Ministerial Approval Statements

If the Minister for Environment determines that a proposal may be implemented, he/she issues a statement setting out the implementation decision and the conditions, if any, to which the implementation is subject. All Ministerial Approval Statements issued under s45(5) of the Environmental Protection Act 1986 are listed below with the most recent appearing first.

 Search all Ministerial Approval Statements

Go Search
  Displaying pages [ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20  ]
0461 - Limestone Mine, Quicklime Plant and Use of Existing Port Facility Point Murat Shire of Exmouth
Summary: Ministerial Approval Statements
Release Date: 6 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 488.83 KB)

0460 - MidWest Iron and Steel Project-Geraldton Steel Plant, Oakajee, Shire of Chapman Valley
Summary: Ministerial Approval Statements
Release Date: 6 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 594.99 KB)

0459 - Extensions to Exmouth Water Supply Borefield, Town of Exmouth
Summary: Ministerial Approval Statements
Release Date: 6 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 186.08 KB)

0458 - Midwest Iron and Steel Project, Geraldton Steel Plant Narngulu Industrial Estate, Geraldton Increase in Production from 1.0mtpa to 2.4 mtpa
Summary: Ministerial Approval Statements
Release Date: 6 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 431.79 KB)

0457 - Wonnich Gas Development south-west of the Montebello Islands
Summary: Ministerial Approval Statements
Release Date: 6 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 437.53 KB)

0456 - Prawn Farm, Heron Point, Exmouth Gulf
Summary: Ministerial Approval Statements
Release Date: 6 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 214.51 KB)

0455 - Heavy Minerals Mine at Jangardup
Summary: Ministerial Approval Statements
Release Date: 6 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 125.82 KB)

0454 - Pipeline Fabrication Site Within Mardie Station Pastoral Lease, Shire of Roebourne
Summary: Ministerial Approval Statements
Release Date: 6 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 180.71 KB)

0453 - Boddington Gold Mine, Extended Basement Operation, Shire of Boddington
Summary: Ministerial Approval Statements
Release Date: 6 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 408.67 KB)

0452 - Staged Expansion of Tiwest Pigment Plant to 180,000tpa, Kwinana
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 271.22 KB)

0451 - Onslow Solar Salt Project
Summary: The implementation of this proposal is now subject to the conditions contained in Ministerial Statement 401 (November 1995), subject to the amendment and addition of the conditions contained in this statement.

Attachment 1 to Statement 451 – Increase in production capacity; decrease in haulage, washing and stacking rate; addition of three crystalliser ponds; decrease in bitterns discharge volume; correction of water use units – change to proposal approved under section 45C on 12 February 2013.


Status: Final
Release Date: 26 June 1997
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 411.39 KB)

0450 - Hedges Gold Project, Shire of Boddington
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 345.66 KB)

0449 - Appraisal Drilling Programme for Wonnich Field South-West of the Montebello Islands
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 375.95 KB)

0448 - Murray Lakes Golf Complex and Residential Estate, Yunderup
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 228.96 KB)

0447 - Horticultural Development on 200 Hectares of Land Sussex Location 4158, Governor Broome Road Shire of Augusta-Margaret River
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 191.4 KB)

0446 - Chlor-alkali Plant Expansion to 42,000tpa, Kwinana
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 330.26 KB)

0445 - Nickel-Cobalt Ore Mining and Processing First Proposal Murrin Murrin 60km east of Leonora
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 286.9 KB)

0444 - Nickel-Cobalt Ore Mining Processing alternative Sites Murrin Murrin, 60km east of Leonora 1038
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 426.01 KB)

0443 - Breakwater Extension, Northern Harbour Precinct Jervoise Bay
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 186.47 KB)

0442 - Mining of Titanium Minerals, 2km south of Yarloop
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 232 KB)

0441 - Albany Highway, Bedfordale Hill Section Duplication
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 181.7 KB)

0440 - Hard Rock Quarry-ML 47/306, 309, 331 353 Burrup Peninsula
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 214 KB)

0439 - Orebody 18 Iron Ore Mine, ML 244SA 32 km East of Newman
Summary: The proposal is to develop an open cut iron ore mining operation at Orebody 18 involving mining 116 Mt of ore at a rate of up to 15Mtpa for a mine life of 12 to 15 years. Support infrastructure includes an 8 km rail spur and crushing, screening and load out facilities.

