0605 - Telfer Project, Power Supply Infrastructure Corridor Port Hedland to Telfer Gold Mine, Great Sandy Desert


Summary: Supply of electrical power to the Telfer Gold Mine along a 440 kilometre infrastructure corridor from Port Hedland, as documented in schedule 1. The corridor will contain either a natural gas pipeline to supply a power station at the mine, or an overhead electrical transmission line delivering power from a power station located at Port Hedland.

Attachment 1 to Statement 605 – Alteration to pipeline route from Port Hedland to Telfer – change to proposal approved under section 45C on 19 August 2004.

Attachment 2 to Statement 605 – Consolidation and Amendment of Key Characteristics Table Option 1a (Supplying natural gas from Port Hedland via a buried pipeline to the Telfer Gold Mine for on-site electricity generation at a new open cycle gas fired power plant) – change to proposal approved under section 45C on 2 May 2012.
Release Date: 1 October 2002
Status: Final
Report Number: 0605
Click here to view the document (file type: Acrobat PDF file size: 438.7 KB)