| No. | Report |
|---|
| 1427 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by BHP Billiton Iron Ore to construct and operate an Outer Harbour Development, including rail and ore stockpile facilities, in Port Hedland Western Australia.
Download Appendix 5, Response to submissions
Download the appendices to Appendix 5 and other supporting documentation from the proponent's website. Status: Final Proponent: BHP Billiton Iron Ore Release Date: 23 January 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.8 MB)
|
| 1426 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Cliffs Asia Pacific Iron Ore Pty Ltd to develop the Deception Deposit open cut iron ore mine, waste rock landform, ore stockpile, haul road and associated infrastructure, 150 kilometres north of Southern Cross.
Download the API documentation from the proponent's website. Status: Final Proponent: Cliffs Asia Pacific Iron Ore Pty Ltd Release Date: 9 January 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 8.5 MB)
|
| 1425 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the revised proposal by Kemerton Silica Sand Pty Ltd to extend dredge mining of silica sands. Status: Final Proponent: Kemerton Silica Sand Pty Ltd Release Date: 9 January 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 4.7 MB)
|
| 1424 | |
| Summary: This letter is the EPA's report and recommendations to the Minister of Environment on Hamersley Hope Management Services Pty Ltd's proposed changes to the environmental conditions for the Hope Downs Iron Ore Mine proposal (Ministerial Statement 584) pursuant to s46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Hamersley Hope Management Services Pty Ltd Release Date: 19 December 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 103.48 KB)
|
| 1423 | |
| Summary: This letter is the EPA's report and recommendations to the Minister for Environment on CSR Gyprock Fibre Cement's proposed changes to the implementation condition 8-1 for the Expansion of Jurien Gypsum Mining Operation (Ministerial Statement 730, pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: CSR Gyprock Fibre Cement Release Date: 19 December 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 954.91 KB)
|
| 1422 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment under Section 44 of the Environmental Protection Act 1986 on the proposal by Marine Produce Australia Ltd to increase production of barramundi (Lates calcarifer) to 2000 tonnes per annum at its sea cage aquaculture facility in Cone Bay, West Kimberley. Status: Final Proponent: Marine Produce Australia Ltd Release Date: 9 December 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.3 MB)
|
| 1421 | |
| Summary: This is the EPA's Report and Recommendations to the Minister for Environment on Mt Gibson Mining Limited and Extension Hill Pty Lld's requested changes to the environmental conditions for the Mount Gibson Iron Ore Mine and Infrastructure Project (Ministerial Statement 753), pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Mount Gibson Mining Limited and Extension Hill Pty Ltd Release Date: 5 December 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.68 MB)
|
| 1420 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Point Grey Development Company Pty Ltd to construct a navigation channel in the Harvey Estuary and onshore marina on the western side of Point Grey peninsula.
Download Appendix 5 documents from the proponent's website. Status: Final Proponent: Point Grey Development Company Pty Ltd Release Date: 5 December 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.06 MB)
|
| 1419 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to construct and operate port infrastructure located within existing or proposed Port Hedland Port Authority land and the Boodarie Multi-user Stockyard Area.
Download the report below.
Download Appendix 3, the proponent's referral document, here. Status: Final Proponent: North West Infrastructure Release Date: 28 November 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1013.64 KB)
|
| 1418 | |
| Summary: This letter is the EPA's report and recommendations to the Minister for Environment on the Shire of Busselton's proposed change to the environmental conditions for the Busselton Regional Aerodrome (Ministerial Statement 399). Status: Final Proponent: Shire of Busselton Release Date: 31 October 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 3.84 MB)
|
| 1417 | |
| Summary: This report is the EPA's report and recommendations to the Minister for Environment pursuant to section 46(6) of the Environmental Protection Act 1986 (the EP Act) on Western Areas NL proposed changes to the environmental conditions for the Spotted Quoll Open Pit Nickel Project. Status: Final Proponent: Western Areas NL Release Date: 24 October 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.12 MB)
|
| 1416 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to establish the Hamersley Agriculture Project, within the central Pilbara. The proposal aims to utilise surplus mine water from the Marandoo Mine Phase Two to cultivate crops for agricultural purposes and on-selling to pastoralists in the region as stock feed. Status: Final Proponent: Hamersley Iron Pty Ltd Release Date: 17 October 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.9 MB)
|
| 1415 | |
| Summary: This report provides the advice of the EPA to the Minister for environment under Section 46(1) of the Environmental Protection Act 1986 (EP Act) on Ministerial Conditions 559, as amended by Statement 783, imposed on Magellan Metals Pty Ltd (Magellan) on 2 February 2009.
