MB)

0861 – Gidgegannup Granite Quarry, Gidgegannup, City of Swan
Summary: The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum.
Status: Final
Release Date: 13 April 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.48 MB)

0860 – Shire of Murray Town Planning Scheme No. 4 Amendment 104 (Point Grey)
Summary: Alteration of Conditions of Statement 519 – Shire of Murray Town Planning Scheme No. 4 Amendment 104 (Point Grey)
Status: Final
Release Date: 16 March 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 9.76 KB)

0859 – South West Creek Dredging and Reclamation Project
Summary:

The proposal involves the dredging of not more than 14.2 million cubic metres (Mm3) of material for eight new berth pockets, a turning circle and a link to the existing shipping channel. The proposal also involves the construction of two new land based dredge management areas (DMMAs). Dredged material will be disposed offshore at an existing disposal ground in Commonwealth waters and the new and existing DMMAs, as documented in schedule 1 of this statement.

Attachment 1 to Statement 859 – Relocation of DMMA G Discharge Point and Modification of Zone of Permanent Mangrove loss - change to proposal approved under s45C on 27 October 2011.

Attachment 2 to Statement 859 – Realignment of the access track between Utah Point Road and the dredging area, and associated changes to the zone of permanent mangrove loss – change to proposal approved under s45C on 2 May 2012.

Attachment 3 to Statement 859 – Change to conditions 6-1, 6-2, 6-3, 6-4, 6-5 & 6-6  – change to proposal approved under section 46C on 8 November 2013.


Status: Final
Release Date: 15 March 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 5.32 MB)

0858 – Roy Hill 1 Iron Ore Project, Port Infrastructure Port Hedland
Summary:

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland.

Attachment 1 to Statement 858 – Increase in terrestrial vegetation and ground disturbance area – change to proposal approved under section 45C on 17 December 2012.

Attachment 2 to Statement 858 – Disposal of dewatered groundwater, and addition of a pipeline development envelope – change to proposal approved under section 45C on 19 February 2014.

Attachment 3 to Statement 858 – Correction of an unintentional error in Attachment 2 - correction approved on 4 April 2014.


Status: Final
Release Date: 11 March 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.04 MB)

0857 – Jimblebar Iron Ore Project, 40 Kilometres East of Newman, Shire of East Pilbara
Summary: The proposal is to extend the existing Wheelarra Hill open pits, develop the South Jimblebar and Hashimoto deposits, and to increase the ore processing capacity by 30 million tonnes per annum (mtpa) to 75 mtpa. Open pit mining will occur above and below ground and will involve dewatering. Excess water will be discharged into the Ophthalmia Dam.
Status: Final
Release Date: 18 February 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 844.27 KB)

0856 – Busselton Regional Aerodrome
Summary: Amendment to Ministerial conditions to construct and operate a Regional Aerodrome at the Four Mile Hill site.
Status: Final
Release Date: 16 February 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 8.32 KB)

0855 – Marillana Iron Ore Project, Shire of East Pilbara
Summary: The proposal is to construct and operate a 750 Million tonnes (Mt) iron ore mine, processing facility and associated infrastructure using traditional open pit mining methods of excavating, load and haul approximately 100 km north west of Newman.
Status: Final
Release Date: 8 February 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 498.13 KB)

0854 – Hope Downs 4 Iron Ore Mine Shire of East Pilbara
Summary: The proposal is to construct and operate an iron ore mining area and associated infrastructure at the Hope Downs 4 Iron Ore Mine located approximately 30 kilometres north west of Newman within the Shire of East Pilbara The proposal consists of a designated mining area, two infrastructure corridor options, excess water discharge infrastructure and an accommodation area and the realignment of a 2.5 kilometre section of Coondiner Creek.

Attachment 1 to Statement 854 – Realignment of the infrastructure corridor and the Kalgan Creek excess water pipeline realignment, and re-development and relocation of two existing groundwater bores – change to proposal approved under s45C on 28 March 2012.

