Statement 847 – Roy Hill Infrastructure Railway, Shire of Ashburton, Shire of East Pilbara, Town of Port Hedland - Attachment 2 Summary: Addition of a lateral access road extending outside the environmental approval corridor, and ancillary access roads within the environmental approval corridor - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 16 May 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 686.92 KB)
Statement 811 – Koolanooka/Blue Hills direct shipping ore mining project, Shires of Morawa and Perenjori - Attachment 3 Summary: Amendments to the Blue Hills component of the Koolanooka/Blue Hills DSO Mining Project to include expansion of the Mungada West and East pits, relocation of the processing facilities, relocation and expansion of waste stockpiles and ore stockpiles, relocate the access tracks and haul roads and reduction of clearing of the Mungada haul road between Koolanooka and Blue Hills - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 3 May 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 1.33 MB)
Statement 391 – Port Geographe – Stage 1 - Attachment 4 Summary: Delete Figure 1 and replace with a revised Figure 1 (March 2013). Provide a conceptual layout of coastal structures (Figure 2). Provide the key characteristics of the proposal (Table 1) - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 12 April 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 2.48 MB)
Statement 371 - Murrayfield Airpark Resort Complex, Nambeelup, Shire of Murray Second Proposal - Attachment 1 Summary: Revised proposal description - removal of the resort complex and golf course, creation of approximately 50 strata-titled lots for aviation related service activities, construction of taxiway access from serviced lots to main runway - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 28 March 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 873.05 KB)
Statement 756 – Mesa A / Warramboo Iron Ore Project, 43km west of Pannawonica, Shire of Ashburton - Attachment 3 Summary: Increase in disturbance footprint and removal of 10 year mine life limit - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 27 March 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 450.44 KB)
Statement 506 – Murrin Murrin Nickel-Cobalt Project Stage 2 Expansion, 60 km east of Leonora - Attachment 4 Summary: Changes to Schedule 1, Key Characteristics table relating to the clearing of an additional 300 ha of vegetation to allow for the development of additional Pits, Waste Dumps and Ore Stockpiles - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 27 March 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 240.99 KB)
Statement 873 – Wheatstone Development – Gas Processing, Export Facilities and Infrastructure. Shire of Ashburton and Roebourne - Attachment 4 Summary: Amendment to coordinates of Overflow Control Zones - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 18 March 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 30.27 KB)
Statement 873 – Wheatstone Development – Gas Processing, Export Facilities and Infrastructure. Shire of Ashburton and Roebourne - Attachment 3 Summary: Inclusion of offshore Sand Borrow Area for trunkline installation - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 18 March 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 22.42 KB)
Statement 873 – Wheatstone Development – Gas Processing, Export Facilities and Infrastructure. Shire of Ashburton and Roebourne - Attachment 2 Summary: An amendment to delete reference to utilities, discharges and capacity limits detailed in Schedule 1 - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 28 February 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 63.38 KB)
Statement 535 – Upgrade of Marine Services Facility, King Bay, Dampier - Attachment 3 Summary: Extension of existing slipway groyne by 50 metres and deletion of a number of elements as they have been completed or are not environmentally significant - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 26 February 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 538.08 KB)
Statement 776 – Mesa K Remnant Mining Project, 11km south-west of the town of Pannawonica, Shire of Ashburton - Attachment 1 Summary: Increase in disturbance footprint and amendment of troglofauna mining avoidance areas - change to proposal approved under section 45C.
Click here for the complete statement.
Status: Final
Release Date: 25 February 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 397.34 KB)
Statement 805 – Karara Iron Ore Project 215 kilometres east-southeast of Geraldton and 320 kms north-northeast of Perth, Shire of Perenjori - Attachment 3 Summary: Additional clearing for construction of processing plant to facilitate the phased KIOP Expansion Project - change to proposal approved under section 45C.
Click here for the complete statement.
