Ministerial Approval Statements

If the Minister for Environment determines that a proposal may be implemented, he/she issues a statement setting out the implementation decision and the conditions, if any, to which the implementation is subject. All Ministerial Approval Statements issued under s45(5) of the Environmental Protection Act 1986 are listed below with the most recent appearing first.

 Search all Ministerial Approval Statements

Go Search
  Displaying pages [ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20  ]
0915 – Ferraus Pilbara Project
Summary: The proposal is to expand the FerrAus Pilbara Project to include below the water table mining at the Robertson Range Area and to develop additional mine pits at the Davidson Creek Area, located in the East Pilbara region of Western Australia.

Attachment 1 to Statement 915 – changes to conditions 10-6, 10-8 to 10-11 and 11 – change to proposal approved under section 46C on 31 December 2013.
Status: Final
Release Date: 1 November 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 504.04 KB)

0914 - Yandicoogina Iron Ore Project – Expansion to Include Junction South West and Oxbow Deposits
Summary: The proposal is to for the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The proposal is located in the central Pilbara region of Western Australia, on mining lease 274SA.
Status: Final
Release Date: 18 October 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.31 MB)

0913 – Wiluna Uranium Mine, 30 km South and 15 km South-East of Wiluna Shire of Wiluna
Summary: The proposal is to construct and operate a uranium mine consisting of two deposits Centipede and Lake Way at mining tenements M53/224 and MLA53/1090, located approximately 30 kilometres south and 15 kilometres south-east of Wiluna
Status: Final
Release Date: 10 October 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 934.96 KB)

0912 – Red Hill Quarry Development, Gidgegannup, City of Swan
Summary: The proposal is to extend the existing Red Hill Quarry to the west (West Quarry Pit Extension Area A) and north-west (West Quarry Pit Extension Area B) of the current pit, and extend the existing stockpile and dispatch area, and install a quaternary crusher.
Status: Final
Release Date: 9 October 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 728.77 KB)

0911 – Barrambie Vanadium Project Shires of Meekatharra and Sandstone
Summary: The proposal is to develop an open-cut vanadium mine and process plant at Barrambie, 75 kilometres north-west of the Sandstone townsite and 116 kilometres south-east of Meekatharra.
Status: Final
Release Date: 4 October 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 229.29 KB)

0910 – Wastewater Treatment Plant, Augusta
Summary: Amendment of conditions of Ministerial Statement 0126 – Wastewater Treatment Plant, Augusta
Status: Final
Release Date: 4 October 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 21.95 KB)

0909 – Yilgarn Operations Windarling Range W4 East Deposit
Summary:

The proposal is to construct and operate an open cut iron ore mine and haul road at the Windarling Range W4 East Deposit, located approximately 130 kilometres north of Southern Cross.

Attachment 1 to Statement 909 – Extension to the area of the W4 East Deposit Haul Road and revision of proposal description – change to proposal approved under section 45C on 20 November 2013.


Status: Final
Release Date: 2 October 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.43 MB)

0908 – Weld Range Iron Ore Project, 85 Kilometres South West Of Meekatharra And 60 Kilometres North West Of Cue In The Midwest Region Of Western Australia
Summary:

The proposal is to construct and operate an iron ore mine and associated infrastructure at Weld Range. Open pit mining would occur above and below the water table and would involve dewatering. Excess water would be discharged to a lined evaporation pond.

Attachment 1 to Statement 908 – Changes to implementation conditions 4-6, 6-6, 7-2, 7-4, 9-2 and 10-2 – change to proposal approved under section 46C on 12 March 2014.


Status: Final
Release Date: 29 August 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 310.68 KB)

0907 – Windarling Range W3/5 Deposit Deepening Shire of Yilgarn
Summary: The proposal is situated on Mining Leases M77/999 and M77/1000, approximately 130 kilometres north of Southern Cross in the Shire of Yilgarn (Figure 1).  The proposal is to mine iron ore by open cut mining below the groundwater table in the portion of the W3/5 Deposit at Windarling Range as shown in Figure 2 and defined in schedule 2.  The depth of the open-cut mine will increase from nominally 400 metres Australian Height Datum (AHD) to nominally 315 metres AHD.
Status: Final
Release Date: 21 August 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 313.22 KB)

0906 - Point Grey Marina
Summary: The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel.
Status: Final
Release Date: 1 August 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 4.49 MB)

0905 – Magellan Lead Carbonate Project, Wiluna
Summary:

This Statement replaces and supersedes all previous conditions and procedures of Statement 559, Statement 783, and the Interim Implementation Conditions (Published on 23 February 2011) Magellan Lead Carbonate Project, Wiluna.