Attachment 2 to Statement 854 – Removal of Infrastructure Corridor Option 6, changes to Project Area – change to proposal approved under section 45C on 7 January 2013.

Attachment 3 to Statement 854 – Change to Project Area to expand the excess water discharge infrastructure corridor – change to proposal approved under section 45C on 17 September 2013.
Status: Final
Release Date: 1 February 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 11.97 MB)

0853 – Shire of Gingin Town Planning Scheme (TPS) No. 8 Amendment 93 - Lots 5243, 9504 and 9505 Perth-Lancelin Road, Lancelin
Summary: Shire of Gingin Town Planning Scheme (TPS) No. 8 Amendment 93 – rezone portions of Lots 5243, 9504 and 9505 Perth-Lancelin Road, Lancelin from ‘Rural’ to ‘Urban Development’ zone
Status: Final
Release Date: 31 January 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 213.07 KB)

0852 – Carina Iron Ore Mine, approximately 60 kilometres north east of Koolyanobbing, Shire of Yilgarn
Summary: The proposal is to construct and operate an iron ore mine in the Goldfields region of Western Australia. The proposal involves mining of hematite direct shipping ore (DSO) from a single open pit on the Yendilberin Hills, which form part of the Finnerty Range.

Attachment 1 to Statement 852 – Changes to clearing areas and project boundaries associated with the Rail Siding, Haul Road, and new Powerline Corridor – change to proposal approved under section 45C on 28 June 2012.

Attachment 2 to Statement 852 – Expansion of existing Carina Pit, waste dump – change to proposal approved under section 45C on 11 Oct 2013.

Attachment 3 to Statement 852 – Expansion of existing Carina pit, Waste dump – change to proposal approved under section 45C on 13 December 2013.
Status: Final
Release Date: 28 January 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 6.13 MB)

0851 – Bluewaters Power Station Expansion - Phase III And Phase IV Shire of Collie, Shire of Dardanup, Shire of Harvey
Summary: The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same alignment as the existing Collie A Power Station wastewater pipeline with a route deviation through the coastal foredune system, and an ocean outfall consisting of an approximately 650 metre long pipe including a 110 metre long diffuser located north of the Leschenault Inlet at Buffalo Road.
Status: Final
Release Date: 20 January 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 9.59 KB)

0850 – Pluto Liquefied Natural Gas Development (Site B Option) Burrup Peninsula, Shire of Roebourne
Summary: Amendment of Ministerial conditions for the construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility.
Status: Final
Release Date: 19 January 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 10.41 KB)

0849 – Warro Gas Field 3D Onshore Seismic Survey
Summary: The proposal is to conduct a 3D seismic survey within an area consisting of private land, the proposed Big Soak Plain Conservation Park and the Watheroo National Park approximately 60 kilometres east of Jurien Bay. The survey would involve the rolling of vegetation for vehicle access to the seismic lines.
Status: Final
Release Date: 10 January 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 519.62 KB)

0848 – Kwinana Export Facility, Kwinana
Summary: Amendment of Ministerial conditions for the construction and operation of a port facility. The facility will consist of three components:
  1. Marine component - a southern extension of the Bulk Cargo Jetty, an access jetty, an enclosed conveyor and a bulk material ship loader;
  2. Terrestrial component - an automated rail car dumper, an enclosed conveyor, a storage shed and other infrastructure; and
  3. Rail component - a rail line within the existing service corridor.
The rail and terrestrial components are located in the area bounded by Kwinana Beach Road, the Bulk Cargo Jetty access road, Wells Road and the shoreline at Kwinana Beach. The marine component is located in the ocean immediately south of the existing Bulk Cargo Jetty, as documented in schedule 1 of Statement 549.
Status: Final
Release Date: 3 December 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 16.48 KB)

0847 – Roy Hill Infrastructure Railway, Shire of Ashburton, Shire of East Pilbara, Town of Port Hedland
Summary:

The proposal is to construct and operate a railway of approximately 320 kilometres length and associated infrastructure to transport iron ore from the Roy Hill 1 Iron Ore Mining Project Stages 1 and 2 to facilities at Port Hedland.

