| No. | Report |
|---|
| 1480 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Macarthur Minerals Limited to develop an iron ore mine and associated infrastructure in the Goldfields region, 450 km east-north-east of Perth. The proposal includes a borefield and adjoining water pipeline 60 km west of the mine site and a rail siding 130 km east of the mine site and 8 km south of Menzies.
Download the proponent's main API document (pdf 7.87 Mb)
Download the proponent's addendum to Revision 2 of the API document (pdf 5.5 Mb)
Enclosures 1 and 2 - GIS shapefiles (zip 1.18 Mb)
Enclosure 3 - Appendices:
Appendices 1 - 10 (zip 47.2 Mb)
Appendices 11 - 15 (zip 34.4 Mb)
Appendices 16 - 20 (zip 42.9 Mb)
Appendices 21 - 32 (zip 42.7 Mb)
Enclosure 5 - Raw flora and fauna data (zip 6.29 Mb)
Enclosure 6 - All figures (pdf 6.2 Mb)
Enclosure 7 - Figures for the EPA report (zip 27.1 Mb) Status: Final Proponent: Macarthur Minerals Limited Release Date: 17 June 2013 Appeals period closing date: 01 July 2013 Click here to view the document (file type: Acrobat PDF file size: 1.67 MB)
|
| 1479 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Hamersley Iron Pty Ltd to develop the Turee Syncline iron ore mine and associated infrastructure 30 kilometres north-east of Paraburdoo.
Download Appendix 5: Summary of submissions and proponent's response to submissions here (pdf 543 kb) Status: Final Proponent: Hamersley Iron Pty Ltd Release Date: 14 June 2013 Appeals period closing date: 28 June 2013 Click here to view the document (file type: Acrobat PDF file size: 2.04 MB)
|
| 1478 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Tronox Management Pty Ltd, to develop and operate a mineral sands mine approximately 25 kilometres south-east of Dongara in the Midwest region of Western Australia.
Download the proponent's response to submissions here (pdf 11.3 Mb)
Download the appendices to the response to submissions (zip 12.1 Mb)
Other documents
EPA Scoping document for PER (pdf 8.63 Mb)
PER document (pdf 6.17 Mb)
Appendix 1 - Environmental Management Plan (pdf 1.84 Mb)
Appendix 2 - Draft Mine Closure Plan (pdf 10.2 Mb) Status: Final Proponent: Tronox Management Pty Ltd Release Date: 4 June 2013 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 3.22 MB)
|
| 1477 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to develop the Western Turner Syncline Stage 2 - B1 and Section 17 deposits located approximately 30 km west of Tom Price in the Shire of Ashburton. The proposal involves open-pit mining of the B1 and S17 iron ore deposits, transport of ore to the existing Western Turner Syncline Section 10 mine (approximately 12 km east of the B1 deposit) and construction/operation of associated infrastructure. Hamersley Iron Pty Limited (a wholly-owned subsidiary of Rio Tinto) is the nominated proponent for the proposal.
Download the proponent's API information:
Main Assessment on Proponent Information document (pdf 5.64 Mb)
Appendices 1 - 10 (zip 28.7 Mb)
Appendices 11 - 22 (zip 37.4 Mb)
Appendices 23 - 31 (zip 32.2 Mb) Status: Final Proponent: Hamersley Iron Pty Limited Release Date: 20 May 2013 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 4.66 MB)
|
| 1476 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to develop and operate an iron ore export facility at Cape Preston East by Iron Ore Holdings Ltd as the proponent.
Download the proponent's API information:
Main Assessment on Proponent Information document (pdf 5.67 Mb)
Appendices 1-4 and 7-9 (zip 4.69 Mb)
Appendix 5 (zip 24.3 Mb)
Appendix 6 - spatial datasets (zip 3.6 Mb) Status: Final Proponent: Iron Ore Holdings Ltd Release Date: 20 May 2013 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.65 MB)
|
| 1475 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to develop a commercial-scale algae farm and processing facilities by Aurora Algae Pty Ltd.