Attachment 1 to Statement 905 – Replacement of Schedule 1 – change to proposal approved under section 45C on 19 December 2013.

Attachment 2 to Statement 905 – Replacement of Schedule 2 – change to proposal approved under section 45C on 19 December 2013.


Status: Final
Release Date: 27 July 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 12.56 MB)

0904 - Cape Riche Seawater Desalination Plant
Summary: The proposal is to construct and operate a 12GL/annum seawater desalination plant in order to supply water to Grange Resource’s Southdown Magnetite operations.
Status: Final
Release Date: 19 July 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 701.45 KB)

0903 – Wheatstone Development – Gas Processing, Export Facilities and Infrastructure, Shire of Ashburton and Roebourne
Summary: Amendment of conditions of Ministerial Statement 0873 – Wheatstone Development – Gas Processing, Export Facilities and Infrastructure. Shire of Ashburton and Roebourne
Status: Final
Release Date: 6 July 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 132.56 KB)

0902 – Roy Hill 1 Iron Ore Mining Project Stage 1, 110 Kilometres North of Newman, Shire of East Pilbara
Summary: Amendment of conditions of Ministerial Statement 0824 Roy Hill 1 Iron Ore Mining Project Stage 1, 110 Kilometres North of Newman, Shire of East Pilbara
Status: Final
Release Date: 6 July 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 82.41 KB)

0901 – Busselton Regional Aerodrome City of Busselton
Summary: Replacement of all previous conditions and procedures in Ministerial Statements 399, 825, 856, 878, and 887 Busselton Regional Aerodrome
Status: Final
Release Date: 22 June 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.23 MB)

0900 – Yilgarn Operations Deception Deposit
Summary:

The proposal is to construct and operate an open cut iron ore mine, waste rock landform, ore stockpile, haul road and associated infrastructure, 150 kilometres north of Southern Cross.

Attachment 1 to Statement 900 – Realignment of the Deception Deposit Haul Road and the siting of the Deception Deposit Waste Rock Landform – change to proposal approved under section 45C on 19 November 2012.

Attachment 2 to Statement 900 – Realignment of Haul Road, co-location of support infrastructure to Ore Stockpile areas – change to proposal approved under section 45C on 5 November 2013.


Status: Final
Release Date: 18 June 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 4.25 MB)

0899 – Cloudbreak Life of Mine, Pilbara
Summary:

The proposal includes the existing Cloudbreak iron ore mine and proposed expansion.  The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing.  The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility.

Attachment 1 to Statement 899 – Change to Table 1 in Schedule 1 for increase in reinjection requirements and integration of groundwater management between Christmas Creek and Cloudbreak mines – change to proposal approved under section 45C on 20 December 2013.


Status: Final
Release Date: 5 June 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.43 MB)

0898 – Expansion to Limestone Quarry on Mining Lease 08/06 Sub Lease 3h/034, 8 Kilometres South West of Exmouth
Summary: To excavate limestone, screen the material on-site, re-establish an access road and rehabilitate all of the disturbed areas.
Status: Final
Release Date: 30 May 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.18 MB)

0897 – Wagerup Alumina Refinery - Production to a Maximum Capacity of 4.7 Million Tonnes Per Annum and Associated Bauxite Mining
Summary: Amendment of conditions of Ministerial Statement 0728 – Wagerup Alumina Refinery - Production to a Maximum Capacity of 4.7 Million Tonnes Per Annum and Associated Bauxite Mining
Status: Final
Release Date: 9 May 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 9.55 KB)