Attachment 1 to Statement 847 – Change to rail corridor alignment – change to proposal approved under s45C on 20 May 2011.

Attachment 2 to Statement 847 – Addition of a lateral access road extending outside the environmental approval corridor, and ancillary access roads within the environmental approval corridor – change to proposal approved under section 45C on 10 May 2013.

Attachment 3 to Statement 847 – Increase in the area of construction disturbance from 6,000 to 7,400 hectares – change to proposal approved under section 45C on 28 November 2013.

Please also refer to Statement 864 for changed conditions.


Status: Final
Release Date: 29 November 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.92 MB)

0846 – Albany Port Expansion Project
Summary: The proposal is for the dredging of 12 million cubic metres of sediments to widen and deepen the existing shipping channel into Princess Royal Harbour and to extend the shipping channel into King George Sound to allow access of cape-size vessels to the Port. Dredged material will be disposed offshore at a location in King George Sound. A portion of the dredged material will be used for reclamation of up to 9 hectares of Princess Royal Harbour to construct a new berth (Berth 7).
Status: Final
Release Date: 18 November 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 613.87 KB)

0845 – Southern Source Integration Assets Pipeline Corridor (Report 1367)
Summary: Identification of potential corridors and areas for future installation of water and wastewater pipelines and associated infrastructure throughout the southern suburbs of Perth.
Status: Final
Release Date: 4 November 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 164.17 KB)

0844 - Macedon Gas Development, Shire of Ashburton
Summary: The proposal is to construct and operate a subsea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline.

Attachment 1 to Statement 844 – Offshore pipeline realignment and change to water supply – change to proposal approved under section 45C on 17 January 2012.
Status: Final
Release Date: 28 October 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.8 MB)

0843 - Koolyanobbing Iron Ore Project - Mt Jackson J1 Deposit, Shire of Yilgarn.
Summary: The proposal is to develop and operate the Koolyanobbing Iron Ore Project-Mt Jackson J1 Deposit open pit iron ore mine and associated infrastructure on leases M77/993, M77/994, M77/1248, M77/1249 and haulage road on Lease L77/216 in the Shire of Yilgarn.
Status: Final
Release Date: 28 October 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 516.59 KB)

0842 - Collie Urea Project, Shotts Industrial Park, Shire of Collie and Port of Bunbury
Summary: The proposal is for the construction and operation of a urea production plant within the proposed Shotts Industrial Park, located about 7.5 kilometres east of Collie. The plant will produce a nominal 2.1 million tonnes per annum of urea, which will be transported by rail to the Port of Bunbury for export.
Status: Final
Release Date: 18 October 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.46 MB)

0841 - Industrial Subdivision of Lot 21 Webster Road, Forrestfield Shire of Kalamunda
Summary: The subdivision of Lot 21 Webster Road, Forrestfield, into seven (7) industrial lots.
Status: Final
Release Date: 30 September 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 186.84 KB)

0840 - Cape Lambert Port B Development - Shire of Roebourne
Summary: The proposal is to construct and operate a second port (Port B) at Cape Lambert to process and export up to 130 million tonnes of ore per annum.

Attachment 1 to Statement 840 – Change to the Tug Harbour Extension dredging footprint area (i.e. updated Table 4 and Figures 2, 4b and 4c) – change to proposal approved under s45C on 12 May 2011.

Attachment 2 to Statement 840 - The proponent shall ensure that the implementation of the proposal does not cause a direct loss of Benthic Primary Producer Habitat in excess of 1.4 hectares. Interim Implementation Condition 8-1 approved under s46A on 19 May 2011.

Note: A change to condition 8-1 of Ministerial Statement 840 was approved by the Minister for Environment on 31 October 2011 in Statement 876. Download Ministerial Statement 876 with the new condition.

