Summary: The construction of eleven loops adjacent and connected to the existing underground gas transmission pipeline within the existing corridor to raise the capacity of the system.
Attachment 1 to Statement 735 - To allow for construction within additional easements granted for the purposes of the Dampier to Bunbury Natural Gas Pipeline - change to proposal approved under s45C on 5 August 2011.
Release Date: 15 December 2006
Status: Final
Report Number: 0735
Click here to view the document (file type: Acrobat PDF file size: 1.08 MB)
Appeals close