Download the proponent's API information:
Main Assessment on Proponent Information document (pdf 10.1 Mb)
Appendices to the API document (zip 29.7 Mb) Status: Final Proponent: Aurora Algae Pty Ltd Release Date: 20 May 2013 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.71 MB)
|
| 1474 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to develop and operate the West Pilbara Iron Ore Project Stage 2 – Hardey Proposal by API Management Pty Limited.
API documentation downloads
West Pilbara Iron Ore Project Stage 2 Hardey Proposal API (pdf 3.18 Mb)
Development envelopes - spatial information (pdf 1.56 Mb)
Referral Appendix 1 - Drilling Bore Completion and Groundwater Modelling Report (pdf 18.6 Mb)
Referral Appendix 2 - Noise Impact Assessment (pdf 2.4 Mb)
Referral Appendix 3 - Particulate Modelling Assessment for Proposed Mining Operations 15 Mtpa Scenario (pdf 1.97 Mb)
Referral Appendix 4 - An investigation into the Soils and Soil Landscapes of the Hardey Project Area (pdf 35 Mb)
Referral Appendix 5 - Hardey Subterranean Fauna Sampling Programme (pdf 7.62 Mb)
Referral Appendix 6 - Aquatic Ecosystem Surveys Pre and Post Wet 2011 (pdf 4.97 Mb)
Referral Appendix 7 - Hardey Rail Corridor and Deposit Level 2 Fauna Survey (pdf 16.3 Mb)
Referral Appendix 8 - Hardey Resource Vegetation and Flora Survey (pdf 12 Mb)
Referral Appendix 9 - Hardey Rail and Borrow Vegetation and Flora Survey (pdf 41.6 Mb)
West Pilbarra Iron Ore Project Stage 2 Hardey Proposal Supporting Information (pdf 31.1 Mb) Status: Final Proponent: API Management Pty Limited Release Date: 13 May 2013 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 5.87 MB)
|
| 1473 | |
| Summary: The Minister for Environment has requested (3 January 2013) that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions relating to the Residential Subdivision on Lots 3000 (formerly Lot 1512) and 1523 Emu Point Drive, Albany proposal (the proposal).
The following is the EPA’s Report and Recommendations to the Minister pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Western Australian Land Authority Release Date: 6 May 2013 No Appeals Click here to view the document (file type: Acrobat PDF file size: 777.82 KB)
|
| 1472 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Gindalbie Metals Ltd to develop an iron ore mine located approximately 68 km south-east of Yalgoo and 30 km north-east of the Greater Karara Iron Ore Project in the Shire of Yalgoo. The mine includes pits, waste dumps and ancillary infrastructure such as a run of mine pad, crushing and screening facilities, workshops, explosives magazine and roads. Status: Final Proponent: Gindalbie Metals Ltd Release Date: 29 April 2013 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 3.86 MB)
|
| 1471 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal for a marina-based tourist development located in Mangles Bay at the southern end of Cockburn Sound by Cranford Pty Ltd and the Western Australian Land Authority. Status: Final Proponent: Cranford Pty Ltd and Western Australian Land Authority Release Date: 29 April 2013 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 5.58 MB)
|
| 1470 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by the Shire of Manjimup to construct, operate and maintain a 6.5 kilometre long all-weather, year-round access track from Windy Harbour Road to Nelson Location 7965, located entirely within the Doggerup Road reserve.
Download Appendix 5 - the Proponent's response to submissions here. (pdf 1.84 Mb) Status: Final Proponent: Shire of Manjimup Release Date: 22 April 2013 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.94 MB)
|
| 1469 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for Environment on the key environmental factors and principles for the proposal by New Energy Corporation Pty Ltd (New Energy), to build and operate a Waste-to-Energy (WtE) and Materials Recovery Facility (MRF) at the Boodarie Strategic Industrial Area, Port Hedland.
The proposed facility would accept various wastes, recover materials that can be economically recycled via the MRF and convert suitable remaining waste to electrical power in a WtE plant.
The proposal is being formally assessed as no plants using the proposed technology currently exist in Western Australia.
Appendices 1-5 form part of the main document.