Attachment 3 to Statement 840 – Additional dredging – increase in “large dredge area” and “tug harbour dredge area” (replaced Figure 5, Table 4 and Key Characteristics Table – change to proposal approved under s45C on 22 December 2011.

Attachment 4 to Statement 840 – Additional clearing – additional 46 ha of terrestrial clearing. Inclusion of figure 7 depicting Terrestrial Component of the Proposed Footprint – change to proposal approved under s45C on 28 March 2012.
Status: Final
Release Date: 30 September 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 5.29 MB)

0839 - Tropicana Gold Project, Shire of Menzies, Shire of Laverton and the City of Kalgoorlie - Boulder
Summary:

The proposal is the construction and operation of an open-cut gold mine and associated infrastructure, located approximately 330 km east northeast of Kalgoorlie and 200 km east of Laverton.

Attachment 1 to Statement 839 – Implement a single cell tailings storage facility – change to proposal approved under section 45C on 19 November 2012.


Status: Final
Release Date: 24 September 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 233.45 KB)

0838 – Coolimba Power Station Project - Shire of Carnamah and Shire of Coorow
Summary: The proposal is for the construction and operation of a power station comprising of a nominal 450 MW coal-fired base-load generation plant and a nominal 358 MW natural gas-fired peaking-load generation plant on a site located approximately 15 km south-south-west of Eneabba. The proposal also involves the establishment of an approximately 20 km long and 100 m wide infrastructure corridor that will accommodate the construction and operation of a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline or the Parmelia Gas Pipeline, and a 330 kV electricity transmission line to connect the power station to the external electricity network at the proposed Eneabba Substation.
Status: Final
Release Date: 17 September 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 365.32 KB)

0837 – Bluewaters Power Station Expansion - Phase III and Phase IV Shire of Collie, Shire of Dardanup, Shire of Harvey
Summary:

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same alignment as the existing Collie A Power Station wastewater pipeline with a route deviation through the coastal foredune system, and an ocean outfall consisting of an approximately 650 metre long pipe including a 110 metre long diffuser located north of the Leschenault Inlet at Buffalo Road.

Note: Condition 6-1 of this Ministerial Statement has been deleted. See Statement 851.

Attachment 1 to Statement 837 – Figure 5 of Statement 837 is replaced and superseded by Figure 6 – change to proposal approved under s45C on 18 Apr 2012.


Status: Final
Release Date: 17 September 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 3.47 MB)

0836 – Shire of Harvey Local Planning Scheme No. 1 Amendment No. 63 - Lots 195, 304 and Part Lot 9003 Lakes Parade, Binningup - Rezoning from Residential, General Farming and Recreation to Residential Development and Recreation
Summary: Amendment No. 63 to the Shire of Harvey Local Planning Scheme No.1 to rezone Lots 195, 304 and Part Lot 9003 Lakes Parade, Binningup from Residential, General Farming and Recreation to Residential Development and Recreation.
Status: Final
Release Date: 17 September 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 87.5 KB)

0835 - Development and Conservation Proposal - Lot 4 Underwood Avenue, Shenton Park
Summary: The proposal area is approximately 33.4 hectares of Lot 4 Underwood Ave in Shenton Park. Within this area the University intends to establish a conservation area (13.9 hectares), Public Open Space (2 hectares) and a development area (17.5 hectares). The development area includes approximately 13 hectares to be developed for residential purposes with the remainder of the area for �University purposes - future use and development�, as it is affected by odour from the Subiaco Wastewater Treatment Plant. This area will remain vegetated pending the clarification of the development and land use potentials of this land with relevant planning authorities in accordance with Local Planning Scheme requirements.
Release Date: 14 July 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 273.62 KB)

0834 - Orebody 24/25 Upgrade Project
Summary: BHP Billiton Iron Ore is proposing to develop the Orebody 24 (OB24) deposit located north of Orebody 25 (OB25) Mine, and approximately 10 km north-east of the town of Newman in the Pilbara Region. New and existing OB25 infrastructure would be utilised.