On 23 February 2011 the Minister for Environment imposed Interim Implementation Conditions on Magellan under Section 45B of the EP Act in order to strengthen the auditing, monitoring and reporting requirements of the project to allow Magellan to resume the transportation of lead carbonate concentrate, following a stop order that was issued on 31 December 2010. The Interim Implementation Conditions superseded Ministerial Statement 559 and 783 and are effective until the completion of this review and the Minister deciding on the conditions that the proposal will be subject to. Status: Final Proponent: Magellan Metals Pty Ltd Release Date: 3 October 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 3.14 MB)
|
| 1414 | |
| Summary: The Town of Port Hedland, the Responsible Authority, initiated Amendment 22 to its Town Planning Scheme No.5 (TPS5) in June 2009. Amendment 22 arose out of recommendations from the Town of Port Hedland’s Land Use Master Plan (LUMP) (Town of Port Hedland, 2008). These recommendations include reducing the potential for human exposure to dust.
The Environmental Protection Authority (EPA) set the level of assessment as ‘Scheme Assessed – Environmental Review’ in September 2009. The EPA determined that Amendment 22 warranted formal assessment due to the level of uncertainty of increasing residential density in an area recognised as having air quality (dust) levels that often exceed national standards.
This report provides the EPA's recommendations to the Minister for Environment on the proposed scheme amendment. Status: Final Proponent: Town of Port Hedland Release Date: 29 August 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.65 MB)
|
| 1413 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Crosslands Resources Ltd to expand the Jack Hills Iron Mine.
Download Appendix 5 - Proponent's response to submissions (pdf 507 kb) Status: Final Proponent: Crosslands Resources Ltd Release Date: 15 August 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.45 MB)
|
| 1412 | |
| Summary: This letter is the EPA's Report and Recommendations No. 1412 to the Minister for Environment pursuant to section 46(6) of the Environmental Protection Act 1986, reporting on Pilbara Iron Pty Ltd's proposed changes to the environmental conditions for the Cape Lambert Port B Development. Status: Final Proponent: Pilbara Iron Pty Ltd Release Date: 3 August 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 79.66 KB)
|
| 1411 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by St Ives Gold Mining Company Pty Ltd to expand existing gold mining operations on Lake Lefroy, which includes dewatering discharge to the lake surface.
Download Appendix 5 - Proponent's response to submissions (pdf 23.5 Mb) Status: Final Proponent: St Ives Gold Mining Company Pty Ltd Release Date: 3 August 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 5.18 MB)
|
| 1410 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Cazaly Iron Pty Ltd to develop and operate an open cut iron ore mine at the Parker Range (Mount Caudan) deposit in the Shire of Yilgarn.
Download Appendix 5 - The proponent's response to submissions (pdf 16 Mb) Status: Final Proponent: Cazaly Iron Ore Pty Ltd Release Date: 3 August 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 4.24 MB)
|
| 1409 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by API Management Pty Ltd, to develop eight iron ore deposits at five locations, between 35 and 85 km south of Pannawonica. The proposal includes a heavy-haulage railway of approximately 285 km in length.
Download Appendix 5: Proponent's response to submissions (Main report) (pdf 1.92 Mb)
Download the complete submissions and response table (pdf 157 kb)
For a CD of Appendix 5 in full, please email the Communications Coordinator or phone 08 6467 5415. Status: Final Proponent: API Management Pty Ltd Release Date: 3 August 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.65 MB)
|
| 1408 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to duplicate an existing 70 kilometre rail line from Cape Lambert to Emu Siding by Rio Tinto Iron Ore.
Download the proponent's referral information (pdf 6.81 Mb)
Download Appendix 1 to the proponent's referral information (zip 43 Mb) Status: Final Proponent: Rio Tinto Iron Ore Release Date: 25 July 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.79 MB)
|
| 1407 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by CSBP Limited to expand its Kwinana Ammonium Nitrate Production Facility. The expansion includes the incorporation of additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tonnes per annum (tpa) to 936,000 tpa.
Download the EPA's report at the bottom of this page.