Download Appendix 6 - Summary of submissions and proponent's response to submissions here (pdf 3.01 Mb) Status: Final Proponent: New Energy Corporation Pty Ltd Release Date: 8 April 2013 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 4.58 MB)
|
| 1468 | |
| Summary: Advice of the Environmental Protection Authority to the Minister for Environment under Section 16(e) of the Environmental Protection Act 1986
On 16 November 2011, the Minister for Environment wrote to the Chairman of the Environmental Protection Authority (EPA) and the Chairman of the Waste Authority, requesting that the two Authorities investigate the environmental and health performance of waste to energy technologies internationally.
This request sought information on:
- legislation for the establishment and operation of waste to energy facilities, focussed on emissions, in jurisdictions where these facilities currently exist;
- current emissions from established and operating best practice facilities; and
- current and historical level of compliance of these facilities.
The Minister requested that the information gathered be from full-scale, commercial plants that process municipal solid waste (MSW) and from a variety of technology types.
To assist with this investigation, WSP Environment and Energy Ltd were engaged to undertake a technical review of waste to energy plants around the world. These technical reports are attached. The reports provide detailed information to address the issues identified by the Minister for Environment. This advice from the EPA and Waste Authority draws on the technical advice to make recommendations that are relevant to the Western Australian situation.
Appendices:
Summary Report – Waste to Energy - A review of legislative and regulatory frameworks, state of the art technologies and research on health and environmental impacts. (pdf 3.93 Mb)
WSP Waste to Energy Technical Report Stage One (pdf 1.16 Mb)
WSP Waste to Energy Technical Report Stage Two (pdf 5.83 Mb)
WSP Waste to Energy Technical Report Stage Three (pdf 581 kb) Status: Final Release Date: 4 April 2013 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.24 MB)
|
| 1467 | |
| Summary: The Minister for Environment requested (28 June 2012) that the Environmental Protection Authority (EPA) inquire into and report to the Minister on the proposed changes to the implementation conditions applicable to the Ord River Irrigation Area Stage 2 (M2 Supply Channel).
This is the EPA’s Report and Recommendations to the Minister pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Minister for State Development Release Date: 31 January 2013 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.18 MB)
|
| 1466 | |
| Summary: The Minister for Environment has requested (31 May 2012) under section 46 of the Environmental Protection Act 1986 (the EP Act) that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions relating to the Voyager Quarry proposal; Lots 11 and 14 Horton Road, The Lakes, Avon Location 1881, Shire of Northam.
This report is the EPA’s Report and Recommendations (No. 1466) to the Minister pursuant to section 46(6) of the EP Act. Status: Final Proponent: BGC (Australia) Pty Ltd Release Date: 23 January 2013 No Appeals Click here to view the document (file type: Acrobat PDF file size: 789.25 KB)
|
| 1465 | |
| Summary: The Minister for Environment requested on 8 July 2012 that the Environmental Protection Authority (EPA) inquire into and report to the Minister on Hamersley Hope Management Services Pty Ltd’s proposed changes to the environmental conditions for the Hope Downs 4 Iron Ore Project.
The following is the EPA’s Report and Recommendations to the Minister pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Hamersley Hope Management Services Pty Ltd Release Date: 14 January 2013 No Appeals Click here to view the document (file type: Acrobat PDF file size: 814.79 KB)
|
| 1464 | |
| Summary: The Minister for Environment requested on 14 December 2012 that the Environmental Protection Authority inquire into and report to the Minister on Chevron Australia Pty Ltd’s proposed changes to the environmental conditions applicable to the Wheatstone Development.
This report is the Environmental Protection Authority’s Report and Recommendations to the Minister pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Chevron Australia Pty Ltd Release Date: 14 January 2013 No Appeals Click here to view the document (file type: Acrobat PDF file size: 819.87 KB)
|
| 1463 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to develop an iron ore mine on the Iron Valley tenement by Iron Ore Holdings Ltd.