Attachment 1 to Statement 834 – The disturbance area and ore processing rate are changed to enable a rail spur, train load-out facility, and on-site ore handling plant (approved in the original proposal) to be constructed and used at the Orebody 24 Mine. – change to proposal approved under s45C on 16 November 2011.
Status: Final
Release Date: 8 July 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 515.51 KB)

0833 - Marandoo Mine Phase 2, Shire of Ashburton
Summary:

The expansion of existing mining operations at Marandoo by mining below the water table, including expansion of the existing mine pit and development of new waste dumps.

Attachment 1 to Statement 833 – Amendments to conditions 4-6, 8-2, 8-3, 8-8, 8-9 and 8-10  – change to proposal approved under section 46C on 9 May 2013.


Status: Final
Release Date: 8 July 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 370.81 KB)

0832 - Perth Metropolitan Desalination Proposal - Water Quality Management, Change to Implementation Conditions Section 46
Summary: The construction and operation of a seawater desalination plant at a site in the Kwinana / East Rockingham area, and associated seawater intake, concentrated seawater discharge pipelines, and product pipeline to Tamworth Hill or Thomson�s Reservoir.Upgrading of the capacity of the plant to 45 Gigalitres per year at the Kwinana site will include increasing the production of potable water, use of seawater, and discharge of concentrated seawater and further options for combining intake seawater with cooling water discharged from Western Power�s Kwinana Power Station, as documented in schedule 1 of this statement.
Release Date: 28 June 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 16.45 KB)

0831 - Smiths Beach Development, Sussex Loc 413, Yallingup
Summary: The strategic proposal is to:
a)extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413, and
b) develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan.
Release Date: 15 June 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.11 MB)

0830 - Ord River Irrigation Area Stage 2 M2 Supply Channel, Kununurra
Summary: The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains, as documented in schedule 1 of this statement.
Release Date: 7 May 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.09 MB)

0829 - Roy Hill 1 Iron Ore Mining Project Stage 2, 110 kilometres north of Newman, Shire of East Pilbara
Summary: The proposal is to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline.

Attachment 1 to Statement 829 – Change to mining schedule, location of key infrastructure, groundwater drawdown figure and coordinates (this attachment replaces Figure 2, Figure 3 and Figure 5 of Schedule 1) – change to proposal approved under section 45C on 3 February 2012.
Status: Final
Release Date: 31 March 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1005.45 KB)

0828 - Austral Bricks Previously Prestige Brick Brickworks at Midland
Summary: The construction and operation of a brick making facility on Lot 1 on Plan 16497 Military Road, Bellevue, as documented in schedule 1 of the statement.
Status: Final
Release Date: 23 March 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 720.32 KB)

0827 - Balmoral South Iron Ore Project, Cape Preston, Shire of Roebourne
Summary: Amendment of conditions applying to the construction and operation of 80 million tonne per annum iron ore mine, power station, desalination plant, processing plant, pellet plants and accommodation in the Southern Block orebody of the Cape Preston area.
Release Date: 23 March 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 12.75 KB)

0826 - Port Rockingham Marina
Summary: The proposal is to construct and operate a new marina facility located at the intersection of Wanliss Street and Rockingham Beach Road, Rockingham, within Cockburn Sound.
Release Date: 18 February 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.4 MB)

0825 - Busselton Regional Aerodrome
Summary: Amendment of Ministerial conditions to operate the Busselton Regional Aerodrome at the Four Mile Hill site.
Release Date: 11 February 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 7.85 KB)

0824 - Roy Hill 1 Iron Ore Mining Project Stage 1, 110 Kilometres North of Newman, Shire of East Pilbara
Summary: The proposal is to mine iron ore from the Stage 1 project area on the southern slopes of the Chichester Range and develop associated mining infrastructure.

Attachment 1 to Statement 824 – Revision of the approved realignment of Marble Bar Road – change to proposal approved under s45C on 15 December 2010.

