| No. | Report |
|---|
| 1230 | |
| Summary: This report provides the Environmental Protection Authority's (EPA's) advice to the Minister for the Environment under section 16(e) of the Environmental Protection Act 1986 and the Western Australian Planning Commission (WAPC) on the proposal by Fremantle Ports and the Department for Planning and Infrastructure (FP/DPI) to develop a new port facility and related transport infrastructure for container trade and general cargo in Cockburn Sound. Status: Final Proponent: Fremantle Ports/Department for Planning and Infrastructure Release Date: 25 September 2006 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.03 MB)
|
| 1229 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the proposal by Korean Steel Pty Ltd (Korean Steel) to establish materials stockpiling and handling facilities with a capacity of approximately 4 million tonnes at Cape Preston, approximately 60km west-south-west of Dampier. Status: Final Proponent: Korean Steel Pty Ltd Release Date: 11 September 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.57 MB)
|
| 1228 | |
| Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the proposal by Woodside Energy Ltd to develop Industrial Land on the Burrup Peninsula. Status: Final Proponent: Woodside Energy Ltd Release Date: 4 September 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 2.51 MB)
|
| 1227 | |
| Summary: City of Albany Town Planning Scheme No. 3 Amendment 247 Amending the Subdivision Guide Plan and Modifying various Provisions associated with Development Exclusion Areas, Caretakers Dwellings, Development Approval and road alignments within Conservation Zone No. 1. Status: Final Proponent: City of Albany Release Date: 28 August 2006 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1004.37 KB)
|
| 1226 | |
| Summary: Proposal to expand its iron ore operations at Dampier Port, which includes Parker Point and East Intercourse Island facilities to a total of 120 Megatonnes per annum by greater utilisation of existing equipment, and an increase in rail transport and shipping movements, as documented in schedule 1 of this statement. Status: Final Proponent: Hamersley Iron Pty Ltd Release Date: 21 August 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 51.58 KB)
|
| 1225 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the proposal by Hamersley Iron Pty Ltd (HI) to undertake both capital and maintenance dredging within the Port of Dampier in the vicinity of the Company's Parker Point and East Intercourse Island iron ore export loading facilities. Status: Final Proponent: Hamersley Iron Pty Ltd Release Date: 7 August 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.17 MB)
|
| 1224 | |
| Summary: Greendene Development Corporation Pty Ltd proposes to subdivide an area of land (Locations 9002 and 9101) within the developing Riverslea residential area, one kilometre east of the Margaret River townsite. Status: Final Proponent: Greendene Development Corporation Pty Ltd Release Date: 10 July 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 920.37 KB)
|
| 1223 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the proposal by Alinta Cogeneration (Wagerup) Pty Ltd (Alinta) to construct a gas fired power station producing 350 megawatts (MW) of electrical power and 460 tonnes per hour of steam at the Alcoa Alumina Refinery at Wagerup. Status: Final Proponent: Alinta Cogeneration (Wagerup) Pty Ltd Release Date: 12 June 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 2.31 MB)
|
| 1222 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the proposal to develop a residential subdivision in the north-west sector of Herdsman Lake (Floreat Lakes) was approved in 1989. Status: Final Proponent: Sherwood Overseas Co Pty Ltd Release Date: 12 June 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 2.07 MB)
|
| 1221 | |
| Summary: Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Status: Final Proponent: Chevron Australia Pty Ltd Release Date: 6 June 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 6.32 MB)
|
| 1220 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by Murchison Metals Ltd to mine iron ore (haematite) at Jack Hills. Status: Final Proponent: Murchison Metals Ltd (MML) Release Date: 22 May 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 2.22 MB)
|
| 1219 | |
| Summary: CSR Gyprock Fiber Cement proposes to mine a 53 ha area and process approximately 1.3 million tones of gypsum recovered from Mining Lease M70/1161 using the facilities currently employed for operations in the adjacent Mining Lease M70/750. Status: Final Proponent: CSR Gyprock Fibre Cement Release Date: 10 May 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 4.6 MB)
|
| 1218 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the proposal by West Australian Landfill Services Pty Ltd (WALS) to modify the footprint of the South Cardup landfill. Status: Final Proponent: West Australian Landfill Services Pty Ltd Release Date: 24 April 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 6.74 MB)
|
| 1217 | |