Status: Final
Release Date: 20 February 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 280.52 KB)
Statement 451 - Onslow Solar Salt Project - Attachment 1 Summary: Increase in production capacity; decrease in haulage, washing and stacking rate; addition of three crystalliser ponds; decrease in bitterns discharge volume; correction of water use units - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 12 February 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 149.68 KB)
Statement 814 - Cundaline and Callawa Mining Operations - Attachment 1 Summary: Increase in maximum disturbance and land disturbance boundaries - change to proposal approved under section 45C.
Click here for the complete statement.
Status: Final
Release Date: 11 February 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 1.31 MB)
Statement 700 – Sodium Cyanide Plants Liquid and Solid at Kwinana and Transport of Sodium Cyanide by Road and Rail from Kwinana - Attachment 1 Summary: Increase in the liquid sodium cyanide production capacity from 70,000 to 85,000 tonnes per annum (tpa). Minor changes to the solid sodium cyanide plant facilities to accurately reflect the requirements for achieving the currently approved production capacity of 45,000 tpa - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 11 February 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 111.3 KB)
Statement 391 - Port Geographe - Stage 1 - Attachment 3 Summary: To define the spatial components of the Port Geographe Development, identifying the Land Development Component and the Coastal Structures Component - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 5 February 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 1.12 MB)
Statement 810 - Keysbrook Mineral Sands Mine Shire of Serpentine-Jarrahdale and Shire of Murray - Attachment 2 Summary: Increase in proposal area to accommodate wet processing plant adjacent to the mining area, and change to area of vegetation to be protected - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 4 February 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 419.06 KB)
Statement 873 – Wheatstone Development – Gas Processing, Export Facilities and Infrastructure. Shire of Ashburton and Roebourne - Attachment 1 Summary: An amendment to the turning basin identified in Figure 6 of Schedule 1 - change to proposal approved under section 45C.
Click here for the complete statement.
Status: Final
Release Date: 14 January 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 419.84 KB)
Statement 724 – Bluewaters Power Station - Phase II Shire of Collie - Attachment 7 Summary: Removal of maximum sulphur oxides in emissions and plant thermal efficiency - change to proposal approved under section 45C.
Click here for the complete statement.
Status: Final
Release Date: 7 January 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 35.88 KB)
Statement 685 – Bluewaters Power Station, Shire of Collie - Attachment 7 Summary: Removal of maximum sulphur oxides in emissions and plant thermal efficiency - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 7 January 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 37.35 KB)
Statement 854 – Hope Downs 4 Iron Ore Mine Shire of East Pilbara - Attachment 2 Summary: Removal of Infrastructure Corridor Option 6, changes to Project Area - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 7 January 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 4.96 MB)
Statement 648 – Kwinana Ammonia Project, Kwinana Industrial Area - Attachment 1 Summary: Revised Proposal description; amendments to elements in the Key Characteristics table relating to 'Gaseous Emissions', 'Natural Gas Consumption' and 'Ammonia Transfers'; and removal of characteristics managed by other regulatory authorities - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 3 January 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 31.89 KB)
Statement 875 – Ammonium Nitrate Production Expansion Project: Phase 2, Kwinana Town of Kwinana - Attachment 1 Summary: Removal of "Greenhouse gas emissions" - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 3 January 2013
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 34.71 KB)
Statement 858 – Roy Hill 1 Iron Ore Project, Port Infrastructure Port Hedland - Attachment 1 Summary: Increase in terrestrial vegetation and ground disturbance area - change to proposal approved under section 45C.
Click here for the complete statement.
Status: Final
Release Date: 17 December 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 21.5 KB)
Statement 478 – Newman Satellite Development - Mining of Orebody 23 Below the Water-Table - Attachment 2 Summary: Life of project and ore mining rate - change to proposal approved under section 45C.
Click here for the complete statement.
Status: Final
Release Date: 4 December 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 20.33 KB)
Statement 627 – Koolyanobbing Iron Ore Expansion Windarling Range and Mt Jackson Shire of Yilgarn - Attachment 9 Summary: Mining of Windarling Range W1 deposit below the groundwater table - change to proposal approved under section 45C.