0896 – Mungada Iron Ore Project, 220 Kilometres East-Southeast of Geraldton and 320 Kilometres North-Northeast of Perth, Shire of Perenjori
Summary: Amendment of conditions of Ministerial Statement 0806 Mungada Iron Ore Project, 220 kilometres east-southeast of Geraldton and 320 kms north-northeast of Perth, Shire of Perenjori.
Status: Final
Release Date: 4 May 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 7.73 KB)

0895 – Karara Iron Ore Project, 215 Kilometres East-Southeast of Geraldton and 320 Kilometres North-Northeast of Perth,Shire of Perenjori
Summary: Amendment of conditions of Ministerial Statement 0805 Karara Iron Ore Project 215 kilometres east-southeast of Geraldton and 320 kms north-northeast of Perth, Shire of Perejori
Status: Final
Release Date: 4 May 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 7.78 KB)

0894 – Residential Subdivision on Lots 3000 (Formerly Lot 1512) and 1523 Emu Point Drive, Albany
Summary:

The proposal is for the residential subdivision of Lots 3000 (formerly Lot 1512) and 1523 Emu Point Drive in Albany. 

Attachment 1 to Statement 894 – Increase in clearing of native vegetation, change to development footprint boundary – change to proposal approved under section 45C 10 July 2013.


Status: Final
Release Date: 30 April 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 886.79 KB)

0893 – Hope Downs Iron Ore Mine, 75 Km North-West of Newman Pilbara Region
Summary: Amendment of conditions of Ministerial Statement 0584 Hope Downs Iron Ore Mine, 75km North-West of Newman, Pilbara Region

Status: Final
Release Date: 12 April 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 10.93 KB)

0892 – Parker Range (Mount Caudan) Iron Ore Project Shire of Yilgarn
Summary: The proposal is to develop and operate the Parker Range (Mount Caudan) Iron Ore Project located approximately 15 kilometres south-east of Marvel Loch in the Shire of Yilgarn. The proposal consists of a mining area and haul road area.  The mining area includes an above and below the watertable iron ore mine, associated infrastructure and the Parker Range Bypass Road.
Status: Final
Release Date: 12 April 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 867.65 KB)

0891 – Multi-User Iron Ore Export (Landside) Facility Port Hedland
Summary: The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland.
Status: Final
Release Date: 2 April 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 715.4 KB)

0890 – Outer Harbour Development – Port Hedland BHP Billiton Iron Ore (BHPBIO)
Summary:

The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations.

The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf.


Status: Final
Release Date: 28 February 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 905.42 KB)

0889 – Mt Gibson Iron Ore Mine & Infrastructure Project Shire of Yalgoo
Summary: Amendment of conditions of Ministerial Statement 0753 Mt Gibson Iron Ore Mine & Infrastructure Project Shire of Yalgoo
Status: Final
Release Date: 28 February 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 15.11 KB)

0888 – Expansion of Jurien Gypsum Mining Operation ML70/1161, Shire of Dandaragan
Summary: Amendment of conditions of Ministerial Statement 0730 Expansion of Jurien Gypsum Mining Operation ML70/1161, Shire of Dandaragan
Status: Final
Release Date: 13 February 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 47.18 KB)

0887 – Busselton Regional Aerodrome
Summary: Amendment of conditions of Ministerial Statement 0399 Busselton Regional Aerodrome.
Status: Final
Release Date: 7 February 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 8.07 KB)

0886 – Jack Hills Expansion Project – Shires of Meekatharra, Murchison, Cue and Shark Bay
Summary:

To expand the Jack Hills Iron Ore Project, 120 kilometres northwest of Meekatharra and approximately 400 kilometres northeast of Geraldton. 

The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries.  The Jack Hills Expansion Project is contiguous with the Stage 1 mine.


Status: Final
Release Date: 9 January 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 461.77 KB)

0885 – Transitional Development of Cone Bay Marine Tropical Finfish Aquaculture Venture, Aquaculture Licence 1465
Summary: The proposal is to operate a 2000 tonnes per annum barramundi sea cage aquaculture farm in Cone Bay which is located in the Buccaneer Archipelago and forms part of the Yampi Sound in the Kimberley region of Western Australia. 
Status: Final
Release Date: 5 January 2012
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 215.91 KB)

0884 – Coastal Walk Trail from Point Ann to Hamersley Inlet - Fitzgerald River National Park
Summary:

The proposal is to construct and operate a walk trail along the coast from Point Ann to Hamersley Inlet within Fitzgerald River National Park.