| Summary: Iluka Resources Limited (Iluka) proposes to develop a mineral sand mine 1 km north of the township of Waroona. The major components of the proposed operation includes: 3 new mine pits, solar drying dams, ore concentrator, associated mine infrastructure and upgrade to Peel Road and intersection of Peel Road and South West Highway. Status: Final Proponent: Iluka Resources Limited Release Date: 10 April 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 6.35 MB)
|
| 1216 | |
| Summary: Fortescue Metals Group Limited (FMG) proposes to develop an iron ore mine north of the town of Newman at Cloud Break, to integrate with the previously assessed and approved Stage A and Stage B iron ore projects. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal. Status: Final Proponent: Fortescue Metals Group Limited Release Date: 30 January 2006 Appeals close Click here for more information
|
| 1215 | |
| Summary: Alcoa World Alumina Australia (Alcoa) proposes to expand the Wagerup Refinery through construction of a third production unit. The proposed production increase to approximately 4.7 million tonnes per annum of alumina is to be achieved by a combination of new equipment and an upgrade of existing equipment in order to achieve an increase in both capacity and efficiency. The Refinery currently operates at about 2.4 million tonnes per annum. Status: Final Proponent: Alcoa World Alumina Australia Release Date: 5 January 2006 Appeals close Click here for more information
|
| 1214 | |
| Summary: Hamersley Iron Pty Limited (HI) proposes to develop a new open cut iron ore mine in the Central Pilbara area. The major components of the proposed operation includes: 3 mine pits; dry processing plant; associated mine infrastructure and extension to the Brockman 2 rail spur. Status: Final Proponent: Hamersley Iron Pty Limited Release Date: 5 January 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1002.38 KB)
|
| 1213 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by Tectonic Resources NL to undertake mining in the areas of Trilogy on mining lease M74/176 and Kundip on mining leases M74/41, M74/51, M74/53, M74/135, M74/121, P74/153 and L74/34, construct a haul road within M74/176, M74/51 and Gazetted Road No. 8432, upgrade the processing plant situated east of Ravensthorpe on M74/13, and discharge process tailings to the existing pit on M74/13. Status: Final Proponent: Tectonic Resources NL Release Date: 5 January 2006 Appeals close Click here to view the document (file type: Acrobat PDF file size: 8.3 MB)
|
| 1212 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the proposals relevant environmental factors. The proposal by Iluka Resources Limited (Iluka) is to establish a mineral sands mine in the Cataby area, Shire of Dandaragan, approximately 150km north of Perth. Status: Final Proponent: Iluka Resources Limited Release Date: 9 December 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 4.41 MB)
|
| 1211 | |
| Summary: Gunson Resources Limited proposes to develop the Coburn Mineral Sand Project, 84
kilometres (km) south-east of Denham in the Shire of Shark Bay. Status: Final Proponent: Gunson Resources Limited Release Date: 5 December 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 2.19 MB)
|
| 1210 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by BHP Billiton Iron Ore Pty Ltd (BHPBIO) to expand existing mining operations at Orebody 25 Mine (OB25), within mining lease (ML) 244SA. Status: Final Proponent: BHP Billiton Iron Ore Pty Ltd Release Date: 28 November 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 2.6 MB)
|
| 1209 | |
| Summary: Worsley Alumina Pty Ltd (Worsley) proposes to upgrade the Worsley refinery in order to increase production to 4.4 million tonnes per annum (Mtpa). Worsley has approval under Part IV of the Environmental Protection Act, 1986 for production of 3.7Mtpa, and the refinery currently operates at 3.25Mtpa. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal.
Status: Final Proponent: Worsley Alumina Pty Ltd Release Date: 28 November 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.35 MB)
|
| 1208 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by Dampier to Bunbury Natural Gas Pipeline (DBNGP) (WA) Nominees Pty Limited, the proponent, to construct and operate a 194-kilometre pipeline from Compressor Station (CS) 1, south of Karratha, to CS 9, north of Gingin. The proposal is known as the Northern Looping Project, and comprises loops 1 to 9. Status: Final Proponent: Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited Release Date: 30 November 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 6.58 MB)
|
| 1207 | |
| Summary: The Western Australian Planning Commission proposes to amend reservations and zonings in the Metropolitan Region Scheme (MRS)(Amendment 1029/33) consistent with the Alkimos-Eglinton Structure Plan. This report provides the Environmental Protection Authority's (EPA's) advice to the Minister for the Environment on the environmental factors, conditions and procedures relevant to the proposed scheme amendment. Status: Final Proponent: Western Australian Planning Commission Release Date: 21 November 2005 Appeals close Click here for more information
|
| 1206 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by Dampier to Bunbury Natural Gas Pipeline (DBNGP) (WA) Nominees Pty Limited, the proponent, to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10.
