| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the proposal to subdivide Lot 502 North Lake, Sudlow and Phoenix Roads, Bibra Lake, for industrial and mixed business purposes. The proponent for the proposal is the Western Australian Land Authority trading as LandCorp (LandCorp). Status: Final Proponent: Western Australian Land Authority trading as LandCorp Release Date: 27 November 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 215.25 KB)
|
| 998 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the proposal by Nebru Nominees Pty Ltd to clear approximately 265 hectares of native vegetation for the establishment of Tagasaste, a perennial fodder crop species. The area of vegetation proposed for clearing is located on the proponent's farming property, Swan Locations 5434 and 5433, near Mogumber West Road approximately 35 kms north of Gingin. The area is part of a formerly more extensive area of native vegetation recommended for reservation and protection by the EPA through the 1983 System 6 Recommendations. Status: Final Proponent: Nebru Nominees Pty Ltd Release Date: 4 December 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.38 MB)
|
| 997 | |
| Summary: Hamersley Iron Pty Limited proposes to develop two iron ore deposits (Nammuldi and Silvergrass) near its current Brockman No. 2 iron ore mine. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal. Status: Final Proponent: Hamersley Iron Pty Ltd Release Date: 16 October 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 425.28 KB)
|
| 996 | |
| Summary: Magellan Metals Pty Ltd proposes to develop an open-cut lead carbonate mine and processing facilities approximately 30 kilometres west of the Wiluna townsite to produce a lead concentrate. The lead concentrates will be refined at the Wiluna minesite to produce lead metal, or alternatively will be transported by road to the Geraldton Port and exported. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal. Status: Final Proponent: Magellan Metals Pty Ltd Release Date: 18 September 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 640.92 KB)
|
| 995 | |
| Summary: This report provides the Environmental Protection Authority's (EPA's) advice to the Minister for Environment on the proposal by Main Roads Western Australia (MRWA) to construct an inter-regional road, on the eastern side of the Peel-Harvey Estuary, to bypass Mandurah. The proposal extends from the southern most portion of the proposed Kwinana Freeway at Stock Road, Lakelands (near Mandurah) south to where it intersects Old Coast Road approximately 2.5 km north of Johnston Road. Status: Final Proponent: Main Roads Western Australia Release Date: 18 September 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.06 MB)
|
| 994 | |
| Summary: The Western Australian Planning Commission (WAPC) has prepared a Region Scheme for the Peel Region, known as the Peel Region Scheme (PRS), pursuant to the Western Australian Planning Commission Act. The WAPC, the Responsible Authority, proposes to recommend to the Hon Minister for Planning that the PRS be submitted to Parliament for final approval. Status: Final Proponent: WA Planning Commission Release Date: 18 September 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1017.28 KB)
|
| 993 | |
| Status: Final Proponent: Wesfarmers LPG Pty Ltd Release Date: 18 September 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.01 MB)
|
| 992 | |
| Status: Final Proponent: WA Planning Commission Release Date: 18 September 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 2.3 MB)
|
| 991 | |
| Status: Final Release Date: 11 September 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.72 MB)
|
| 990 | |
| Status: Final Proponent: Tiwest Pty Ltd Release Date: 4 September 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 3.39 MB)
|
| 989 | |
| Status: Final Proponent: Esperance Port Authority Release Date: 4 September 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 6.82 MB)
|
| 988 | |
| Status: Final Proponent: Wesfarmers Sugar Co PL, Marubeni Corp and Water Corp of WA Release Date: 28 August 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 3.85 MB)
|
| 987 | |
| Status: Final Proponent: Western Australian Planning Commission Release Date: 28 August 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.19 MB)
|
| 986 | |
| Status: Final Proponent: Shire of Northampton Release Date: 28 August 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 3.34 MB)
|
| 985 | |
| Status: Final Proponent: Syntroleum Sweetwater Release Date: 28 August 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 8.68 MB)
|
| 984 | |