Attachment 2 to Statement 824 – Change to mining schedule, location of key infrastructure, groundwater drawdown figure and coordinates (this attachment replaces Figure 2, Figure 3, Figure 4 and Figure 5 of Schedule 1, and the table of GIS coordinates in Schedule 2) – change to proposal approved under section 45C on 3 February 2012.
Status: Final
Release Date: 23 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.02 MB)

0823 - Balmoral South Iron Ore Project, Cape Preston, Shire of Roebourne
Summary: The construction and operation of 80 million tonne per annum iron ore mine, power station, desalination plant, processing plant, pellet plants and accommodation in the Southern Block orebody of the Cape Preston area.
Release Date: 23 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 810 KB)

0822 - Iron Ore Mine, Downstream Processing Direct - Reduced Hot Briquetted Iron and Port Construction, Cape Preston, Pilbara
Summary: The construction and operation of a 44.8 million tonnes per annum iron ore mine, power station, desalination plant, processing plant and accommodation and port facilities in the Cape Preston area as documented in Schedule 1 of Statement 635. The processing plant will produce pelletised, direct-reduced iron and hot-briquetted iron.
Release Date: 23 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 15.87 KB)

0820 - Shire of Waroona Town Planning Scheme No. 7 Amendment No. 4 - Rural 6 "Rural Residential" Zone, Lot 3 Southern Estuary Road, Lake Clifton
Summary: (a) rezoning Lot 3 Pt. Wellington Location 2942 Southern Estuary Road, Lake Clifton from "Rural 1 General Farming" to "Rural 6 - Rural-Residential", and (b) incorporating into Schedule 2 of the Scheme Text Policies and provisions relating to development on Lot 3 Location 2942, Southern Estuary Road.
Status: Final
Release Date: 23 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.74 MB)

0819 - Gnangara Mound Groundwater Resources including groundwater resource allocation, East Gnangara, City of Swan
Summary: The management and abstraction of groundwater for public and private water supply from the Gnangara Mound, with provision for environmental water requirements, as documented in this statement.
Release Date: 4 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 87.79 KB)

0818 - Chichester Rail Deviation, Shire of Ashburton
Summary: BHP Billiton Iron Ore is proposing to construct 23 kilometres of dual track railway and associated rail infrastructure within the Chichester ranges, approximately 220 kilometres south of Port Hedland. The proposal includes clearing of 400 hectares of vegetation. The required water supply would be approximately 1000 kL/day to be sourced from two existing bores. The proposal also involves the construction of communications cabling, a communications tower, level crossings, signalling, access tracks, and borrow pits.

Attachment 1 to Statement 818 � Increased groundwater requirements and revised culvert numbers and locations � change to proposal approved under s45C on 13 April 2010.
Release Date: 13 April 2010
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 259.23 KB)

0817 - Industrial Subdivision of lots 300-303 and 9001 Beringarra Avenue, Malaga, City of Swan
Summary: The proposal involves the subdivision of Lots 300-303 and 9001 Beringarra Avenue into 67 industrial lots.
Release Date: 25 November 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 295.5 KB)

0816 - Albany Iron Ore Project - Southdown Magnetite Proposal mine, ore slurry and water pipelines, and port loading facilities 90 kilometres east-north-east of Albany
Summary: The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany.

Attachment 1 to Statement 816 – Increase in production rate and pit depth, relocation of infrastructure, and changes to pipeline alignment – change to proposal approved under s45C on 27 June 2011.

Attachment 2 to Statement 816 – Section 45C change to waste dump footprint – change to proposal approved under s45C on 22 November 2011.
Status: Final
Release Date: 7 December 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.6 MB)

0815 - Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley
Summary: The construction of a deepwater port at either the "north", "central", or "south" location, as allowed in Statement No. 469.

Attachment 1 to Statement 815 – Deletion of introductory clause and insertion of correct standard introductory clause – change to proposal approved under section 46C on 12 August 2011.
Status: Final
Release Date: 25 November 2009
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 33.78 KB)