Status: Final Proponent: Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited Release Date: 21 November 2005 Appeals close Click here for more information
|
| 1205 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by Argyle Diamond Mines Pty Limited (Argyle) to develop an underground mine and associated infrastructure, which will be located at their current open cut diamond mine site. Status: Final Proponent: Argyle Diamond Mines Pty Limited Release Date: 14 November 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 855.68 KB)
|
| 1204 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the proposal by Dampier to Bunbury Natural Gas Pipeline (DBNGP) (WA) Nominees Pty Limited to construct and operate a 5 kilometre (km) pipeline connecting at Main Line Valve (MLV) 154/155, on the Dampier to Bunbury Natural Gas Pipeline to supply gas to the Kemerton Power Station. Status: Final Proponent: Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited Release Date: 31 October 2005 Appeals close Click here for more information
|
| 1203 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by Aztec Resources Limited, the proponent, to manage existing contamination within the project area, develop an iron ore mine, and construct associated infrastructure and a port facility on Koolan Island. Status: Final Proponent: Aztec Resources Limited Release Date: 7 November 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.73 MB)
|
| 1202 | |
| Summary: Fortescue Metals Group Limited (FMG) proposes to develop iron ore mines north of the town of Newman at Christmas Creek and Mindy Mindy, a beneficiation plant at Christmas Creek, a borefield, a 111 kilometre east-west railway system to connect the Christmas Creek mine to the north-south railway to Port Hedland (Figure 1) and an accommodation village. Status: Final Proponent: Fortescue Metals Group Limited Release Date: 31 October 2005 Appeals close Click here for more information
|
| 1201 | |
| Summary: On 13 September 2005, the Minister requested the Environmental Protection Authority (EPA) to inquire into the amendment of the conditions of statement 614 (dated 6 December 2002) resulting from the splitting of the proposal for an Ammonia-Urea Plant on the Burrup Peninsula. Status: Final Proponent: Dampier Ammonia Pty Ltd Release Date: 31 October 2005 Appeals close Click here for more information
|
| 1200 | |
| Summary: Tropical Timber Plantations Pty Ltd (TTP) propose to establish a tropical timber plantation of approximately 900 hectares (ha) within the Beagle Bay Aboriginal Reserve on the Dampier Peninsula. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal. Status: Final Proponent: Tropical Timber Plantations Pty Ltd Release Date: 24 October 2005 Appeals close Click here for more information
|
| 1199 | |
| Summary: Section 16(e) report and recommendations of the Environmental Protection Authority. The Environmental Protection Authority (EPA) has been requested by the Minister for the Environment to provide advice under section 16(e) of the Environmental Protection Act 1986 on managed aquifer recharge (MAR) using treated wastewater on the Swan Coastal Plain. Status: Final Release Date: 10 October 2005 No Appeals Click here to view the document (file type: Acrobat PDF file size: 1.72 MB)
|
| 1198 | |
| Summary: The Minister for the Environment has requested the Environmental Protection Authority (EPA) to consider and provide advice, under Section 46(1) of the Environmental Protection Act 1986 (EP Act), on the conditions for fauna management for the construction of the gas pipeline to the Nifty Copper Operations post-October, should construction not be completed. The proponent, Birla (Nifty) Pty Ltd, has approval under statement 676, and construction commenced in September, and trenching and laying of the pipeline is planned to be completed by 31 October 2005. Status: Final Proponent: Birla (Nifty) Pty Ltd Release Date: 3 October 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 35 KB)
|
| 1197 | |
| Summary: The Western Australian Planning Commission (WAPC) proposes to reserve an area of 201 hectares (ha) of Stakehill Swamp, Baldivis for Parks and Recreation (P&R) in the Metropolitan Region Scheme (MRS). This report provides the Environmental Protection Authority's (EPA's) advice to the Minister for the Environment on the environmental factors, conditions and procedures relevant to the proposed scheme amendment. Status: Final Proponent: Western Australian Planning Commission Release Date: 24 October 2005 Appeals close Click here for more information
|
| 1196 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the EPA's review of the Water Corporation's (the Corporation's) Wungong Catchment Environment and Water Management Project (the project) under Section 16 (e) and (j) of the Environmental Protection Act 1986 (the EP Act). Status: Final Proponent: Water Corporation Release Date: 19 September 2005 No Appeals Click here to view the document (file type: Acrobat PDF file size: 365.82 KB)
|
| 1195 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by Hamersley Iron Pty Limited (Hamersley), the proponent, to mine a section of the Yandicoogina Channel Iron Deposit (CID). Status: Final Proponent: Hamersley Iron Pty Limited Release Date: 5 September 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 880.74 KB)
|
| 1194 | |
| Summary: APH Contractors proposes to extend the existing sandpit on Lot 2 Calinup Road,
Gelorup, approximately 12 km south of Bunbury. This report provides the
Environmental Protection Authority's (EPA's) advice and recommendations to the