Download the proponent's API document here (pdf 8.60 Mb)
Download appendices to the proponent's API document:
Appendix A - EIA Scoping Report (pdf 1.42 Mb)
Appendix B - Iron Valley groundwater assessment (pdf 18 Mb)
Appendix C - Flora and vegetation survey (pdf 12.3 Mb)
Appendix D - Subterranean fauna assessment (pdf 7.06 Mb)
Appendix E - Soils and landforms preliminary studies (pdf 4.29 Mb)
Appendix F - Aboriginal Heritage Enquiry System results (pdf 922 kb)
Appendix G - Acid and metalliferous drainage assessment and management strategy (pdf 356 kb) Status: Final Proponent: Iron Ore Holdings Ltd Release Date: 7 January 2013 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.21 MB)
|
| 1462 | |
| Summary: The Minister for Environment requested on 27 July 2012 that the Environmental Protection Authority (EPA) inquire into and report to the Minister on Chevron Australia Pty Ltd’s proposed changes to the environmental conditions applicable to the Wheatstone Development.
The following is the EPA’s Report and Recommendations (No.1462) to the Minister pursuant to section 46(6) of the Environmental Protection Act 1986.
Download the Meta Economics report Carbon Price Complementarity of WA Greenhouse Gas Requirements here. (pdf 1.26 Mb) Status: Final Proponent: Chevron Australia Pty Ltd Release Date: 17 December 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 956.45 KB)
|
| 1461 | |
| Summary: The Minister for Environment requested (on 6 March 2012 that the Environmental Protection Authority (EPA) inquire into and report to the Minister on Landcorp’s proposed changes to the environmental conditions for the Avon Industrial Park.
This is the EPA’s Report and Recommendations (No. 1461) to the Minister pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Landcorp Release Date: 17 December 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 790.45 KB)
|
| 1460 | |
| Summary: The Minister for Environment requested on 4 November 2012 under section 46 of the Environmental Protection Act 1986 (EP Act) that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions relating to the Oakajee Deepwater Port proposal.
The following is the EPA’s Report and Recommendations (No. 1460) to the Minister pursuant to section 46(6) of the EP Act. Status: Final Proponent: Minister for State Development Release Date: 12 December 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 798.32 KB)
|
| 1459 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Ray Village Aged Services (Inc) trading as Capecare to develop a 1.28 hectare (ha) portion of Armstrong Reserve in Dunsborough for the purpose of constructing an aged care facility.
Download the proponent's response to submissions here (pdf 6.16 Mb) Status: Final Proponent: Ray Village Aged Services (Inc) t/a Capecare Release Date: 10 December 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.95 MB)
|
| 1458 | |
| Summary: On 11 May 2012 the Minister for Environment requested that the Environmental Protection Authority (EPA) inquire into and report to the Minister on Pelsaert Pty Ltd's (formerly Latitude Fisheries Pty Ltd), and W.T.N. Nominees Pty. Ltd. proposed changes to the implementation conditions for the Yellowfin Tuna Aquaculture Trial, Zeewijk Channel, Abrolhos Islands proposal.
This is the EPA's Report and Recommendations (No. 1445) to the Minister pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Pelsaert Pty Ltd Release Date: 10 December 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 2.15 MB)
|
| 1457 | |
| Summary: This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by Hamersley Iron Pty. Limited (Hamersley Iron) to expand the Nammuldi-Silvergrass Iron Ore Project. The original Nammuldi-Silvergrass Iron Ore Project, located approximately 60 kilometres (km) north west of the town of Tom Price in the Pilbara region, was approved on 28 November 2000 and is subject to the requirements of Ministerial Statement 558.
The expansion proposal is expected to increase the production rate to approximately 45 million tonnes per year over a project life of approximately 17 to 20 years. This will occur by widening and deepening the Marra Mamba pits at both Nammuldi and Silvergrass, and mining bedded Brockman ore at Nammuldi. Mining at the two mines would be both above and below the water table.
There would be accompanying increases in the capacity of and relocation of processing facilities and transport infrastructure and an increase in dewatering to access ore below the water table. The existing project is authorised to clear 2,000 hectares (ha) of vegetation. Approximately 3,900 ha of vegetation would be cleared for additional mine pits, waste dumps and associated infrastructure and facilities. Surplus water management would include transferring dewater to approximately 2,500 ha of pastoral land which would be irrigated for agriculture.