Download Appendix 5 - Summary of submissions and proponent's response to submissions (pdf 1.47 Mb) Status: Final Proponent: CSBP Ltd Release Date: 18 July 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.14 MB)
|
| 1406 | |
| Summary: This report is the EPA's report and recommendation to the Minister for Environment under section 46(1) of the Environmental Protection Act 1986 on BGC (Australia) Pty Ltd's proposed changes to the environmental conditions for the Voyager Quarry, Lots 11 & 14 BOlton Road, The Lakes (Ministerial Statement 706). Status: Final Proponent: BGC (Australia) Pty Ltd Release Date: 4 July 2011 Appeals close Click here to view the document (file type: Acrobat PDF file size: 156.83 KB)
|
| 1405 | |
| Summary: This report is the Environmental Protection Authority's report to the Minister for Environment on Cliffs Asia Pacific Iron Ore Pty Ltd's proposed changes to the environmental conditions for the Koolyanobbing Iron Ore Project pursuant to section 46(3) of the Environmental Protection Act 1986. Status: Final Proponent: Cliffs Asia Pacific Iron Ore Pty Ltd Release Date: 29 June 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 137.91 KB)
|
| 1404 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority to the Minister for Environment on the key environmental factors and principles for the proposal by Chevron Australia Pty Ltd, to construct and operate a 25 million tonne per annum liquefied natural gas plant, a domestic gas plant and to construct marine facilities to support the proposal.
Download the proponent's response to submissions (pdf 12.3 Mb)
Download Technical appendices FA to FI (pdf 26.6 Mb)
Download Technical appendices FJ to FP and H1 (pdf 38.6 Mb)
Download Technical appendices O6, QFA, S1 and S2 (pdf 15.3 Mb)
Download the supporting assessment documentation (zip 25.1 Mb) Status: Final Proponent: Chevron Australia Pty Ltd Release Date: 15 June 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 5.33 MB)
|
| 1403 | |
| Summary: The Shire of Chapman Valley, the Responsible Authority, proposes to update its entire Local Planning Scheme and a list of the proposed changes can be found in Appendix 1. The Shire of Chapman Valley is located to the north of Geraldton. This assessment relates to only one of the proposed changes, being the proposed rezoning of Lots 3, 7 to 12, 15 to 17, 154, 156 and Street Number 1891 North West Coastal Highway, Buller from “General Farming” to “Development” zone. Status: Final Proponent: Shire of Chapman Valley Release Date: 7 June 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 7.89 MB)
|
| 1402 | |
| Summary: This report provides the Environmental Protection Authority's advice and recommendations to the Minister for Environment on the proposal by Fortescue Metals Group Ltd to increase the dewatering rate to a maximum 50 gigalitres per annum and inject surplus water into the groundwater aquifers at the Christmas Creek Mine. Status: Final Proponent: Fortescue Metals Group Ltd Release Date: 7 June 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.32 MB)
|
| 1401 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to subdivide lots 1000, 2240, 2275, 2657 and 3045 Preston Beach Road, Lake Clifton by Cape Bouvard Investments Pty Ltd.
Download Appendix 6 - Summary of submissions and proponent's response to submissions Status: Final Proponent: Cape Bouvard Investments Pty Ltd Release Date: 30 May 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 925.09 KB)
|
| 1400 | |
| Summary: This report is the EPA’s Report and Recommendations (No. 1400) to the Minister for Environment pursuant to section 46(6) of the Environmental Protection Act 1986 on Roy Hill Infrastructure Pty Ltd’s proposed changes to the environmental conditions for Roy Hill Infrastructure Railway (Ministerial Statement 847). Status: Final Proponent: Roy Hill Infrastructure Pty Ltd Release Date: 23 May 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 71.18 KB)
|
| 1399 | |
| Summary: The Environmental Protection Authority (EPA) has completed its assessment of the application to amend the Environmental Protection (Pinjar Gas Turbine Station Noise Emissions) Approval 2004 made by Verve Energy to the Minister for Environment on 8 February 2011. This report is the EPA's recommendations to the Minister on Verve Energy's application. Status: Final Proponent: Verve Energy Release Date: 23 May 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 74.63 KB)
|
| 1398 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to extend the transport depot at Lot 14 Great Northern Highway, Upper Swan by Mr Adrian Bracjkovich. Status: Final Proponent: Mr Adrian Brajkovich Release Date: 9 May 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.71 MB)
|
| 1397 | |
| Summary: The following is the EPA’s Report and Recommendations to the Minister for Environment on Tanami Gold's proposed changes to the environmental conditions for the Coyote Gold Mine, Stage 2, pursuant to section 46(3) of the Environmental Protection Act 1986. Status: Final Proponent: Tanami Gold NL Release Date: 9 May 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 18.87 KB)
|
| 1396 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by the Department of Environment and Conservation to construct and maintain a 45 kilometre coastal walk trail from Point Ann to Hamersley Inlet, through the Wilderness Management Zone of the Fitzgerald River National Park. Camping facilities such as sleeping huts, water collection facilities and toilets would be constructed at camping points along the walk trail. The proposal would also require vehicle access tracks for ongoing maintenance of the walk trail, camping facilities and emergency response. Status: Final Proponent: Department of Environment and Conservation Release Date: 2 May 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 793.23 KB)
|
| 1395 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Vasse Coal Management Pty Ltd to develop the Vasse Coal Project consisting of an underground coal mine, a coal handling and preparation plant, transportation and associated mine infrastructure. Status: Final Proponent: Vasse Coal Management Pty Ltd Release Date: 2 May 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.09 MB)
|
| 1394 | |
| Summary: Chevron Australia Pty Ltd (proponent) is seeking a change to the implementation conditions of Ministerial Statement 800 under section 46 of the Environmental Protection Act 1986.