Click here for the complete statement.
Status: Final
Release Date: 20 November 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 986.26 KB)
Statement 839 – Tropicana Gold Project, Shire of Menzies, Shire of Laverton and the City of Kalgoorlie - Boulder - Attachment 1 Summary: Implement a single cell tailings storage facility - change to proposal approved under section 45C.
Click here for the complete statement.
Status: Final
Release Date: 19 November 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 32.96 KB)
Statement 199 – Relocation of Herne Hill Quarry Operation - Attachment 3 Summary: Clearing of 1 ha of vegetation for the purpose of extending the stockpile and conveyor areas - change to proposal approved under section 45C.
Click here for the complete statement.
Status: Final
Release Date: 19 November 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 212.85 KB)
Statement 900 – Yilgarn Operations Deception Deposit - Attachment 1 Summary: Realignment of the Deception Deposit Haul Road and the siting of the Deception Deposit Waste Rock Landform - change to proposal approved under section 45C.
Click here for the complete statement.
Status: Final
Release Date: 19 November 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 895.58 KB)
Statement 749 – Coyote Gold Mine, Stage 2, approximately 280 kilometres south east of Hall's Creek, Tanami Desert, Shire of Hall's Creek - Attachment 2 Summary: Development of Osprey Satellite Pit - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 1 November 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 273.82 KB)
Statement 627 – Koolyanobbing Iron Ore Expansion Windarling Range and Mt Jackson Shire of Yilgarn - Attachment 8 Summary: Increase in disturbance footprint of 45 ha at Windarling to allow for stockpiling of topsoil, subsoil and vegetation materials to be used in future rehabilitation - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 12 October 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 2.57 MB)
Statement 627 – Koolyanobbing Iron Ore Expansion Windarling Range and Mt Jackson Shire of Yilgarn - Attachment 7 Summary: Reduction of project impacts to Declared Rare Flora - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 25 September 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 8.91 MB)
Statement 712 - Orebody 25 Extension Project, 8 kms northeast of Newman, Shire of East Pilbara - Attachment 3 Summary: Increase in disturbance area and development envelope - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 19 September 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 532.19 KB)
Statement 0753 - Mt Gibson Iron Ore Mine and Infrastructure Project, Shire of Yalgoo- Attachment 6 Summary: Mining rate, clearance increases, and power supply changes - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 28 August 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 2.54 MB)
Statement 0584 - Hope Downs Iron Ore Mine, 75km North-West of Newman, Pilbara Region - Attachment 4 Summary: Removal of ore mining rate and expansion of disturbance footprint - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 28 August 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 37.57 KB)
Statement 884 – Coastal Walk Trail from Point Ann to Hamersley Inlet - Fitzgerald River National Park - Attachment 1 Summary: Two walk trails: an Eastern walk trail from Quoin Head to Cave Point including a spur trail to Hamersley Inlet; and a Western trail from Point Ann to Fitzgerald Inlet with shorter walk option at Lake Nameless; reduction and relocation of overnight camping, and amendment to Wilderness Management Zone Boundary - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 28 August 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 456.78 KB)
Statement 484 – Mineral Sands Mine, Dardanup - Attachment 3 Summary: Multiple amendments to the Key Characteristics Table relating to project life, groundwater influence and water supply, as a result of the Dardanup Southern Extension Project - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 9 August 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 30.94 KB)
Statement 775– Pardoo iron ore mine and direct shipping from Port Hedland, Shire of East Pilbara and Town of Port Hedland - Attachment 4 Summary: Increase the volume of annual dewatering and environmental discharge from 4 GL to 10 GL per annum, and increase in total disturbance footprint from 490.4 ha to 501.7 ha - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 24 July 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 31.82 KB)
Statement 852 – Carina Iron Ore Mine, approximately 60 kilometres north east of Koolyanobbing, Shire of Yilgarn - Attachment 1 Summary: Changes to clearing areas and project boundaries associated with the Rail Siding, Haul Road, and new Powerline Corridor - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 28 June 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 3.39 MB)
Statement 805 – Karara Iron Ore Project 215 kilometres east-southeast of Geraldton and 320 kms north-northeast of Perth, Shire of Perejori - Attachment 2 Summary: Increase in disturbance area to allow for increased waste dump area, rail loop and airstrip clearing - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 21 June 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 803.29 KB)
Statement 715 – Koolan Island Iron Ore Mine and Port Facility, Shire of Derby-West Kimberley - Attachment 4 Summary: Increase to Disturbance Footprint from 590 ha to 650 ha - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 21 June 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 189.19 KB)
Statement 880 – Cape Lambert to Emu Siding Rail Duplication - Attachment 1 Summary: Realignment of the originally proposed rail duplication - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 19 June 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 1.23 MB)
Statement 775 – Pardoo iron ore mine and direct shipping from Port Hedland, Shire of East Pilbara and Town of Port Hedland - Attachment 3 Summary: Increase the volume of annual dewatering and environmental discharge from 2 GL per annum to 4.0 GL per annum - change to proposal approved under section 45C.