Download Appendix 5 - The proponent's response to submissions (pdf 193 kb) Status: Final Proponent: Hamersley Iron Pty Ltd Release Date: 21 November 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.86 MB)
|
| 1456 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to develop and operate an iron ore mine on the Blacksmith tenement in the Pilbara region of Western Australia by Flinders Mines Limited. Status: Final Proponent: Flinders Mines Limited Release Date: 21 November 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 7.34 MB)
|
| 1455 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Brockman Iron Pty Ltd to develop the Brockman Railway Infrastructure Project. The proposed railway will allow Brockman to transport iron ore from the previously approved Brockman Marillana Iron Ore Project to the proposed Multi-User Iron Export (Landside) Facility in Port Hedland.
Download the proponent's API document (pdf 1.31 Mb)
Download the appendices to the proponent's API document (zip 27.4 Mb) Status: Final Proponent: Brockman Iron Pty Ltd Release Date: 19 November 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.29 MB)
|
| 1454 | |
| Summary: The Minister for Environment requested in August 2012 that the Environmental Protection Authority inquire into and report to the Minister on Kemerton Silica Sand Pty Ltd's proposed amendment of Implementation Condition 3-1 for the Kemerton Silica Sand Mining Proposal to extend the time limit for substantially commencing the proposal.
This report is the EPA's Report and Recommendations (No. 1454) pursuant to section 46(6) of the Environmental Protection Act 1986 (the EP Act). Status: Final Proponent: Kemerton Silica Sand Pty Ltd Release Date: 19 November 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.59 MB)
|
| 1453 | |
| Summary: The Minister for Environment has requested (June 2012) that the Environmental Protection Authority (EPA) inquire into and report to the Minister on the City of Greater Geraldton's proposed deletion of the Implementation Conditions and Proponent Commitments for the Narngulu (Meru) Waste Disposal Facility.
This report is the EPA's Report and Recommendations (No. 1453) pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: City of Greater Geraldton Release Date: 12 November 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.05 MB)
|
| 1452 | |
| Summary: The Minister for Environment has requested that the Environmental Protection Authority inquire into and report on the matter of changing Condition 4 of Ministerial Statement 709 to extend the time limit of approval for the substantial commencement of the above proposal.
This is the EPA's Report and Recommendations (No. 1452) to the Minister pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Aspen Parks Property Management Ltd Release Date: 5 November 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 934.71 KB)
|
| 1451 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Robe River Mining Co Pty Ltd to develop seven borrow pits within Millstream Chichester National Park.
Download the proponent's API document. (pdf 4.71 Mb)
Appendices to the API document
Appendix 1 - BPMP (zip 4.02 Mb)
Appendix 2 - Studies undertaken (zip 31.9 Mb)
Appendix 3 - Visual montages of stage one proposed borrow pits (zip 3.42 Mb)
Appendix 4 - Rio Tinto Proposed Offset Package (zip 20.5 Mb) Status: Final Proponent: Robe River Mining Co Pty Ltd Release Date: 29 October 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 6.45 MB)
|
| 1450 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Mr G.M and Mrs C.M White to subdivide Lot 504 Lexia Avenue, Upper Swan into three rural lots.
The proponent has submitted a referral document setting out the details of the proposal, potential environmental impacts and proposed commitments to manage those impacts.
The EPA considers that the proposal, as described, cannot meet the EPA’s environmental objectives for:
a) Specially protected (threatened) fauna;
b) Regionally significant vegetation, wetlands and watercourses; and
c) Surface water quality and quantity.
The EPA has therefore determined under Section 40 of the EP Act that the level of assessment for the proposal is Assessment on Proponent Information (API) Category B (environmentally unacceptable), and this report provides the EPA advice and recommendations in accordance with Section 44 of the EP Act. Status: Final Proponent: Mr G & Mrs C White Release Date: 22 October 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.94 MB)
|
| 1449 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to expand the FerrAus Pilbara Project by FerrAus Pty Limited.