Attachment 1 to Statement 884 – Two walk trails: an Eastern walk trail from Quoin Head to Cave Point including a spur trail to Hamersley Inlet; and a Western trail from Point Ann to Fitzgerald Inlet with shorter walk option at Lake Nameless; reduction and relocation of overnight camping, and amendment to Wilderness Management Zone Boundary – change to proposal approved under section 45C on 28 August 2012.


Status: Final
Release Date: 22 December 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 578.01 KB)

0883 – Hamersley Agriculture Project
Summary: The proposal involves utilising mine dewatering, surplus to other Marandoo Mine Phase 2 requirements, for irrigated agriculture. The Project area is located approximately 6 km to the west of Marandoo Mine. The Project area is approximately 2800 hectares of which a maximum of 1815 hectares is to be disturbed. This includes 1650 hectares of direct impact and 165 hectares of indirect impact.

Status: Final
Release Date: 5 December 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 836.83 KB)

0882 – Spotted Quoll Open Pit Nickel Mine, Shire of Kondinin
Summary: Amendment of conditions of Ministerial Statement 0808  - Spotted Quoll Open Pit Nickel  Mine, Shire Of Kondinin
Status: Final
Release Date: 2 December 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 10.63 KB)

0881 – West Pilbara Iron Ore Project Stage 1 – Mine and Rail, Shire of Ashburton and Shire of Roebourne
Summary: The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica.  A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha.  The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore.
Status: Final
Release Date: 30 November 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.2 MB)

0880 – Cape Lambert to Emu Siding Rail Duplication
Summary: The proposal is to construct and operate a rail line and associated infrastructure adjacent to the existing rail line from Cape Lambert to Emu Siding.

Attachment 1 to Statement 880 – Realignment of the originally proposed rail duplication – change to proposal approved under section 45C on 19 June 2012.
Status: Final
Release Date: 18 November 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.7 MB)

0879 - Gold mine developments on Lake Lefroy
Summary:

The proposal is to expand existing open-cut and underground gold mining developments within a defined project area on the surface of Lake Lefroy, approximately 20 kilometres south east of Kambalda. The proposal includes the discharge of dewatering to the lake’s surface and the construction of associated mining infrastructure (including open pits and waste rock dumps).

Attachment 1 – Increase of 348 hectares to the area of disturbance – change to proposal approved under section 45C on 26 March 2014.


Status: Final
Release Date: 16 November 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.5 MB)

0878 - Busselton Regional Aerodrome
Summary: Refer to Ministerial Statement 399.
Status: Final
Release Date: 16 November 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 47.37 KB)

0877 – Town of Port Hedland Town Planning Scheme No. 5 Amendment No. 22 (Rezone Residential Land in the West End of Port Hedland)
Summary: To rezone currently zoned residential land in the West End of Port Hedland to “West End Residential” and “Town Centre".
Status: Final
Release Date: 2 November 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 10.56 KB)

0876 – Cape Lambert Port B Development – Shire of Roebourne
Summary:  Amendment of Conditions of Cape Lambert Port B Development – Shire of Roebourne
Status: Final
Release Date: 1 November 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 7.52 KB)

0875 – Ammonium Nitrate Production Expansion Project: Phase 2, Kwinana Town of Kwinana
Summary: CSBP Limited proposes to expand its Kwinana Ammonium Nitrate Production Facility located within the CSBP Kwinana Industrial Complex approximately 40 kilometres south of Perth by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tonnes per annum to 936,000 tonnes per annum.

Attachment 1 to Statement 875 – Removal of "Greenhouse gas emissions" – change to proposal approved under section 45C on 3 January 2013.
Status: Final
Release Date: 6 October 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 427.66 KB)

0874 - Koolyanobbing Iron Ore Expansion, Windarling Range and Mt Jackson, Shire of Yilgarn
Summary: Amendment of Conditions of Statement 0627 - Koolyanobbing Iron Ore Expansion Windarling Range and Mt Jackson Shire of Yilgarn
Status: Final
Release Date: 13 September 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 10.42 KB)

0873 – Wheatstone Development – Gas Processing, Export Facilities and Infrastructure. Shire of Ashburton and Roebourne
Summary: The Proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow.