| Summary: Derby Hydro Power Pty Ltd proposes to construct and operate a tidal power station in Doctors Creek near Derby and construct 450 kilometres (km) of new transmission lines to supply the power requirements of Broome, Derby, Fitzroy Crossing and Blendevale. The EPA reported to the Minister on this proposal in Bulletin 942, June 1999 and provided its advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal. Status: Final Proponent: Derby Hydro Power Pty Ltd Release Date: 7 August 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 258.84 KB)
|
| 983 | |
| Status: Final Proponent: Dept. of Conservation and Land Management Release Date: 30 July 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 584.08 KB)
|
| 982 | |
| Status: Final Proponent: Agriculture Western Australia Release Date: 24 June 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.57 MB)
|
| 981 | |
| Status: Final Proponent: Placer (Granny Smith) Pty Limited Release Date: 24 June 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 746.18 KB)
|
| 980 | |
| Status: Final Proponent: Mr D and Mrs W Johnston Release Date: 24 June 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.56 MB)
|
| 979 | |
| Summary: The proponent has notified to clear approximately 266 hectares (ha) of native vegetation on Fitzgerald Locations 470, 525, 527, 557 and 1480, north-west of Salmon Gums, Shire of Esperance. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal. Status: Final Proponent: Mr Gregory Kenney Release Date: 14 June 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 218.31 KB)
|
| 977 | |
| Status: Final Proponent: Cable Sands (Wa) Pty Ltd Release Date: 9 June 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 3.01 MB)
|
| 1027 | |
| Summary: This report provides the EPA's advice and recommendations to the Minister for the Environment and Heritage on the environmental factor, conditions and procedures relevant to the proposed variation to conditions. Status: Final Proponent: Simcoa Operations Pty Ltd Release Date: 3 September 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.1 MB)
|
| 1026 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the factors relevant to a proposal by the Waste Management Division of the Department of Environmental Protection (DEP) to remediate three contaminated properties, located on Morangup Road in Toodyay. Status: Final Proponent: Department of Environmental Protection Release Date: 20 August 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 81.18 KB)
|
| 1025 | |
| Summary: Anaconda Nickel Ltd ('the proponent') proposes to develop the Mt Margaret Nickel-Cobalt Project ('the proposal') located approximately 300 kilometres north of Kalgoorlie. This report provides the Environmental Protection Authority's (EPA) advice and recommendations to the Minister for the Environment and Heritage on the environmental factors relevant to the proposal. Status: Final Proponent: Anaconda Nickel Limited Release Date: 6 August 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 3.13 MB)
|
| 1024 | |
| Summary: Hope Downs Management Services Pty Ltd (HDMS) proposes to develop a new iron ore mine in the East Pilbara and a connection to an existing iron ore railway. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment and Heritage on the environmental factors relevant to the proposal. Status: Final Proponent: Hope Downs Management Services Pty Ltd Release Date: 6 August 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.85 MB)
|
| 1023 | |
| Summary: Apache Northwest Pty Ltd proposes to construct two offshore mini platforms and install undersea pipelines connecting existing oil/gas wells to Apache's existing Varanus Island Hub facility. The Simpson Development is expected to run for approximately 10 years. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for Environment and Heritage on the environmental factors relevant to the proposal. Status: Final Proponent: Apache Northwest Pty Ltd Release Date: 30 July 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 619.7 KB)
|
| 1022 | |
| Summary: The project was originally approved in December 1990 and has since been the subject of four reviews under section 46 of the EP Act. The first and second reviews were for expansions of the proposal and the third review was for an extension of the approval period, which had expired in December 1995. The most recent review was approved in October 1996 under Statement 430 for an expansion of the proposal, and included an approval period of only two years, which expired in October 1998. This two year approval period was included because of the extension of approval already granted to this proposal. Status: Final Proponent: WMC Resources Ltd Release Date: 30 July 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 10.23 KB)
|
| 1021 | |