The proponent's API documents are available at http://www.atlasiron.com.au/IRM/content/environment_environmentpublication.html and provided on CD with the printed report. Please contact the Office of the EPA for a copy of the proponent's information on CD. Status: Final Proponent: FerrAus Pty Limited Release Date: 17 September 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 3.55 MB)
|
| 1448 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority to the Minister for Environment on the key environmental factors and principles for the revised proposal by Hamersley Iron Pty. Limited to expand its Yandicoogina Iron Ore Project by developing new iron ore pits at the Junction South West and Oxbow deposits. Hamersley’s existing approved Yandicoogina operations includes the Junction Central and Junction South East deposits and associated infrastructure. An existing railway connects the Yandicoogina mining operations to the Central Pilbara Railway.
Download Appendix 5 to Report 1448: Proponents response to submissions (pdf 2.16 Mb)
Appendix 1: Detailed Hydrology (Stormwater) Study (pdf 15.6 Mb)
Appendix 2: Energy Efficiency Opportunities (pdf 49 kb)
Appendix 3: Preliminary results of geochemical characterisation of Yandicoogina samples (pdf 2.22 Mb)
Appendix 4: Selenium in Waste Materials at Pilbara Operations (pdf 55 kb)
Appendix 5: Yandicoogina Closure Options: Preliminary Water Modelling Results (Please note that this appendix is very large and not available online. Contact the Office of the EPA for the Appendix on CD).
Appendix 6: Yandicoogina Operations Audit Register (pdf 49 Kb)
Appendix 7a: Yandicoogina Fauna Species List (pdf 72 Kb)
Appendix 7b: Yandicoogina JSW & Oxbow Fauna Assemblages by Habitat (pdf 52 Kb)
Appendix 8: Rio Tinto Iron Ore sponsored ARC Linkage Grants (Past, present and future) (pdf 115 Kb)
Appendix 9: Rio Tinto Iron Ore Soil Management Process (pdf 27 Kb)
Appendix 10: Yandicoogina Closure Options - Summary of water and salt balance modelling (pdf 58 Kb)
Appendix 11: Update report – baseline hydrology assessment for Yandi discharge (pdf 5.12 Mb)
Appendix 12: Synthesis of discharge impacts on Marillana and Weeli Wolli Creeks (pdf 2.61 Mb)
Appendix 13: Marandoo Phase II Coolibah Soil Moisture Investigation (pdf 8.07 Mb)
Appendix 14: Review of flora and vegetation along Weeli Wolli, Mindy Mindy and Coondiner creeklines (Mattiske 2011) (pdf 2.36 Mb)
Appendix 15: Drawdown and discharge impact figures (pdf 7.65 Mb) Status: Final Proponent: Hamersley Iron Pty. Limited Release Date: 27 August 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 6.87 MB)
|
| 1447 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the strategic proposal to develop Bayonet Head for urban purposes (Bayonet Head Plan for Development) by Lowe Pty Ltd, Housing Authority, MB and EM Cameron, K Slee, M Greer and the City of Albany.
The Bayonet Head Plan for Development was referred to the EPA, and has been assessed as a strategic proposal as it identifies a future staged urban subdivision and urban development of land, with each stage subject to consideration as a derived proposal under section 39B of the Environmental Protection Act 1986.
The pdf of the report includes the proponent's response to submissions as Appendix 5.
Status: Final Proponent: Lowe Pty Ltd; Housing Authority; K Slee; E and M Cameron; M Greer; City of Albany Release Date: 13 August 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 12.33 MB)
|
| 1446 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to develop and operate an open-cut vanadium mine and process plant by Reed Resources Ltd.
This pdf of the report includes the proponent's response to submissions as Appendix 5.
Status: Final Proponent: Reed Resources Ltd Release Date: 13 August 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 4.27 MB)
|
| 1445 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to establish and operate a multi-user deepwater port with iron ore stockpiling, transfer and ship loading facilities at Anketell Point. The Proposal by API Management Pty Limited allows for facilities required by API and future third parties to be developed.
Download Appendix 5 - Proponent's response to submissions here. (pdf 12.5 Mb) Status: Final Proponent: API Management Pty Limited Release Date: 30 July 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 3.42 MB)
|
| 1444 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the strategic proposal referred by the Minister for State Development to develop a liquefied natural gas (LNG) processing precinct at James Price Point, 60 kilometres north of Broome.