Click here for the complete statement. Status: Final
Release Date: 24 May 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 28.58 KB)
Statement 605 – Telfer Project, Power Supply Infrastructure Corridor Port Hedland to Telfer Gold Mine, Great Sandy Desert - Attachment 2 Summary: Consolidation and Amendment of Key Characteristics Table Option 1a (Supplying natural gas from Port Hedland via a buried pipeline to the Telfer Gold Mine for on-site electricity generation at a new open cycle gas fired power plant) - change to proposal approved under s45C.
Click here for the complete statement. Status: Final
Release Date: 7 May 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 23.16 KB)
Statement 859 – South West Creek Dredging and Reclamation Project - Attachment 2 Summary: Realignment of the access track between Utah Point Road and the dredging area, and associated changes to the zone of permanent mangrove loss - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 2 May 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 2.37 MB)
Statement 719 – Worsley Alumina - Production to Maximum Capacity of 4.4 Mtpa Alumina and Associated Mining - Attachment 7 Summary: Change to Sulphur Dioxide and Carbon Monoxide emissions - change to proposal approved under s45C.
Click here for the complete statement.
Status: Final
Release Date: 30 April 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 36.7 KB)
Statement 584 – Hope Downs Iron Ore Mine, 75km North-West of Newman, Pilbara Region - Attachment 3 Summary: Remove Weeli Wolli Spring supplementation limit in Schedule 1 - change to proposal approved under s45C.
Click here for the complete statement. Status: Final
Release Date: 20 April 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 14 KB)
Statement 837 – Bluewaters Power Station Expansion - Phase III and Phase IV Shire of Collie, Shire of Dardanup, Shire of Harvey - Attachment 1 Summary: Figure 5 of Statement 837 is replaced and superseded by Figure 6 - change to proposal approved under s45C.
Click here for the complete statement. Status: Final
Release Date: 18 April 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 2.81 MB)
Statement 658 – Clay Excavation Lots 10, 11 Part Lot 36 Great Northern Highway, Upper Swan - Attachment 1 Summary: Redefine Lees Pit boundary from lots 10, 11 and part lot 36 to lot 201 as seen in figure 3 - change to proposal approved under s45C.
Click here for the complete statement. Status: Final
Release Date: 16 April 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 288.36 KB)
Statement 741 – Cape Lambert upgrade - Increase in throughput to 85 million tons per annum, Shire of Roebourne - Attachment 1 Summary: Linkage Proposal – Increase in throughput from 85 Mtpa to 105 Mtpa and additional infrastructure. Inclusion of Figure 3 – Indicative Layout of the Linkage - change to proposal approved under s45C.
Click here for the complete statement. Status: Final
Release Date: 4 April 2012
Appeals closeClick here to view the document (file type: Acrobat PDF file size: 449.49 KB)