| Summary: Water Corporation of Western Australia, proposes to construct an ocean outlet at the Bunbury wastewater treatment plant to replace the existing disposal via lagoons and to allow disposal of up to 6000 ML/annum (forecasted for the year 2040) of treated wastewater to the ocean. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment and Heritage on the environmental factors relevant to the proposal. Status: Final Proponent: Water Corporation Release Date: 9 July 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 148.25 KB)
|
| 1020 | |
| Summary: This report provides the Environmental Protection Authority's (EPA's) advice to the Minister for the Environment and Heritage on the strategic assessment of the proposal by the Gas Pipeline Sale Steering Committee (GPSSC) on behalf of the Western Australian State Government to establish a land corridor from the Dampier to Bunbury Natural Gas Pipeline to the Oakajee Industrial Estate. The corridor is needed in order to enable future lateral gas pipelines to be constructed to service industries on the Oakajee Estate. Status: Final Proponent: Gas Pipeline Sale Steering Committee Release Date: 9 July 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 1.05 MB)
|
| 1019 | |
| Summary: This report provides the Environmental Protection Authority's (EPA) advice to the Minister for the Environment and Heritage on the strategic assessment on the proposal by Western Australian Government to expand the land corridor for the Dampier to Bullsbrook section of the Dampier to Bunbury Natural Gas Pipeline (DBNGP). Status: Final Proponent: Gas Pipeline Sale Steering Committee Release Date: 1 July 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 7.04 MB)
|
| 1018 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on proposed Amendment No. 300 to the City of Rockingham Town Planning Scheme No. 1. This Amendment proposes to rezone Part Lots 306 & 16 and Lots 313 & 774 Fifty Road, Baldivis, from "Rural" to residential "Development" zone. Status: Final Proponent: City of Rockingham Release Date: 2 June 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 191.2 KB)
|
| 1017 | |
| Summary: Broome International Airport Holdings proposes to construct and operate a new international airport at a site approximately 12 km north-east of Broome townsite. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment and Heritage on the environmental factors relevant to the proposal. Status: Final Proponent: Broome International Airport Holdings Release Date: 5 June 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 560.56 KB)
|
| 1016 | |
| Summary: This report provides the second part of the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment and Heritage on a proposal by Wesfarmers Sugar Company Pty Ltd, Marubeni Corporation and the Water Corporation of Western Australia to develop an export-based raw sugar industry on the Weaber, Keep River and Knox Creek Plains, near Kununurra in the Kimberley region of Western Australia (WA). Status: Final Proponent: Wesfarmers Sugar Company Pty Ltd, Marubeni Corporation and Water Corporation of Western Australia Release Date: 5 May 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 701.98 KB)
|
| 1015 | |
| Summary: The Commonwealth of Australia and the State of Western Australia signed the Regional Forest Agreement (RFA) on 4 May 1999. The RFA established a system of Formal and Informal Comprehensive, Adequate and Representative (CAR) Reserves. Such Reserves are located throughout the area defined as the RFA boundary, and some are within Alcoa of Australia's Mining Lease (ML) 1SA. Status: Final Proponent: Alcoa of Australia Release Date: 23 April 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 377.85 KB)
|
| 1014 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment and Heritage on the environmental factors relevant to a proposal by the Water Corporation to construct and operate a seawater supply and desalination system on the Burrup Peninsula. Status: Final Proponent: Water Corporation Release Date: 7 May 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 869.61 KB)
|
| 1013 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by Main Roads Western Australia (MRWA) to construct and operate a road/rail corridor to provide direct access to the Port of Geraldton from the Geraldton-Mt Magnet Road, Walkaway Road and North West Coastal Highway. Status: Final Proponent: Main Roads Western Australia Release Date: 7 May 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 229.26 KB)
|
| 1012 | |
| Summary: Proposal under S46 of the EP Act to increase phosphorus discharge limit. Status: Final Release Date: 7 May 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 860.51 KB)
|
| 1011 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to the proposal by the Water Corporation to construct a new Wastewater Treatment Plant (WWTP) at Kemerton and woodlot for irrigation of the treated wastewater at Binningup. Status: Final Proponent: Water Corporation Release Date: 30 April 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 393.43 KB)