It is the EPA’s view that the proposed LNG precinct could be implemented at James Price Point such that the EPA’s objectives could be met, provided that strict environmental management conditions and appropriate offsets, as recommended in this report, are applied.
Download appendices:
Appendix 5 - Proponents response to submissions (pdf 4.84 Mb)
Appendix A to the Response to submissions, Q & A (pdf 4.06 Mb)
Appendix 6 - Palaeontology Survey of the Broome Sandstone (pdf 5.98 Mb)
Letter to Dr Paul Vogel from DSD on the dinosaur footprint survey (pdf 580 kb)
Appendix 7 - Browse Bilby Review (pdf 3.81 Mb)
Peer review of the Browse Bilby Review (pdf 38.1 kb)
Appendix 8 - 43A Application – Integrated Marine Facility (pdf 713 kb)
App 8: Attachment 1 (pdf 5.36 Mb)
App 8: Attachment 2 (pdf 1.01 Mb)
App 8: Attachment 3 (pdf 592 kb)
App 8: Attachment 4 (pdf 160 kb)
App 8: Attachment 5 (pdf 168 kb)
Appendix 9 - Additional information on underwater noise (pdf 46 kb)
Underwater noise modelling assessment (pdf 379 kb)
Appendix 10 - Section 43A Application - Change in dredging volume (pdf 3.63 Mb)
Report on sediment impact thresholds developed for James Price Point nearshore benthic communities (pdf 1.39 Mb)
Letter from DSD to Dr Paul Vogel regarding assessment of dredging impacts (pdf 184 kb) Status: Final Proponent: Minister for State Development Release Date: 16 July 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 5.18 MB)
|
| 1443 | |
| Summary: This report fulfils a requirement under the current Ministerial approval statement for the Forest Management Plan 2004-2013 for the Environmental Protection Authority to provide public reports to the Minister on the midterm and end-of-term audits. Status: Final Proponent: Conservation Commission Release Date: 22 June 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.39 MB)
|
| 1442 | |
| Summary: The Minister for Environment has requested (23 June 2011) that the Environmental Protection Authority (EPA) inquire into and report to the Minister on the Water Corporation’s proposed changes to the environmental conditions for the Augusta Wastewater Treatment Plant. This is the EPA’s Report and Recommendations (No. 1442) to the Minister pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Water Corporation Release Date: 18 June 2012 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.28 MB)
|
| 1441 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Sinosteel Midwest Corporation Limited to develop an iron ore mine and associated infrastructure at Weld Range.
Download the proponent's response to submissions. (pdf 10.7 Mb)
Download the Flora Data Addendum (pdf 8.99 Mb)
Download the Dust Management Plan. (pdf 889 kb)
Download the Fire Management Plan (pdf 4.52 Mb)
Download the proponent's response to the EPA's request for more information (pdf 7.17 Mb)
Download Appendices A - P (zip 46.6 Mb) Status: Final Proponent: Sinosteel Midwest Management Pty Ltd Release Date: 18 June 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.29 MB)
|
| 1440 | |
| Summary: The Minister for Environment has requested (30 May 2012) that the Environmental Protection Authority inquire into and report to the Minister on Chevron Australia Pty Ltd’s proposed changes to the environmental conditions for the Wheatstone Development (Gas Processing, Export Facilities and Infrastructure, Shire of Ashburton and Roebourne). This report is the EPA’s Report and Recommendations to the Minister pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Chevron Australia Pty Ltd Release Date: 5 June 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.32 MB)
|
| 1439 | |
| Summary: The Minister for Environment has requested (27 March 2012) that the Environmental Protection Authority (EPA) inquire into and report to the Minister on Roy Hill Iron Ore Pty Ltd’s proposed changes to the environmental conditions for the Roy Hill 1 Iron Ore Mining Project. This report is the EPA’s Report and Recommendations to the Minister pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Roy Hill Iron Ore Pty Ltd Release Date: 5 June 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.28 MB)
|
| 1438 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Cliffs Asia Pacific Iron Ore Pty Ltd to develop an iron ore mine and haul road known as the Windarling Range W4 East Deposit 130 kilometres north of Southern Cross.