Attachment 1 to Statement 439 – Modification of pit areas and depths, enlargement of temporary stockpiles, adjustments to areas and locations of out-of-pit overburden storage areas, alteration to the arrangement of train wagons, increase in the workforce and establishment of a Maximum Disturbance Boundary – change to proposal approved under section 45C on 19 August 2008.

Attachment 2 to Statement 439 – Increase to maximum area of disturbance, area of pit, and area of overburden storage areas; and administrative changes to the Key Characteristics Table – change to proposal approved under section 45C on 17 June 2013.
Status: Final
Release Date: 6 February 1997
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 2.65 MB)

0438 - Gnangara Mound Groundwater Resources
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 334.61 KB)

0437 - Gnangara Mound Groundwater Resources
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 65.19 KB)

0436 - Roe Highway Extension, Stages 3 to 5 Welshpool Rd to South St
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 325.33 KB)

0435 - Mining of Gypsum Within Chinocup A Class Nature Reserve, Pingrup, Shire of Kent
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 464.53 KB)

0434 - Heavy Mineral Sands Mine, Beenup, Shire of Augusta-Margaret River
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 646.56 KB)

0433 - Upgrade of Dust Management At Finucane Island and Nelson Point
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 197.29 KB)

0432 - Development of a New Berth, Albany Port
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 183.63 KB)

0431 - Bunbury Harbour City Development-Marina
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 232.7 KB)

0430 - Yakabindie Nickel Project, Leonora
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 406.39 KB)

0429 - Cawse Nickel Project 50 km north-west of Kalgoorlie
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 216.11 KB)

0428 - 428. Bulong Nickel-Cobalt Laterite Project 30km East of Kalgoorlie
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 181.27 KB)

0427 - Water Supply for Kemerton Industrial Park, Kemerton
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 199.87 KB)

0426 - Rare earth project 4km south of Alcoa Alumina Refinery and next to Gallium Plant Pinjarra
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 443.27 KB)

0425 - Shark Bay Salt, Pond Expansion, Useless Inlet
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 157.95 KB)

0424 - Residential and Caravan/Chalet Park Subdivision and Development, Lot 6 Part Lot 64, Lloyd Avenue, Ravenswood
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 155.97 KB)

0423 - Expansion of Alumina Production from 2.0 to 3.5 million tonnes per annum at Worsley Refinery, and associated bauxite mining activities, Boddington
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 459.4 KB)

0422 - Service Vessel Facility Princess Royal Harbour, Albany
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 153.03 KB)

0421 - Albany Foreshore Redevelopment Princess Royal Harbour
Summary: Ministerial Approval Statements
Release Date: 9 May 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 1.51 MB)

0420 - AUSI Iron Project, Infrastructure requirements, Wickham
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 316.34 KB)

0419 - Remlap Ranch Resort, Myalup
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 208.41 KB)

0418 - Nickel-Cobalt Ore Mining Processing Murrin Murrin, 60 km east of Leonora
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 254.92 KB)

0417 - Yandicoogina Iron Ore Mine Railway, 90 km North West of Newman, Hamersley Range
Summary: Ministerial Approval Statements
Release Date: 25 May 2006
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 667.59 KB)

0416 - Premier Coal Mine Expansion Collie
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 254.43 KB)

0415 - Mt Keith Nickel Project: Tailings Storage Upgrade 400km North of Kalgoorlie
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 206.83 KB)

0414 - Ascot Waters- Dredging Two Channels to Connect an Artificial Wetland with the Swan River, City of Belmont
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 281.19 KB)

0413 - Mid-west Iron and Steel, Geraldton Steel Plant, Narngulu Industrial Estate, Geraldton
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 277.97 KB)

0412 - Synthetic Rutile Plant, Muchea
Summary: Ministerial Approval Statements
Release Date: 3 September 2004
Appeals close
Click here to view the document (file type: Acrobat PDF file size: 310.86 KB)