This report provides the EPA’s recommendations to the Minister for Environment as to whether any conditions and procedures in Ministerial Statement 800 should be changed. Status: Final Proponent: Chevron Australia Pty Ltd Release Date: 21 April 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 252.43 KB)
|
| 1393 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to extend the Brockman 2 Detrital Iron Ore Mine by extending the existing P4 Extension, Lower Pit 4, Valley Pit and Pit 6 from 580 metres Reduced Level to an approximate depth of 530 mRL to form an amalgamated pit. The proponent is Hamersley Iron Pty Ltd (a subsidiary of Rio Tinto Iron Ore).
The proponent's API document is available at http://www.riotintoironore.com/ENG/media/337.asp Status: Final Proponent: Hamersley Iron Pty Ltd Release Date: 19 April 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.45 MB)
|
| 1392 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to develop a residential subdivision on Lots 3000 (formerly Lot 1512) and 1523 Emu Point Drive, Albany and provide associated infrastructure by LandCorp.
Download the proponent's response to public submissions. (pdf 39.1 Mb)
Appendix A - Submissions received (pdf 23.3 Mb)
Appendix B - Outline Development Plan (pdf 5.97 Mb)
Appendix C - Fire Manangement Plan (pdf 3.87 Mb)
Appendix D - Traffic Study (pdf 0.99 Mb)
Appendix E - Design Guidelines (pdf 3.83 Mb)
Appendix F - May 2009 Concept Plan (pdf 223 kb)
Appendix G - 3D Modelling (pdf 172 kb) Status: Final Proponent: LandCorp Release Date: 18 April 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 6.23 MB)
|
| 1391 | |
| Summary: The Western Australian Planning Commission’s Peel Region Scheme Amendment 017/57 proposes to rezone 90 hectares (ha) of land at North Yunderup to permit urban development. The Amendment also includes adjustments to the Regional Open Space reservation along Wilgie Creek.
This report provides the Environmental Protection Authority’s advice to the Minister for Environment on the environmental factors, conditions and procedures relevant to the proposed scheme amendment. Status: Final Proponent: Western Australian Planning Commission Release Date: 18 April 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 6.21 MB)
|
| 1390 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment following the Strategic Environmental Assessment (SEA) of a proposal by Landcorp to identify an appropriate development footprint and Conservation Area within a 339 hectare (ha) area (SEA Area) in the Rockingham Industrial Zone.