The proponent's API document is available on their website. Status: Final Proponent: Cliffs Asia Pacific Iron Ore Pty Ltd Release Date: 28 May 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.1 MB)
|
| 1437 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by Toro Energy Limited to develop the Wiluna Uranium Project to mine the Centipede deposit 30 km south and Lake Way deposit 15 km south-east of Wiluna in Western Australia.
Download the proponent's response to submissions (pdf 3.39 Mb)
Appendices
Appendix A - Water (pdf 631 Mb)
Appendix B - Mine Dewatering (pdf 1.67 Mb)
Appendix C - Mine Closure and Tailings (pdf 12.5 Mb)
Appendix D - Radiation (pdf 3.20 Mb)
Appendix E - Subterranean fauna (pdf 9.63 Mb)
Appendix F - Tecticornia (pdf 5.23 Mb)
Download the ERMP documentation from Toro Energy's website. Status: Final Proponent: Toro Energy Ltd Release Date: 21 May 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 4.29 MB)
|
| 1436 | |
| Summary: This report is the EPA's Report and Recommendations to the Minister for Environment on Karara Mining Limited's proposed changes to the environmental conditions for the Karara Iron Ore and Mungada Iron Ore Projects, pursuant to section 46(6) of the Environmental Protection Act 1986. Status: Final Proponent: Karara Mining Ltd Release Date: 26 March 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.52 MB)
|
| 1435 | |
| Summary: The City of Busselton wishes to replace the existing environmental conditions related to the management of noise at the Busselton Regional Aerodrome with conditions that give a greater emphasis to management of noise through an agreed Noise Management Plan.
Section 46(6) of the Environmental Protection Act 1986 requires the EPA to report to the Minister for Environment on whether or not the proposed changes to conditions and procedures should be allowed. In addition, the EPA may make recommendations as it sees fit.
This report provides the EPA’s advice and recommendations to the Minister for Environment on the key environmental factors, conditions and procedures for the proposal. Status: Final Proponent: City of Busselton Release Date: 26 March 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 2.87 MB)
|
| 1434 | |
| Summary: The Environmental Protection Authority has completed its assessment of the application to amend the Environmental Protection (Western Power Transmission Substation Noise Emissions) Approval 2005 made by Western Power to the Minister for Environment on 21 September 2011.
The application was referred to the EPA for assessment under regulation 17(9) of the Environmental Protection (Noise) Regulations 1997 (Regulations). Status: Final Proponent: Western Power Release Date: 26 March 2012 No Appeals Click here to view the document (file type: Acrobat PDF file size: 3.63 MB)
|
| 1433 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to deepen the mining of the Windarling Range W3/5 Deposit to below the watertable by Cliffs Australia Pacific Iron Ore Pty Ltd.
Download Appendix 3 Proponent's API document (pdf 21.2 Mb) Status: Final Proponent: Cliffs Asia Pacific Iron Ore Pty Ltd Release Date: 12 March 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 3.29 MB)
|
| 1432 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal by LG and HM McDonald, trading as Exmouth Quarries and Concrete, to make a small scale expansion to a previously mined limestone quarry on mining lease 08/06 sub lease 3H/034. The holder of mining lease 08/06 is Alcoa of Australia Ltd. The proposal area is located eight kilometres southwest of the Exmouth town on the eastern side of the Cape Range peninsula, within the Shire of Exmouth.
Download Appendix 3 - API documentation and Proponent's response to submissions (zip 5.77 Mb) Status: Final Proponent: LG and HM McDonald Release Date: 27 February 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 1.21 MB)
|
| 1431 | |
| Summary: This report provides the Environmental Protection Authority’s advice and recommendations to the Minister for Environment on the proposal to construct and operate a seawater desalination plant at Cape Riche by Grange Resources Limited.
Appendix 5
Download the proponent's response to submissions (pdf 5.56 Mb)
Download the Construction Environmental Management Plan (pdf 1.23 Mb)
Download the Operational Environmental Management Plan (pdf 1.61 Mb)
Download the Brine Discharge Management Plan (pdf 1.31 Mb) Status: Final Proponent: Grange Resources Release Date: 13 February 2012 Appeals Closed Click here to view the document (file type: Acrobat PDF file size: 2.31 MB)
|