|
| 1010 | |
| Summary: The Minister requested "that the EPA review the report and protocol prepared by the Dieback Consultative Council and provide advice in the context of the environmental significance of Phytophthora cinnamomi (dieback) and implications of the protocol for its management in Western Australia". Status: Final Proponent: Dieback Consultative Council Release Date: 19 March 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 119.65 KB)
|
| 1009 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the City of Armadale Town Planning Scheme No. 2 Amendment No. 134. This Amendment proposes the rezoning of Lot 1 Hilbert Road, Brookdale, from Rural "X" to Residential "Development Area". Status: Final Proponent: City of Armadale Release Date: 5 March 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 283.77 KB)
|
| 1008 | |
| Summary: On September 22, a Ministerial Order was issued allowing the proponent to operate at a higher level of 500mg/m3. Status: Final Release Date: 15 January 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 93.24 KB)
|
| 1007 | |
| Summary: This is not an assessment of the Environmental Protection Authority under Part IV of the Environmental Protection Act 1986. The EPA strongly endorses Bush Forever as a sound approach for providing formal recognition of the value of Perth’s biodiversity and a commitment to a comprehensive plan for its conservation. There is an opportunity in Perth, unlike many other capital cities in the world, to conserve and maintain examples of much of the city’s rich natural biological heritage. Bush Forever is a key government initiative of long-term significance in achieving this objective. Bush Forever provides a framework for environmental planning for Perth that goes beyond biodiversity conservation, linking the landscape, cultural, community and educational values that help define the character and identity of this city. Status: Final Release Date: 15 January 2001 Appeals close Click here to view the document (file type: Acrobat PDF file size: 189.09 KB)
|
| 1006 | |
| Summary: Change to environmental conditions to increase production from 3.3 million tonnes to 3.65 millin tonnes. Status: Final Release Date: 8 December 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 152.01 KB)
|
| 1005 | |
| Summary: Waste Management (WA) (the proponent) requested a review of the environmental conditions and commitments, and changes to the operational management and transport procedures for intractable waste disposal at Mt Walton East. Status: Final Proponent: Waste Management (WA) Release Date: 8 December 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 428.96 KB)
|
| 1004 | |
| Summary: Global Olivine Western Australia (GOWA) proposes to build and operate a Waste to Energy and Water Plant at Lot 15 Mason Road, Kwinana. This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the environmental factors relevant to the proposal. Status: Final Proponent: Waste Management (WA) Release Date: 8 December 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 326.27 KB)
|
| 1003 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors relevant to a proposal by Main Roads Western Australia (MRWA) to upgrade sections of the existing Useless Loop Road, Shark Bay. Status: Final Proponent: Main Roads Western Australia Release Date: 8 December 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 808.31 KB)
|
| 1002 | |
| Summary: This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental assessment of a proposal to extend the northern suburbs rail transit system from Currambine to Butler (Figure 1). The proponent for the proposal is the Department of Transport (DoT). Status: Final Proponent: Department of Transport Release Date: 8 December 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 71.63 KB)
|
| 1001 | |
| Summary: The North-East Corridor Extension Strategy has been prepared by the Western Australian Planning Commission (WAPC) to provide guidance and direction to future development in the Ellen Brook catchment within the Shire of Chittering and the City of Swan (WAPC 2000). Status: Final Proponent: Western Australian Planning Commission Release Date: 8 December 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 222.4 KB)
|
| 1000 | |
| Summary: This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the proposal by Mr W O'Halloran (the proponent and landowner) to clear approximately 184 hectares of native vegetation on Kent Location 1766 in the Shire of Kent for agricultural purposes. The proponent has indicated that the purpose for the proposed clearing is for growing wheat, lupins and sheep. Status: Final Proponent: Mr W O'Halloran Release Date: 4 December 2000 Appeals close Click here to view the document (file type: Acrobat PDF file size: 988.32 KB)
|