View the response to submissions (pdf 2.25 Mb) Status: Final Proponent: Landcorp Release Date: 4 April 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 3.13 MB)
|
| 1389 | |
| Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by the Dampier Port Authority (DPA) to develop the Dampier Marine Services Facility (DMSF) in the Dampier Archipelago (Figure 1). The proposal expands the existing Dampier Port facilities to construct a land backed wharf, jetty, lay down areas and associated infrastructure. Click here to view the proponent's API document and appendices. Status: Final Proponent: Dampier Port Authority Release Date: 28 March 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.46 MB)
|
| 1388 | |
| Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal to construct and operate a 570 kilometre railway and associated rail infrastructure from the North West Coastal Highway at Oakajee to the Jack Hills mining operations located 500 kilometres to the north east by Oakajee Port and Rail Pty Ltd (OPR). Status: Final Proponent: Oakajee Port and Rail Pty Ltd Release Date: 14 March 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.2 MB)
|
| 1387 | |
| Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by Oakajee Port and Rail Pty Ltd (OPR) to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Status: Final Proponent: Oakajee Port and Rail Pty Ltd Release Date: 14 March 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.89 MB)
|
| 1386 | |
| Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal to develop two new mines within the Solomon Project, and to construct a 127 km railway from the new mines eastwards to the existing Fortescue railway by Fortescue Metals Group Limited (Fortescue). Status: Final Proponent: Fortescue Metals Group Limited Release Date: 14 March 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 3.64 MB)
|
| 1385 | |
| Summary: Busselton Regional Aerodrome - proposal under s46 of the Environmental Protection Act 1986 to add a condition to Ministerial Statement 399 to allow a Fokker 100 operated by Skywest Airlines to depart from Busselton Regional Aerodrome between 2200 hours on 20 February 2011 and 0100 hours on 21 February 2011. Status: Final Proponent: Shire of Busselton Release Date: 14 February 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 25.47 KB)
|
| 1384 | |
| Summary: This report provides the EPA’s advice to the Minister for the Environment under section 16(e) of the EP Act. The outcome of the EPA’s review of Statement 519 is that the environmental conditions are not required because:
(a) provisions reflecting the requirements of the conditions in Statement 519 are included in Amendment 104 (as modified); and
(b) the extent of the land to be rezoned in Amendment 104 (as modified) has been reduced. Relevant environmental factors such as caves (Ministerial Condition 7) and wetlands (Ministerial Condition 9) are no longer present within the area which is the subject of Amendment 104 (as modified). Status: Final Release Date: 16 February 2011 No Appeals Click here to view the document (file type: Acrobat PDF file size: 5.8 MB)
|
| 1383 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on Bemax Resources Limited’s proposal to develop a mineral sand mining proposal that is located in the Shire of Capel on the Whicher Scarp, 10 km south of the town of Boyanup. The two deposits (northern and southern) contain over 750,000 tonnes of recoverable heavy mineral concentrate and will be mined using open cut, dry mining techniques involving heavy earthmoving equipment and processed through screening and separation plants. This proposal will involve the clearing of 146 ha of native vegetation. Status: Final Proponent: BEMAX Resources Limited Release Date: 14 February 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.22 MB)
|
| 1382 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Central West Coal Pty Ltd to mine and supply approximately 75 million tonnes of subbituminous grade crushed coal to the proposed Coolimba Power Station at a rate of 2 to 2.5 million tonnes per annum over 30 years.
Download the summary of submissions (pdf 66kB)
Download the response to submissions (pdf 1.58 MB) Status: Final Proponent: Central West Coal Pty Ltd (a subsidiary of Aviva Corporation Limited) Release Date: 7 February 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 5.48 MB)
|
| 1381 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Hanson Construction Materials Pty Ltd to extend the Red Hill Quarry to the north and west of the current pit, extend the existing stockpile and dispatch area, relocate the primary crusher to the pit and install a quaternary crusher.
Download the response to submissions (pdf 9.52 MB) Status: Final Proponent: Hanson Construction Materials Pty Ltd Release Date: 31 January 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 10.35 MB)
|
| 1380 | |
| Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal to expand port infrastructure in the Port Hedland Inner Harbour. The development would provide eight new berths in South West Creek, a tributary of the Port Hedland Inner Harbour estuary, and involves dredging with associated onshore and offshore disposal of dredged material. Status: Final Proponent: Port Hedland Port Authority Release Date: 10 January 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.75 MB)
|
| 1379 | |
| Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment on the proposal by Burrup Nitrates Pty Ltd to construct and operate a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate. The proposal is located on the Burrup Peninsula approximately 13 km northwest of Karratha.
Download the response to submissions (pdf 5.39 Mb) Status: Final Proponent: Burrup Nitrates Pty Ltd Release Date: 10 January 2011 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.39 MB)
|
| 1378 | |
| Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal to clear approximately 5 hectares (ha) of native vegetation for an olive grove at Lot 1612 Barrett Street, Southern River by C Campbell. Status: Final Proponent: C Campbell Release Date: 10 December 2010 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 4.1 MB)
|