Attachment 1 to Statement 873 – An amendment to the turning basin identified in Figure 6 of Schedule 1 – change to proposal approved under section 45C on 14 Jan 2013.

Attachment 2 to Statement 873 – An amendment to delete reference to utilities, discharges and capacity limits detailed in Schedule 1 – change to proposal approved under section 45C on 28 February 2013.

Attachment 3 to Statement 873 – Inclusion of offshore Sand Borrow Area for trunkline installation – change to proposal approved under section 45C on 18 March 2013.

Attachment 4 to Statement 873 – Amendment to coordinates of Overflow Control Zones – change to proposal approved under section 45C on 18 March 2013.
Status: Final
Release Date: 30 August 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 3.06 MB)

0872 – Voyager Quarry Lots 11 & 14 Horton Road, The Lakes Avon Location 1881 Shire of Northam
Summary: Amendment of Conditions of Statement 706 – Voyager Quarry Lots 11 & 14 Horton Road, The Lakes Avon Location 1881 Shire of Northam
Status: Final
Release Date: 8 August 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 8.1 KB)

0871 – Christmas Creek Water Management Scheme
Summary: The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine.
Status: Final
Release Date: 1 August 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 223.91 KB)

0870 - Technical ammonium nitrate production facility, Burrup Peninsula, Shire of Roebourne
Summary: The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha.

Attachment 1 to Statement 870 – Removal of 'Wastewater' from the key proposal characteristics table – change to proposal approved under section 45C on 9 July 2013.
Status: Final
Release Date: 11 July 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.04 MB)

0869 - Coyote Gold Mine, Stage 2, approximately 280 kilometres south-east of Halls Creek, Tanami Desert, Shire of Halls Creek
Summary:

This statement relates to Ministerial Statement 749 and replaces Condition 5-4 as follows:

Condition 5-4 of Ministerial Statement 749 is deleted and replaced with:

“5-4 The proponent shall impose speed limits of 80 kilometres per hour for all vehicles on the haul road, or at lesser speeds as required to ensure effective project safety.”


Status: Final
Release Date: 11 July 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 39.78 KB)

0868 - Dampier Marine Services Facility
Summary: The proposal involves dredging of not more than 2.2 million cubic metres of material which will be used to reclaim a 22 hectare area and create a new land-backed wharf. A new jetty will extend approximately 300 metres from the land-backed wharf. The proposal will also require disturbance of approximately 5 hectares of land for a lay down area and an access road.
Status: Final
Release Date: 30 June 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 3.4 MB)

0867 – Brockman 2 Detrital Iron Ore Mine Extension Phase 2B
Summary: The proposal is to amalgamate parts of Pit 4 Extension, Lower Pit 4, Valley Pit and Pit 6 to approximately 530 metres Reduced Level (mRL) to form the BS2 Pit.  Further dewatering of the orebody aquifer to 520 mRL is required to mine to a depth of 530 mRL.

Attachment 1 to Statement 867 – Removal of reference to "Project life", "Total Production", and "Dewatering volume"– change to proposal approved under section 45C on 11 September 2013.
Status: Final
Release Date: 20 June 2011
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 420.94 KB)

0866 – Western Australian Planning Commission Peel Region Scheme Amendment 017/57
Summary: Rezoning of Lot 123 Tonkin Drive, Lot 185 North Yunderup Road, Lots 205 and 300 Towera Road and Lot 544 Pinjarra Road, and portion of Towera Road, North Yunderup from Rural to Urban; and rezoning of Lots 19-23 Pinjarra Road, Lot 120 North Yunderup Road, Lots 122-127 Tonkin Drive, Lots 128-130 Walter Road, Reserve 35250 (on North Yunderup Road), portion of Towera Road and portion of Lot 544 Pinjarra Road, North Yunderup from Rural to Urban Deferred.
Status: Final
Release Date: 14 June 2011
Appeals close