Minister for the Environment on the environmental factors relevant to the proposal. Status: Final Proponent: APH Contractors Release Date: 29 August 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 5.51 MB)
|
| 1193 | |
| Summary: The Minister for the Environment has requested the Environmental Protection Authority (EPA) to consider and provide advice, under Section 46(1) of the Environmental Protection Act 1986, on whether the conditions of the implementation of Ridgepoynt Pty Ltd's
(Ridgepoynt) proposal, to remediate the Tonkin Park Industrial site by containment of the waste on-site in a cell, should be changed. Specifically, the conditions regarding the timeline for implementation, ongoing monitoring of the groundwater and ongoing management of the cell are to be reviewed. Status: Final Proponent: Ridgepoynt Pty Ltd Release Date: 29 August 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.93 MB)
|
| 1192 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the revised proposal by Ridgepoynt Pty Ltd (Ridgepoynt) to change the dimensions of the containment cell involved in the remediation of the Tonkin Park Stage II site. Status: Final Proponent: Ridgepoynt Pty Ltd Release Date: 29 August 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 489.05 KB)
|
| 1191 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by Hamersley Iron Pty Limited (Hamersley Iron) to expand its iron ore operations at Dampier Port from 95 million tonnes per annum (Mtpa) to 120 Mtpa. Status: Final Proponent: Hamersley Iron Pty Limited Release Date: 15 August 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 4.79 MB)
|
| 1190 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by NewGen Power Pty Ltd (NewGen) to construct and operate a nominal 320 megawatt (MW) base-load combined cycle gas turbine (CCGT) power station situated in Kwinana. Status: Final Proponent: NewGen Power Pty Ltd Release Date: 8 August 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 4.88 MB)
|
| 1189 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the proposal by Worsley Alumina Pty Ltd (WAPL) to construct and operate two gas fired co-generation units each producing 120 megawatts (MW) of electrical power and 210 MW of steam at the alumina refinery at Worsley. Status: Final Proponent: Worsley Alumina Pty Ltd Release Date: 8 August 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 4.18 MB)
|
| 1188 | |
| Summary: The Department of Environment (DoE), on behalf of the WRC, submitted the Annual Compliance Report for Environmental Management of Groundwater Abstraction from the Jandakot Mound July 2003-June 2004 to the EPA in November 2004 (Department of Environment 2004). Status: Final Proponent: Water and Rivers Commission Release Date: 22 August 2005 No Appeals Click here to view the document (file type: Acrobat PDF file size: 828.86 KB)
|
| 1187 | |
| Summary: The Department of Environment (DoE), on behalf of the WRC, submitted the Annual Compliance Report for Environmental Management of Groundwater Abstraction from the Gnangara Mound July 2003-June 2004 to the EPA in November 2004 (Department of Environment 2004). Status: Final Proponent: Water and Rivers Commission Release Date: 22 August 2005 No Appeals Click here to view the document (file type: Acrobat PDF file size: 859.65 KB)
|
| 1186 | |
| Summary: Australian Gold Reagents Pty Ltd (AGR) proposes to expand the capacity of its solid sodium cyanide manufacturing plant from 25 000 tonnes per annum (tpa) to 45 000 tpa. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal. Status: Final Proponent: Australian Gold Reagents Pty Ltd Release Date: 25 July 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.34 MB)
|
| 1185 | |
| Summary: Cable Sands (WA) Pty Ltd proposes to mine Mineral Sands at Gwindinup, which is located within the Shire of Capel, approximately 25km south south east of Bunbury and 2km-10km south of the town of Boyanup. Status: Final Proponent: Cable Sands (WA) Pty Ltd Release Date: 6 July 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 6.35 MB)
|
| 1184 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the revised proposal by the Esperance Port Authority (EsPA) to increase iron ore export from the Esperance Port at a rate of up to 8 million tonnes per annum (Mtpa). Status: Final Proponent: Esperance Port Authority Release Date: 4 July 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 4.62 MB)
|
| 1183 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the revised proposal by Kemerton Silica Sands Pty Ltd (KSS) to transfer the ownership of approximately 17ha of land (Area 1) that contains the Muchea Limestone Communities Threatened Ecological Community (TEC) to the conservation estate and to extract silica sands from two parcels of land (Area 2 and Area 3) which total approximately 13ha. Status: Final Proponent: Kemerton Silica Sand Pty Ltd Release Date: 27 June 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 7.88 MB)
|
| 1182 | |
| Summary: CSBP Limited (CSBP) proposes to expand the capacity of its Ammonium Nitrate Production Facility (ANPF) at Kwinana from approximately 235,000 tonnes per annum (tpa) to approximately 580,000 tpa. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal. Status: Final Proponent: CSBP Limited Release Date: 27 June 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 2.72 MB)
|
| 1180 | |
| Summary: This report provides the Environmental Protection Authority's (EPA's) advice to the Minister for the Environment; Science on the proposal by Mr D J & Mrs R Winter to subdivide Lot 1613 Barrett Street, Southern River. Status: Final Proponent: Mr D J & Mrs R Winter Release Date: 13 June 2005 Appeals close Click here to view the document (file type: Acrobat PDF file size: 703.9 KB)
|